The withYears() method of Period Class is used to obtain a period with specified number of years. This number of years is passed as the parameter as integer value.
Syntax:
Java
Java
public Period withYears(int numberOfYears)Parameters: This method accepts a parameter numberOfYears which is the number of years to be changed in this Period. Returns: This function returns a Period with the number of years passed as the parameter. Below is the implementation of Period.withYears() method: Example 1:
// Java code to demonstrate withYears() method
import java.time.Period;
class GFG {
public static void main(String[] args)
{
// Get the String to be withYearsd
String period = "P1Y2M21D";
// Parse the String into Period
Period p = Period.parse(period);
System.out.println("Period: " + p);
// Get the number of years
int numberOfYears = 5;
// Change the numberOfYears of this Period
// using withYears() method
System.out.println("New Period: "
+ p.withYears(numberOfYears));
}
}
Output:
Example 2:
Period: P1Y2M21D New Period: P5Y2M21D
// Java code to demonstrate withYears() method
import java.time.Period;
class GFG {
public static void main(String[] args)
{
// Get the String to be withYearsd
String period = "-P1Y2M21D";
// Parse the String into Period
Period p = Period.parse(period);
System.out.println("Period: " + p);
// Get the number of years
int numberOfYears = -5;
// Change the numberOfYears of this Period
// using withYears() method
System.out.println("New Period: "
+ p.withYears(numberOfYears));
}
}
Output:
Reference: https://docs.oracle.com/javase/9/docs/api/java/time/Period.html#withYears-int-Period: P-1Y-2M-21D New Period: P-5Y-2M-21D