Document Control: Rev. No. Date

This document details revisions made to a draft analysis on November 9th, 2012. The initial draft analysis had a cost of $140 million with additional costs of $7 million. An amended draft totaled $207 million and the final version included an additional $1 million for improvements, bringing the total to $200 million. The draft, amended draft, and final version were reviewed by INTAN and approved by AHMAD.

Uploaded by

Gunawan Achmad
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views3 pages

Document Control: Rev. No. Date

This document details revisions made to a draft analysis on November 9th, 2012. The initial draft analysis had a cost of $140 million with additional costs of $7 million. An amended draft totaled $207 million and the final version included an additional $1 million for improvements, bringing the total to $200 million. The draft, amended draft, and final version were reviewed by INTAN and approved by AHMAD.

Uploaded by

Gunawan Achmad
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

DOCUMENT CONTROL

Rev. No.

Date
1

09-Nov-12

140,000,000.00
7,000,000.00
207,000,000.00
Final-Improvements ad

Autor

Revision Details
MP DRAFT ANALISYS

GNW

1,000,000.00
200.00
200,000,000.00
60,000,000.00

Reviewer

11/9/2012

Draft
per lahan
nd

3 Draft
140,000,000.00
7,000,000.00 Amended Draft
207,000,000.00
Final
Final-Improvements added

INTAN

Reviewer

Approver
AHMAD