ANALISA HARGA SATUAN PEKERJAAN : BETON DINDING MUTU K-300 / M3 HARGA SAT. (Rp.) JUMLAH (Rp.
NO.
URAIAN PEKERJAAN
VOLUME
SATUAN
UPAH - Cor, perataan, curing & pembersihan BAHAN - Ready mixed concrete K-250, batu split ALAT - Kereta sorong, talang, vibrator & alat bantu lainnya
1.000
m3
50,000.00
50,000.00
II
1.030
m3
885,500.00
912,065.00
III
1.000
m3
5,000.00
5,000.00 967,065.00 116,047.80 1,083,112.80 1,083,112.80
Total Overhead, PPh & Contractor Fee. : (12 %) Total Rounded
ANALISA HARGA SATUAN PEKERJAAN : WATERPROOFING INTEGRAL 2,00 ltr / M3
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA SAT. (Rp.) JUMLAH (Rp.)
UPAH - Pasang Waterproofing Integral BAHAN - Waterproofing integral ex. SIKA type Visconcrete 10 single component konsumsi 2,00 ltr/m3 ALAT
1.000
m3
5,000.00
5,000.00
II
2.000
liter/m3
50,000.00
100,000.00
III
Total Overhead, PPh & Contractor Fee. : (12 %) Total Rounded
105,000.00 12,600.00 117,600.00 117,600.00