The document provides an analysis of unit prices for concrete wall construction with a strength of K-300 per cubic meter and for waterproofing integral work. The concrete work analysis includes labor for placing, leveling, curing and cleaning concrete with a ready mix strength of K-250, stone chips, and equipment like concrete pumps, tanks, vibrators and other tools. The waterproofing analysis includes labor for installing waterproofing integral material consuming 2 liters per cubic meter, with the material being Sika type Visconcrete 10 single component waterproofing and necessary equipment. Both analyses include overhead costs, taxes and contractor fees calculated at 12% of the total.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5K views1 page

K300 Sika6

The document provides an analysis of unit prices for concrete wall construction with a strength of K-300 per cubic meter and for waterproofing integral work. The concrete work analysis includes labor for placing, leveling, curing and cleaning concrete with a ready mix strength of K-250, stone chips, and equipment like concrete pumps, tanks, vibrators and other tools. The waterproofing analysis includes labor for installing waterproofing integral material consuming 2 liters per cubic meter, with the material being Sika type Visconcrete 10 single component waterproofing and necessary equipment. Both analyses include overhead costs, taxes and contractor fees calculated at 12% of the total.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Waterproofing Integral Pekerjaan
  • Beton Dinding Pekerjaan

ANALISA HARGA SATUAN PEKERJAAN : BETON DINDING MUTU K-300 / M3 HARGA SAT. (Rp.) JUMLAH (Rp.

NO.

URAIAN PEKERJAAN

VOLUME

SATUAN

UPAH - Cor, perataan, curing & pembersihan BAHAN - Ready mixed concrete K-250, batu split ALAT - Kereta sorong, talang, vibrator & alat bantu lainnya

1.000

m3

50,000.00

50,000.00

II

1.030

m3

885,500.00

912,065.00

III

1.000

m3

5,000.00

5,000.00 967,065.00 116,047.80 1,083,112.80 1,083,112.80

Total Overhead, PPh & Contractor Fee. : (12 %) Total Rounded

ANALISA HARGA SATUAN PEKERJAAN : WATERPROOFING INTEGRAL 2,00 ltr / M3


NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA SAT. (Rp.) JUMLAH (Rp.)

UPAH - Pasang Waterproofing Integral BAHAN - Waterproofing integral ex. SIKA type Visconcrete 10 single component konsumsi 2,00 ltr/m3 ALAT

1.000

m3

5,000.00

5,000.00

II

2.000

liter/m3

50,000.00

100,000.00

III

Total Overhead, PPh & Contractor Fee. : (12 %) Total Rounded

105,000.00 12,600.00 117,600.00 117,600.00