Organization: Location: Date: Building : Name:
Safety Inspection Checklist Overhead Crane Inspections 01. 02. 03. 04. 0$. 0&. 0'. 0). 0,. 10. Is the rated load of the crane plainly marked on each side? If the crane has more than one hoisting unit, does each hoist have its rated load marked on it or its load block? Is this marking clearly legible from the ground or floor? Is there a minimum clearance of hree !3" inches overhead and t#o !2" inches laterally provided and maintained bet#een crane and obstructions? %re only designated personnel permitted to operate the crane? %re stops provided at the limits of travel of the trolley? %re bumpers capable of stopping the crane provided #here re(uired? *o the sheaves and ropes of hoisting e(uipment meet the re(uirements of+ %re periodic inspections performed on cranes, hooks, ropes, slings, chains, - hoists in accordance #ith %re all ne# cranes and e.tensively repaired or altered lifting devices load tested at 120 / prior to use ? Is evidence of the test readily available in the form of the 01234 #ritten certification or maintenance records? %re crane hooks inspected during annual inspection for cracks utili5ing magnetic particles or other suitable crack detection 6 inspection methods? %re crane hooks removed from service #hen the throat opening e.ceeds more than 1$ / of normal, or the hook sho#s more than a 10 degree t#ist from the plane of the unbent hook or sho#s signs of cracks? *o hooks have safety closure latches properly positioned and functional? %re hoists, chains, slings and hooks marked to indicate the item identification number, load rating and ne.t periodic inspection date?
es
No
N!"
"ny Specific o#servations or Comments
11. 12.
13. 14.