Acrelic Tow Stretch Breaking Drawing Finisher Drawing Roving Spinning Cone Winding Doubler Twisting Reeling Steaming Packing Yarn Name of Stage

The document describes different stages of yarn production including acrelic tow, stretching, drawing, roving, spinning, doubling, twisting, reeling, steaming, packing. It notes the raw materials come from UK/Italy and can be mixed with natural fibers. It provides output capacities for different machines and stages ranging from 4000-6000 kg/day. It discusses optimal settings and problems that can occur if settings are not proper like bobbins filling too quickly, line breaks, and needing to slow machines.

Uploaded by

saadsahil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views1 page

Acrelic Tow Stretch Breaking Drawing Finisher Drawing Roving Spinning Cone Winding Doubler Twisting Reeling Steaming Packing Yarn Name of Stage

The document describes different stages of yarn production including acrelic tow, stretching, drawing, roving, spinning, doubling, twisting, reeling, steaming, packing. It notes the raw materials come from UK/Italy and can be mixed with natural fibers. It provides output capacities for different machines and stages ranging from 4000-6000 kg/day. It discusses optimal settings and problems that can occur if settings are not proper like bobbins filling too quickly, line breaks, and needing to slow machines.

Uploaded by

saadsahil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Acrelic Tow

Stretch Breaking

Drawing

Finisher Drawing

Roving

Name of Stage Spinning Input/Output

Cone Winding

Doubler Twisting

Reeling

Steaming

Packing

Yarn

Raw Material From UK/Italy due to superior quality

Can also go straight to packing Natural fibres can be mixed with Acrelic here Machine Information 3 Machines 3 Machines Repeated twice Set up time for frames 0.5 hour

Output

4000 kg/day

6000 kg/day 4500 kg/day *2000 kg/day/machine

Capacity Depens on # ofspindles, number ofrevolutions of spindles, twists per mtere and count of yarn Depends on type of yarn and Hall Hall 1 SD - 1854 Hall 2 SD - 2200 Hall 1 Hanks - 1854 Hall 2 Hanks - 2200 Hall 1 3-ply -2000 Hall 2 3-ply - 2500 3 ply - 330 twists per metre SD - 440 tpm Hanks - 440tpm 48 count - 500 tpm

1.5% Waste

Wastage and Problems Optimum ring diametre: 3ply - 6065mm. if less than optimal the bobbins fill after every hour. SD and Hanks replace bobbins after 5-5.5 hours But SD and Hanks placed on 65mm casues problems. Line breaks and it is production loss. Hall1 produced 42 count 55mm used to prodice 3ply if emergency. But machine had to be slowed and only Japenese machine could do it.