Site Organization

The document outlines a tentative site organization structure for a construction project with one project manager overseeing a construction manager, quality control manager, planning engineer, safety manager, and accountant. It then shows the organizational reporting structure flowing down from chief surveyor to various computer operators, surveyors, and foremen overseeing teams of masons, plumbers, electricians, welders, and equipment operators.

Uploaded by

hannykhawaja
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
205 views1 page

Site Organization

The document outlines a tentative site organization structure for a construction project with one project manager overseeing a construction manager, quality control manager, planning engineer, safety manager, and accountant. It then shows the organizational reporting structure flowing down from chief surveyor to various computer operators, surveyors, and foremen overseeing teams of masons, plumbers, electricians, welders, and equipment operators.

Uploaded by

hannykhawaja
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

TENTATIVE SITE ORGANIZATION

Project Manager

Construction Quality
Manager control
Admn Officer Accountant
Incharge
Planning
Safety
Engineer
Incharge
Computer Quantity S.L.T
Computer
Operator Surveyor
Chief Operator
Cashier .L.T L..T
Surveyor
Computer
Operator
2 Surveyor/Helper
Head Fore Man Fore Man
(Typical Team) Fore Man

1 2-3
1-2 3 Masons
Electrician
Welders Plumbers

2 Water 2 Dumper
1 Dozer 1Excavator 1Grader 1 Roller 2 Tractor Welder
Bowser