Pioneer Gas Power Plant Control Systems

The document discusses the control systems for a 380-425 MW combined cycle power plant. It specifies that the control, monitoring, and logging of each generator and subsystem shall be provided on computer screens. Limited backup controls like synchronization, essential controls, metering and alarms shall also be available from the Electrical Control Panel. It outlines the requirements for starting, voltage and speed control, synchronization initiation, operation, alarms and data logging for the generator and excitation system from the computer screens. The Electrical Control Panel shall include mimics of the generator, subsystems and auxiliary power supply systems along with synchronization equipment, switches and indicators for control of the generator and auxiliary systems. Interlocks for the auxiliary power supply system shall be hardwired.

Uploaded by

Chava Teja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views2 pages

Pioneer Gas Power Plant Control Systems

The document discusses the control systems for a 380-425 MW combined cycle power plant. It specifies that the control, monitoring, and logging of each generator and subsystem shall be provided on computer screens. Limited backup controls like synchronization, essential controls, metering and alarms shall also be available from the Electrical Control Panel. It outlines the requirements for starting, voltage and speed control, synchronization initiation, operation, alarms and data logging for the generator and excitation system from the computer screens. The Electrical Control Panel shall include mimics of the generator, subsystems and auxiliary power supply systems along with synchronization equipment, switches and indicators for control of the generator and auxiliary systems. Interlocks for the auxiliary power supply system shall be hardwired.

Uploaded by

Chava Teja
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PIONEER GAS POWER LTD.

380-425 MW COMBINED CYCLE POWER PLANT


APSIPL-05- EPC-
3-B6 ELECTRICAL SYSTEMS -
ELECTRICAL CONTROL PANEL / BACKUP CONTROL
PANEL

Page 1 of 2
6.0 GENERATOR CONTROL

6.1 The control, monitoring, measurement, reading, annunciation,
synchronising and sequential event logging for each generator and
its subsystem shall be provided on the CRTs. Also, certain limited
back-up facilities viz., synchronising, essential controls, metering
and annunciation shall also be available from the Electrical Control
Panel (ECP).

6.2 Generator and Auxiliary Power Supply System Control &
Monitoring

6.2.1 Provision in the plant control system shall be made for the starting,
bringing upto rated voltage and speed, initiation of synchronising,
operation and annunciation on ECP and monitoring, alarm, data
logging, recording and sequential event recording for generator and
its excitation system from the CRTs. The minimum requirements of
the measurements are indicated in the Single Line Diagram.

6.2.2 In the ECP, the mimic of the generator, its subsystems and 6.6 kV
& 415V auxiliary power supply system shall be provided.

6.2.3 Synchronising equipment consisting of Auto synchroniser, double
voltmeter, double frequency meter, synchroscope, check
synchronising relay, synchronising lamp, etc., shall be provided in
the hardwired ECP as follows:

(a) One set for generators.
(b) One set for 6.6 kV / 415V breakers, DG set breaker.
(c) Auto synchroniser relay for generator (25A): Auto synchroniser
shall connect the generator to the 220 kV grid automatically
after synchronising the two systems. The equipment shall be
supplied to control both the voltage and frequency of turbine
generator set to match with those of the grid.

6.2.4 The ECP shall be provided with all the synchronising switches,
selector switches, push buttons, indicating lamps as needed for the
control of the systems envisaged.

PIONEER GAS POWER LTD.
380-425 MW COMBINED CYCLE POWER PLANT
APSIPL-05- EPC-
3-B6 ELECTRICAL SYSTEMS -
ELECTRICAL CONTROL PANEL / BACKUP CONTROL
PANEL

Page 2 of 2

6.2.5 The interlocks for the auxiliary power supply system shall be
hardwired interlocks.

6.2.6 This shall be read in conjunction requirements with requirements
indicated in I&C SectionC-4.