Project Name: Report No.
:
3
D.M. Consunji, Inc.
BUS BAR BOLT TIGHTENING REPORT
150MW-C-022-0
Elevation No.:
NO. SYSTEM
BOLT
DIA.
(mm)
Required Torque Value (N.m)
Actual Torque
Value
Max (100%)
Project name: 2x150 MW CFB COAL FIRED POWER PLANT
Date: Page No.:
Remarks
DMCI-Operation Department
DATE
NAME
SIGNATURE
HPCC1
DMCI-QA/QC Department
2
1