River Water Intake System Overview

The document discusses a recent visit to the GK Pumping Station in Bheramara, Bangladesh. It includes photos of the river water intake channel, pump house, dredging pump and barge used to maintain the intake by removing 3-4 meters of silt deposited each year. Specifications are provided for the river water pumps, pump motors, and makeup water system. Key details from the pumping station officials are that the intake channel length will be 50 meters based on reports, and the minimum water level of the Padma river is +4.8 meters. Annual maintenance takes around 45 days to dredge the silt using the pump and barge arrangement.

Uploaded by

jacs127
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
178 views9 pages

River Water Intake System Overview

The document discusses a recent visit to the GK Pumping Station in Bheramara, Bangladesh. It includes photos of the river water intake channel, pump house, dredging pump and barge used to maintain the intake by removing 3-4 meters of silt deposited each year. Specifications are provided for the river water pumps, pump motors, and makeup water system. Key details from the pumping station officials are that the intake channel length will be 50 meters based on reports, and the minimum water level of the Padma river is +4.8 meters. Annual maintenance takes around 45 days to dredge the silt using the pump and barge arrangement.

Uploaded by

jacs127
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

GLIMPSES OF RIVER WATER INTAKE SYSTEM DURING RECENT VISIT TO

GK PUMPING STATION, BHERAMARA


River Water Intake Channel (Photo taken from Pump House side)

River Water Intake Pump House

Dredging Pump and Barge Arrangement (Dredging maintenance work


taken from Nov 15 to Dec. 31 every year)

Dredging Pump and Barge Arrangement


(Avg. Silt deposit is about 3m - 4 m)

Remote sensing Water Depth Measurement

River Water Pump Technical Specifications

River Water Pump Motor Technical Specifications

Make up water System- using 3 nos. Bore Wells

In our case, the same arrangement of Intake Channel and Pump house can be made. As
per the Bathymetric Report, the length of Intake Channel shall be 50 m.

As confirmed by GK Pumping Station Officials, the water Level of Padma drops to


minimum of +4.8m.

Siltation of around 3-4 meters occurs every year and GK pumping station takes annual
maintenance period is about 45 days. For the maintenance activity they have kept a
dredging pump and barge as shown in one of the above snapshot.