The document is a checklist containing 16 areas of a facility to inspect on different dates and times. For each inspection date, the checklist includes fields to record the time and any notes for each of the 16 areas, including the front entrance, store areas, parking lots, gas area, lobby, offices, waste water treatment area, production area, loading docks, mosque, and painting areas.