Area
Utilities
Cooling Tower
Cooling Tower Equations
Tower Makeup = Evaporation + Windage/drift+ Cooling Tower blow down
Makeup * Xm = Evaporation * 0+ Windage * Xb+ Blow down * Xb
Blow down = (Windage* (Xb/Xm-1)-Evaporation)/(1-Xb/Xm)
Value
Units
Value
After Water Treatment
Upgrade
Present
Windage
Tower Recirculation
Windage Rate
Windage
Evaporation
Delta T
Evaporation
Blow down
Cycles of Concentration
Blowdown
Cooling Tower Makeup
Units
9,900
0.1%
14,256
gpm
%
gpd
9,900
0.1%
14,256
gpm
%
gpd
8
114,048
F
gpd
8
114,048
F
gpd
#
4
23,760
number
gpd
152,064
gpd
20,000
13,300
10,000
3,325
lbs/hour
lbs/hour
lbs/hour
lbs/hour
Cooling Tower Makeup + Boiler Makeup
Water Treatment Wastewaters
Total Inputs into Utilities
190,337
9,517
199,854
Evaporation
Utilites Wastewater
8
2,037
number
gpd
130,341
gpd
20,000
11,000
10,000
1,000
lbs/hour
lbs/hour
lbs/hour
gpd
gpd
gpd
gpd
161,995
1,000
162,995
gpd
gpd
gpd
157,081
42,845
gpd
gpd
157,081
4,037
gpd
gpd
30,000
gpd
30,000
gpd
29,000
5,000
34,000
gpd
gpd
gpd
29,000
0
29,000
gpd
gpd
gpd
Boiler
Steam Generation
Boiler Makeup
Returned Condensate
Blowdown @ 4 cycles
38,273 gpd
9,568 gpd
Cooling Tower & Boiler Inputs & Outputs
Sanitary
1200 people time 25 gallons/person/shift
Irrigation
Count number of heads per zone multiply by rated
capacity multiply by sprinkling time. Sum the flows
for all zones
Estimated leaks based upon engineering judgment
Water Reduction
Water
Reduction
(gpd)
36,859
5,000
36,859