The Purchasing Managers' Index (PMI) fell to 53.2 in August from 55.2 in July, indicating slower manufacturing growth. Production slowed the most, contributing negatively by 1.4 points. New orders decreased modestly both domestically and in export markets. While production growth remains robust, the production index has been volatile in summer months. Commodity prices fell after rising for five months, though currency movements moderated the decline.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views8 pages

Pmi - Aug 2015

The Purchasing Managers' Index (PMI) fell to 53.2 in August from 55.2 in July, indicating slower manufacturing growth. Production slowed the most, contributing negatively by 1.4 points. New orders decreased modestly both domestically and in export markets. While production growth remains robust, the production index has been volatile in summer months. Commodity prices fell after rising for five months, though currency movements moderated the decline.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Purchasing Managers Index

1 September 2015

PMI fell to 53.2 in August production growth wanes


The PMI fell by 2.0 points to 53.2 in August from 55.2 in July. The picture of steady
growth in manufacturing continues, but has become slightly blurrier. All
subcomponents, except for inventories of purchased materials, contributed
negatively during the month; with production slowing the main index the most.
The sub-index for new orders decreased by 1.2 points to 54.6 in August. Underlying
growth was nearly as good domestically and in the export market with index
readings of 51.8 and 51.5, respectively. This means that domestic and export orders
both fell modestly from July, when the two indices reached 52.0.
The production sub-index has been volatile during the summer months and noted a
decline in August. The sub-index, which fell from 60.8 to 55.4, contributed negatively
to the PMI by 1.4 points. Despite the downturn, production growth is robust and the
outlook is bright. The index for planned production rose from 60.5 in July to 60.9 in
August. The fact that the employment sub-index touched the 50 mark, with a
reading of 50.5, at the same time as actual production increased may signal that
companies are prioritizing higher productivity.
Prices of suppliers commodity and intermediate goods fell in August after having
risen for five months. The index dropped to 49.0, down 4.8 points from July. August
stood out for a broad decline in metal prices, though rising prices of plastic raw
materials and a weaker SEK exchange rate moderated the downturn.
PMI
(Purchasing
Managers Index)

Seasonally
adjusted

2015 Aug
Jul
Jun
May
Apr
Mar
Feb
Jan
2014 Dec
Nov
Oct
Sep
Aug
Next publication of Purchasing Managers Index: Thursday, 1 October 2015

Cathrine Danin, Swedbank Macro Research, tfn +46 (0) 70-540 68 78, [Link]@[Link]
Sebastian Bergfelt, Silf, tfn +46 (0) 73-944 64 50, medlem@[Link]

1 (8)

53.2
55.2
52.8
54.8
55.7
54.1
53.3
55.2
55.4
52.7
52.1
53.3
51.0

Inkpschefsindex
avseende augusti mnad 2015, fortsttning

PMI-total reverserade efter juli mnads uppgng till 55,2. I augusti var huvudindex
53,2 med negativa bidrag frn samtliga delkomponenter (exkluderat delindex fr lager
av inkpt material vars bidrag var neutralt). Det var frmst produktionen som backade
vilket frklarar drygt 70 procent av mnadens inbromsning. Delindex fr produktion har
varit volatil under sommarmnaderna och br tolkas med en viss frsiktighet.
Delindex fr orderingng fll frn 55,8 i juli till 54,6 i augusti, vilket bidrog med -0,4
indexenheter till PMI. Trots nedgngen har delindex registrerats i tillvxtzonen i ver 30
mnader och fyra gnger i r har noteringarna varit ver 55-nivn. I augusti uppvisade
orderingngen frn hemma- och exportmarknaden likartad underliggande styrka. Index
var 51,8 (52,0 i juli) fr domestik orderingng och 51,5 (52,0 i juli) fr exportorder.

Orderingng
70

70

60

60

50

50

40

40

30

30

20
10

20

Ssongrensat
Orensat

07

08

10
09

10

11

12

13

14

15

Index fr orderstockarna fll tillbaka i augusti och lg med nd och nppe kvar i
tillvxtzonen. Med ett indextal p 50,9 var utfallet det lgsta sedan september ifjol.
ven om den mnatliga nedgngen var 4,4 indexenheter visar ett genomsnitt fr de tre
senaste mnaderna en marginell uppgng kontra nrmast fregende
tremnadersperiod.

Orderstock
60

60

50

50

40

40

30

30

20
10

20

Ssongrensat
Orensat

07

08

10
09

10

11

2 (8)

12

13

14

15

Inkpschefsindex
avseende augusti mnad 2015, fortsttning

Delindex fr produktion drev till strsta delen nedgngen av PMI efter ett fall frn 60,8
till 55,4 i augusti. Bidraget p -1,4 indexenheter frklarar drygt 70 procent av mnadens
inbromsning av konjunkturindikatorn. Trots att produktionen under sommarmnaderna
har varit volatil fortstter ett tre-mnaders glidande medelvrde att signalera en stadig
tillvxttakt.

Produktion
70

70

60

60

50

50

40

40

30

30

20
10

Ssongrensat
Orensat

07

08

09

20
10
10

11

12

13

14

15

I kontrast mot delindex fr faktisk produktion steg index fr industrifretagens


produktionsplaner, om n marginellt. I juli noterades index till 60,5 och i augusti steg
det till 60,9. Att produktionsutsikterna var frdelaktiga kan bero p en fortsatt stigande
efterfrgan; svl delindex fr orderingng som index fr orderstockar noteras i
tillvxtzonen. Dessutom kade tillverkningen i augusti.

3 (8)

Inkpschefsindex
avseende augusti mnad 2015, fortsttning

Fr andra mnaden i rad fll delindex fr sysselsttning och nedgngen p 0,9


indexenheter gjorde att augustisiffran blev 50,5. Bidraget till PMI-total uppmttes till
-0,2 indexenheter. Nyanstllningsbehovet fortsatte drmed att stiga under rets sista
sommarmnad men kningstakten var svagare. Hsten fr visa ifall den mer dmpade
sysselsttningskningen r av temporr karaktr eller ej.

Delindex fr leverantrernas leveranstider minskade till 51,1 i augusti frn 51,4 i juli
men terigen steg ett glidande medelvrde fr de tre senaste mnaderna. Det innebr
att efterfrgetrycket i industrin har fortsatt att strkas jmfrt med vid rets inledning d
trenden var fallande.

4 (8)

Inkpschefsindex
avseende augusti mnad 2015, fortsttning

Delindex fr lager av inkpt material, som steg med 0,2 indexenheter till 47,6 i
augusti, bidrog neutralt till PMI-total. Sm frndringar i delindex fr lager kan sannolikt
frklaras av rdande oskerhet kring rvarumarknaderna och valutautsikterna samt
den lgre aktiviteten under sommarmnaderna.

Index fr leverantrernas r- och insatsvarupriser noterades till 49,0 i augusti efter att
ha legat i tillvxtzonen i fem mnader. Prisfallet har dock n s lnge inte satt avtryck
p den senaste tremnadersperioden som uppvisade stigande priser enligt ett
genomsnitt. Sannolikt har de lgre globala rvarupriserna, i synnerhet p metaller,
bidragit till avmattningen men valutakursfrndringar har samtidigt begrnsat
nedgngen.

Stigande priser i augusti


Antal mnader
Plastrvaror

Sjunkande priser i augusti


Antal mnader
Aluminium
Koppar
Stl

5 (8)

1
1
2

Inkpschefsindex
avseende augusti mnad 2015, fortsttning

Silf / Swedbanks inkpschefsindex - PMI, Ssongrensat


ICI Ingr i ICI
Totalindex

Orderingng

vriga nyckeltal
Produk tion

Syssel- Leveranssttning
tider

Lager

OrderOrderingng
ingng hemmaexport mark nad

Prognos
Orderstock

R/insatsvarupriser

Planerad
produk tion
nrmaste
Import
halvret

2011 jan

61,1

63,4

64,2

57,9

64,0

52,0

61,3

61,4

59,7

76,6

57,9

70,5

feb

60,6

59,2

64,5

61,0

66,5

54,1

58,6

55,8

57,5

76,6

59,8

70,1

mar

58,0

55,3

60,9

57,9

65,4

52,1

54,1

53,2

53,7

72,8

58,7

70,9

april

59,4

60,6

61,2

57,7

64,7

54,2

57,6

56,1

56,6

74,2

57,9

70,1

maj

55,7

54,8

59,2

54,2

61,1

55,5

52,3

56,0

55,2

63,0

56,1

68,5

jun

52,6

52,1

53,6

51,1

57,4

51,6

52,3

48,8

50,9

60,5

51,8

64,0

jul

49,7

45,0

48,5

53,5

55,3

50,0

46,6

43,1

48,9

51,2

49,9

63,0

aug

49,0

47,6

49,2

50,8

49,1

51,5

48,5

42,8

48,3

47,2

48,7

55,8

sep

48,0

46,6

48,9

49,8

47,4

52,0

48,4

46,4

47,2

46,7

45,8

53,9

okt

50,2

51,2

49,0

50,7

48,0

47,5

49,3

49,6

49,2

40,2

46,9

54,4

nov

47,8

47,6

46,4

48,4

45,6

45,9

48,0

46,4

45,4

42,5

44,6

51,9

dec

49,2

47,6

49,7

49,5

49,7

48,2

49,3

45,6

46,8

42,2

46,8

59,3

2012 jan

51,3

51,7

52,6

48,2

50,7

46,8

49,5

48,7

50,4

50,3

49,9

56,0

feb

50,2

49,4

51,7

48,3

52,2

51,1

48,7

48,4

47,7

52,7

50,5

57,1

mar

49,9

50,0

48,3

49,3

49,0

43,6

49,8

48,1

48,2

55,1

47,9

56,1

apr

50,1

50,7

50,9

46,8

49,2

46,0

52,0

47,8

52,5

52,6

48,3

54,8

maj

48,8

48,8

50,9

46,1

47,2

48,0

50,9

44,6

47,1

45,8

46,6

54,1

jun

48,2

46,0

50,8

46,4

46,9

45,9

49,9

43,9

46,3

43,8

48,4

53,4

jul

50,5

51,1

53,5

47,7

47,1

48,3

52,2

47,2

48,5

38,4

52,3

55,1

aug

45,3

41,3

46,3

45,0

45,2

45,2

43,4

41,5

42,1

41,4

45,7

48,6

sep

44,5

41,9

43,6

42,7

45,2

42,9

41,2

40,0

40,3

42,2

45,3

47,8

okt

43,3

40,5

40,7

43,0

40,4

37,2

43,4

38,1

38,3

39,3

42,2

42,9

nov

43,2

40,6

43,3

38,9

44,7

42,4

42,5

40,0

40,7

43,6

44,1

47,7

dec

44,8

41,7

45,7

40,5

45,2

40,1

43,8

39,6

40,1

48,6

41,5

48,8

2013 jan

49,2

49,7

53,9

41,0

50,3

49,3

48,8

46,8

45,6

50,7

50,3

54,9

feb

51,1

51,4

55,1

45,5

50,8

48,0

52,8

47,1

49,4

48,1

48,2

57,8

mar

52,1

55,3

54,7

44,2

51,1

46,5

52,8

51,1

53,3

46,1

48,9

60,7

apr

49,5

50,7

52,7

42,7

49,9

48,8

51,7

46,5

49,3

37,6

48,7

56,1

maj

52,0

55,5

55,1

46,3

45,8

45,9

50,8

51,4

48,4

41,6

45,5

59,1

jun

53,6

58,5

56,9

47,7

47,9

49,0

53,9

55,9

55,7

42,0

50,7

60,9

jul

51,2

52,0

55,7

45,0

48,0

45,4

50,6

51,1

48,5

44,7

50,2

55,8

aug

52,5

54,8

54,4

48,4

51,5

50,1

52,3

49,4

51,2

48,8

51,8

58,6

sep

56,0

60,0

57,4

51,7

52,8

46,2

57,2

55,7

56,1

47,6

51,7

60,8

okt

52,1

52,7

55,0

47,6

52,6

48,4

52,7

50,7

55,1

47,0

50,5

58,4

nov

56,0

57,3

62,7

50,2

53,3

48,5

52,2

54,2

54,2

49,7

54,4

60,0

dec

52,2

54,4

53,4

48,2

54,9

53,0

52,3

49,8

52,1

53,3

54,2

63,2

2014 jan
feb
mar
apr
maj
jun
jul
aug
sep
okt
nov
dec
2015 jan
feb
mar
apr
maj
jun
jul
aug

56,4
54,6
56,5
55,4
54,0
54,8
55,0
51,0
53,3
52,1
52,7
55,4
55,2
53,3
54,1
55,7
54,8
52,8
55,2
53,2

62,2
58,6
60,5
59,2
55,6
58,1
57,3
51,8
52,9
52,2
53,6
56,8
56,2
52,9
54,5
59,0
55,9
52,5
55,8
54,6

57,3
57,8
59,4
60,0
57,3
56,1
59,3
50,6
59,2
52,4
55,7
58,3
60,4
54,9
57,6
58,5
58,8
54,5
60,8
55,4

49,3
48,2
51,7
48,8
51,4
52,7
51,0
49,6
50,8
50,3
51,5
53,7
50,4
51,6
53,0
53,5
52,0
52,1
51,4
50,5

55,4
54,8
53,8
52,9
51,1
52,0
51,0
50,0
49,8
53,0
52,1
54,2
53,4
52,9
52,3
50,3
50,4
51,7
51,4
51,1

47,9
52,6
49,0
51,1
49,9
49,5
48,5
46,0
49,9
46,5
53,9
50,5
48,7
45,3
50,3
49,3
46,6
47,3
47,4
47,6

60,3
55,4
58,2
56,3
56,0
57,4
55,5
50,7
53,4
52,2
54,2
51,8
56,2
48,4
52,0
54,5
52,3
51,6
52,0
51,5

56,8
55,4
56,9
57,6
53,8
55,1
54,4
50,1
48,3
51,9
52,5
54,8
54,8
51,6
54,8
56,4
53,0
46,9
52,0
51,8

58,5
56,1
56,2
55,2
51,7
55,0
52,9
50,8
49,3
52,5
53,9
54,6
54,9
53,8
51,8
54,4
53,5
55,3
55,3
50,9

50,1
51,0
47,9
44,8
48,2
49,1
50,7
50,8
50,5
48,5
50,3
49,8
44,9
43,4
52,7
51,2
53,4
55,6
53,8
49,0

55,9
56,2
51,2
56,3
55,1
54,1
54,4
50,1
51,5
55,7
52,4
52,9
55,8
50,5
53,2
53,6
51,4
50,4
51,3
48,9

66,7
64,6
64,3
65,6
60,1
61,9
60,3
61,9
62,1
58,6
63,6
64,2
60,2
65,3
60,0
57,5
65,0
61,7
60,5
60,9

6 (8)

Inkpschefsindex
avseende augusti mnad 2015, fortsttning

Silf / Swedbanks inkpschefsindex - PMI, icke ssongrensat


ICI Ingr i ICI

vriga nyckeltal

Syssel- Leveranssttning
tider

OrderOrderingng
ingng hemmaexport mark nad

Prognos

Totalindex

Orderingng

Produk tion

2011 jan

59,4

62,7

62,3

54,9

60,6

50,7

61,5

59,6

59,0

75,3

57,3

71,7

feb

61,5

62,2

65,0

60,3

65,0

53,7

61,6

57,4

60,5

76,0

60,3

72,8

mar

59,6

58,6

63,9

57,6

65,0

53,1

56,9

55,1

56,8

74,0

60,8

73,0

apr

61,7

64,3

64,0

58,9

65,8

55,4

60,3

59,0

59,6

78,1

59,9

72,8

maj

57,7

57,3

62,3

56,1

62,9

57,5

54,0

58,4

57,8

66,0

57,8

69,4

jun

55,6

56,1

58,1

54,1

59,9

54,8

55,8

52,4

53,7

61,8

54,0

63,1

jul

45,8

39,0

39,0

53,5

56,9

52,0

43,1

38,1

47,5

50,5

46,0

62,4

aug

51,7

51,3

54,4

51,7

50,7

52,4

50,7

46,6

53,0

47,7

50,7

57,8

sep

49,4

46,8

51,6

51,3

49,4

51,6

48,1

48,1

46,5

48,4

47,1

52,5

okt

48,9

48,1

47,1

50,0

48,1

45,1

46,2

47,7

44,9

38,5

45,2

50,3

nov

45,2

42,6

42,9

47,4

43,5

43,4

43,8

42,9

39,6

39,0

42,6

48,4

dec

44,8

41,2

42,8

46,7

46,0

44,8

44,2

39,9

40,4

37,0

43,4

57,7

2012 jan

49,6

51,0

50,7

45,2

47,3

45,5

49,7

46,9

49,7

49,0

49,3

57,2

feb

51,1

52,4

53,1

47,6

50,7

50,7

51,7

50,0

50,7

52,5

51,0

59,8

mar

51,5

53,3

51,3

49,0

49,0

44,6

52,6

50,0

51,3

56,3

50,0

58,6

apr

52,4

54,4

54,7

48,0

50,3

47,2

54,7

50,7

55,5

56,5

50,3

57,5

maj

50,8

51,3

54,0

48,0

49,0

50,0

52,6

47,0

50,0

49,0

48,3

55,0

jun

51,2

50,0

55,3

49,4

49,4

49,1

53,4

47,5

49,1

45,1

50,6

52,5

jul

46,6

45,8

44,2

47,7

48,7

50,3

48,7

42,2

47,1

37,0

48,4

54,5

aug

48,0

45,0

51,5

45,9

46,8

46,1

45,6

45,3

46,8

41,9

47,7

50,6

sep

45,9

42,1

46,3

44,2

47,2

42,5

40,9

41,7

39,6

43,9

46,6

46,4

okt

42,0

37,4

38,0

42,3

40,5

34,0

40,0

36,0

34,0

37,6

40,5

38,0

nov

40,6

35,6

39,0

37,9

42,6

39,9

38,0

36,5

34,9

40,1

42,1

44,2

dec

40,4

35,0

38,8

37,7

41,5

36,0

38,8

33,9

33,6

44,1

38,0

47,2

2013 jan

47,5

49,0

52,0

38,0

47,0

48,0

49,0

44,9

45,0

49,3

49,7

56,1

feb

52,0

54,4

56,4

44,8

49,3

47,6

55,8

48,6

52,4

48,0

48,6

60,5

mar

53,7

58,7

57,7

43,9

51,0

47,6

55,7

53,0

56,4

47,3

51,0

63,2

apr

51,9

54,4

56,4

44,0

51,0

50,0

54,4

49,3

52,4

41,5

50,7

58,7

maj

54,0

57,9

58,3

48,3

47,6

47,9

52,4

53,8

51,0

44,8

47,2

60,0

jun
jul
aug
sep
okt
nov
dec

56,6
47,3
55,2
57,4
50,8
53,4
47,8

62,5

61,4

50,7

50,4

52,2

57,4

59,6

58,5

43,3

52,9

60,1

46,7
58,6
60,2
49,6
52,3
48,0

46,4
59,6
60,1
53,1
59,2
46,5

45,1
49,3
53,3
46,9
49,2
45,3

49,6
53,1
54,8
52,7
51,2

47,1
54,5
56,9
49,6
48,0
47,3

45,2
51,1
57,4
48,8
50,8

48,8

46,3
53,8
52,9
48,8
52,4
50,8

55,2
60,6
59,5
54,3
56,5

44,1

47,2
55,9
55,4
50,8
48,5
45,7

44,0
49,3
49,3
45,3
46,2

51,2

47,4
51,1
45,9
46,0
46,0
49,6

2014 jan
feb
mar
apr
maj
jun
jul
aug
sep
okt
nov
dec
2015 jan
feb
mar
apr
maj
jun
jul
aug

54,7
55,6
58,1
57,7
56,0
57,8
51,2
53,7
54,7
50,8
50,1
51,0
53,5
54,2
55,7
58,0
56,7
55,8
51,3
56,0

61,6
61,7
63,9
62,9
58,1
62,1
52,0
55,5
53,1
49,1
48,6
50,5
55,5
55,9
57,9
62,7
58,3
56,5
50,5
58,3

55,4
59,2
62,4
63,8
60,5
60,5
50,0
55,8
61,9
50,5
52,2
51,4
58,5
56,3
60,5
62,3
61,9
59,0
51,5
60,6

46,3
47,5
51,4
50,0
53,4
55,8
51,1
50,4
52,3
49,6
50,4
50,9
47,4
50,9
52,6
54,7
53,9
55,1
51,5
51,4

52,1
53,3
53,7
53,9
52,9
54,5
52,6
51,7
51,8
53,2
50,0
50,5
50,0
51,4
52,2
51,4
52,2
54,2
53,1
52,8

46,6
52,2
50,0
52,2
51,9
52,7
50,5
47,0
49,5
44,0
51,4
47,1
47,4
45,0
51,4
50,5
48,6
50,5
49,5
48,6

60,5
58,3
61,0
59,1
57,7
60,9
52,0
52,9
53,1
49,1
50,0
46,8
56,5
51,4
54,8
57,3
53,9
55,1
48,5
53,7

55,0
57,0
58,8
60,4
56,2
58,7
49,5
53,8
50,0
50,0
49,1
49,1
53,0
53,2
56,7
59,3
55,5
50,5
47,0
55,6

57,9
59,1
59,3
58,3
54,4
57,8
51,5
55,5
48,7
48,2
48,2
48,1
54,3
56,8
54,9
57,5
56,1
58,1
54,0
55,6

48,8
50,8
49,1
48,7
51,4
50,4
50,0
51,3
52,2
46,9
46,8
45,3
43,6
43,2
53,9
55,0
56,6
57,0
53,0
49,5

55,3
56,7
53,2
58,3
56,8
56,3
50,5
52,2
52,8
54,0
50,4
49,5
55,2
50,9
55,3
55,6
53,1
52,6
47,5
50,9

67,9
67,4
66,8
68,3
61,0
61,1
59,7
63,9
60,7
54,5
60,1
62,6
61,4
68,0
62,5
60,2
65,9
60,8
59,9
62,8

Lager

7 (8)

Order- R-/insatsstock
varupriser

Planerad
produk tion
nrmaste
Import
halvret

61,6

Inkpschefsindex
avseende augusti mnad 2015, fortsttning

Silf / Swedbanks Inkpschefsindex (PMI)


ml och metodik
Historik

Silf (tidigare I&L) och Swedbank AB, publ, (dvarande Sparbanken Sverige) gr den frsta gemensamma interna
berkningen av Inkpschefsindex fr de fem ingende komponenterna i december 1994. Exakt ett r senare offentliggjordes indextalet fr frsta gngen. Frebild fr dvarande
ICI (numera PMI, Purchasing Managers Index) var NAPMindex en av USA:s viktigaste och mest knda konjunkturindikatorer. NAPM-index har funnits sedan 1931 och har
under tiden dpts om till PMI (eller ISM-index).

Deltagare

Omkring 200 inkpschefer i tillverkningsindustrin.

Publicering

Frsta vardagen i varje mnad, kl 08:30.

Underskningsperiod

Jmfrelse med fregende mnad.

Sammansttning
av PMI (%)

Orderingng (i det egna fretaget)


Produktion (i det egna fretaget)
Sysselsttning (i det egna fretaget)
Leverantrernas leveranstider
Lager (inkpt material)

vriga nyckeltal
(ingr ej i PMI)

Orderingng export
Orderingng hemma
Orderstock
Leverantrernas r- och insatsvarupriser
Import
Planerad produktion nrmaste halvret

Ml

Snabb konjunkturindikator
Enkel statistik och ltt tolkning
Statistik med relativt korta publiceringsintervaller
Stndig kontakt med vlinformerad yrkesgrupp

Berkning

Enligt s k diffusionsindex. Positiva frndringar tas fram i procent fr de fem delindexarna. Till detta tal adderas den procentuella andelen ofrndrade svar multiplicerat med 0,5.
Sedan viktas de olika delindexarna enligt ovan fr att komma
fram till totalindex. Inkpschefsindex anger inga aktivitetsniver utan mnadsvisa frndringar av industrikonjunkturen.
De ssongrensade siffrorna redovisas i frsta hand.

Break even

Skiljelinjen mellan upp- och nedgng i industrikonjunkturen


har i linje med amerikansk praxis faststllts till 50. Ngon
verdriven exakt tillmpning av denna grns eller neutral tillvxtzon br dock inte gras. 49,7 eller 50,3 ger inte srskilt
olikartade konjunktursignaler utifrn PMI-totalindex.

30
25
20
15
10

Vid framtagningen och analysen av Inkpschefsindex (ICI/PMI) tror vi oss ha anvnt tillfrlitliga kllor och
bearbetningsrutiner. Swedbank AB (publ) och Silf kan dock inte garantera analysernas riktighet eller
fullstndighet och kan inte ansvara fr eventuell felaktighet eller brist i grundmaterialet eller bearbetningen
drav. Lsarna uppmanas att basera eventuella beslut ven p annat underlag.
Varken Swedbank, Silf eller dess anstllda eller andra medarbetare skall kunna gras ansvariga fr frlust
eller skada, direkt eller indirekt, p grund av eventuella fel eller brister i analyser som redovisas i
Inkpschefsindex.
8 (8)

You might also like