TQ for Heat Treatment Method Change

The document is a technical query submitted by MSET Engineering Corporation regarding a proposed change to the post-forming heat treatment method for the top head of a pressure vessel. The original scope called for normalizing the top head per PTS 12.20.01 after cold forming. The revised scope proposes stress relief instead of normalizing due to concerns about sensitization of the carbon steel and stainless steel cladding material at the normalizing temperature. Stress relief at 610-625°C for 2 hours is suggested to minimize sensitization effects as per the applicable ASME code, while still providing the necessary stress relief, as sensitization could lead to intergranular corrosion if the material is exposed to corrosive environments

Uploaded by

hannan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
422 views2 pages

TQ for Heat Treatment Method Change

The document is a technical query submitted by MSET Engineering Corporation regarding a proposed change to the post-forming heat treatment method for the top head of a pressure vessel. The original scope called for normalizing the top head per PTS 12.20.01 after cold forming. The revised scope proposes stress relief instead of normalizing due to concerns about sensitization of the carbon steel and stainless steel cladding material at the normalizing temperature. Stress relief at 610-625°C for 2 hours is suggested to minimize sensitization effects as per the applicable ASME code, while still providing the necessary stress relief, as sensitization could lead to intergranular corrosion if the material is exposed to corrosive environments

Uploaded by

hannan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

TQ No: MSET/M2-256/V35253/TQ-02

TECHNICAL QUERY
(for clarification/deviation/waiver)

DATE:
CONTRACT / PO/WO NO
CONTRACTOR
DISCIPLINE; P/M/C/S/E/I

29/07/2015
4120104272
MSET ENGINEERING CORPORATION SDN BHD
M

DESCRIBE ALL CLARIFICATION, USE ONE SUBJECT and ONE DISCIPLINE PER QUERY,

ORIGINAL SCOPE

POST FORMING HEAT TREATMENT (NORMALIZING) FOR PRESSURE VESSEL


TOP HEAD AS PER PTS 12.20.01

REVISED SCOPE / NEW SCOPE

PROPOSE TO CHANGE THE METHOD OF POST FORMING HEAT TREATMENT


OF TOP HEAD FROM NORMALIZING TO STRESS RELIEF.

JUSTIFICATION / PURPOSE

BASED ASME SECTION VIII, DIV 1 2013 ED, CLAUSE UCS-79, HEAT
TREATMENT SHALL BE PERFORMED TO ALL PARTS THAT HAVE BEEN COLD
FORMED WITH FIBER ELONGATION GREATER THEN 5% FOR CARBON STEEL
MATERIAL. POST FORMING HEAT TREATMENT (STRESS RELIEF) SHALL BE
PERFORMED AT TEMPERATURE 610C - 625C FOR 2 HOURS HOLDING TIME
(MINIMUM).

(include deviation/waiver)

WHILE IN PTS 12.20.01 CLAUSE 5.2.4.i MENTION THAT HEAT TREATMENT


(NORMLIZING) SHALL BE PERFORMED TO ALL PARTS THAT HAVE BEEN
COLD FORMED WITH FIBER ELONGATION GREATER THEN 5% FOR CARBON
STEEL [Link] SHALL BE PERFORMED AT TEMPERATURE
OF 910C WITH 10 MINUTES HOLDING TIME.
SINCE THE MATERIAL OF TOP HEAD IS CARBON STEEL CLADDING (SA 516
GR 60N +3.5MM SS316L), WITH EXPOSING TO TEMPERATURE ABOVE 425 C 870 C FOR SUFFICIENT TIME WILL LEADS TO FORMATION OF CHROMIUM
CARBIDE AT AUSTENITE GRAIN BOUNDRIES WHICH CALLS SENSITIZATION
EFFECT. INTER-GRANULAR CORROSION WILL OCCURS WHEN A SENSITIZED
MATERIAL IS EXPOSED TO SUFFICIENTLY STRONG CORROSIVE MEDIUM
FOR A LONG ENOUGH TIME.
INORDER TO MINIMIZE THE EFFECT OF SENSITIZATION, MSET PROPOSE TO
MAKE A DEVIATION ON THE REQUIREMENT OF POST FORMING HEAT
TREATMENT FROM NORMALIZING TO STRESS RELIEF.
ATTACHMENT

NOT APPLICABLE

REFERENCE

MSET/M2-256/V-35253/01 (GENERAL ARRANGEMENT DWG FOR SUPHUR COALESCER (V-35253))


MSET/M2-256/V-35253/DC/REV D (DEISGN CALCULATION)

Issued By:

THIS PROPOSAL IS REQUIRED IN ORDER MINIMIZE THE EFFECT OF


SENSITIZATION.

Contractor project Manager /Authorize


representative

PP(M)SB/MRC Respond (reject/revise/resubmit etc.):

NOTE:

Upon receive the respond of the clarification/queries as above, if Contractor/Vendor/Consultant consider this is an additional
work to the contract with schedule or cost impact, Contractor/Vendor/Consultant shall formalize the Change impact and/or schedule
through the Variation Order Procedure prior proceeding with the stated work. Failure to formalize it in accordance to procedure may
void of Contractor/Vendor right.

Prepared By:

Name:
Position:
Date:

NURU HIDAYAH
MOHAMAD RAWI
DESIGN
ENGINEER
29/07/15

Reviewed By:

Name:
Position
Date:

MOHAMAD AZAHAR
BIN AHMAD
ENGINEERING
MANAGER
29/07/15

* refer to whoever applicable, PTS deviation shall seek BTA/TP signature..

Reviewed By:

Approved By:

Name:
Position

Name:
Position :

Date:

Date:

*TP/SME