1 OF 2
LARSEN & TOUBRO LIMITED
CONSTRUCTION GROUP
ELECTRICAL DIVISION, H.Q., CHENNAI
PROJECT
Relocation of Riyam Substation and Transformer
Repair Workshop
TITLE
EARTHING CALCULATIONS
REF. NO.
PAGE :
PREPARED
CHECKED
APPROVED
DATE
SSJ
AKR
AKS
22-Feb-16
INPUT DATA
1
2
3
4
5
6
7
8
9
10
Soil resistivity
Type of conductor used
Length of Grid buried in ground
Depth of burial of electrode
Length of Rod or Pipe
Dia of Rod or Pipe
No. of Electrodes
Distance between adjacent rods
P(Ref: Table 5 BS 7430:1991)
Q(Ref: Table 5 BS 7430:1991)
=
=
=
=
=
=
=
=
=
=
L
w
l
d
n
s
26
Copper Flat
275
0.5
3.5
0.016
14
7
2
-1.3
Ohm.m
m
m
m
m
m
CALCULATIONS
Resistance of one vertical Electrode
Net resistance of Electrodes
Re
8l
------------ LOGe -------2*phi*l
d
7.650
ohms
Rr/n
0.546443675 ohms
Resistance of horizontal Buried
Earth grid
Rh
=
=
Net Resistance
=
=
2*L2
------------ x LOGe ---------- -----+ Q2
P x Phi x L
w *d
0.278
ohms
R x Rh
------------R + Rh
0.184
ohms
RESULT
Since the total Resistance is less than 1 ohm, earthing for this area is SAFE.
305260211.xls.xls
- 1
2 OF 2
LARSEN & TOUBRO LIMITED
CONSTRUCTION GROUP
ELECTRICAL DIVISION, H.Q., CHENNAI
PROJECT
Relocation of Riyam Substation and Transformer
Repair Workshop
TITLE
EARTHING CALCULATIONS
REF. NO.
PAGE :
PREPARED
CHECKED
APPROVED
DATE
SSJ
AKR
AKS
22-Feb-16
305260211.xls.xls