Execution Plan
Engineering Design Process Map
INPUTS
PROCESS
SUBPROCESSES
Sub-SubProcess
SUPPORT FUNCTIONS:
HUMAN RESOURCES, INFORMATION TECHNOLOGY,
LEGAL, FINANCIAL, PROJECT CONTROLS &
ESTIMATING (PCE), HEALTH, SAFETY & ENVIRONMENT
(HSE), QUALITY ASSURANCE (QA),
Contract Requirements & Project
Execution Plans
Statutory Requirements
Regulatory Requirements
Industry Codes & Standards
Engineering Plan
Project Procurement Plan
OUTPUTS
ENGINEERING & DESIGN
DEVELOP ENGINEERING PLAN (Started at Tender /Start Up Stages)
Establish Design Basis / Design Input
Develop /Review Cost-Time-Resource (CTR) Plans
Develop List of Technical Deliverables
Specifications (including list of applicable standard specs)
Drawings
Calculations
Technical Reports
Identify Design Verification Requirements (Verification Plan & Approvals Matrix)
Identify & Schedule Design Review Stages
Identify Interface Requirements
DESIGN EXECUTION
Conduct Studies & Technical Analyses
Design & Drafting
Manage Interfaces
Manage Regulatory & Statutory Requirements
Develop Technical Specifications & Input for Procurement / RFQs
QA & HSE Review and Input
Issue "Approved for Bid"
Develop Requisitions
Establish Equipment Criticality Ratings
Approve Purchase Orders (see Materials Management)
PERIODIC STATUS REPORTING
Engineering Plan
CTR's to Planning & Cost Control
Drawings, Specifications, Technical
Reports, Calculations, Data Sheets
Documents for Procurement
status for input into Project schedule,
cost analysis, MDR- Master Document
Register
TECHNICAL AUDITS
Change Requests
DESIGN CHANGE CONTROL
Design Revisions and Engineering Change Notices
Customer Requested Changes
Field Requested Changes
Integrity Management (may require re-HAZOP of changed area)
Decision Register
Engineering Plan
CONDUCT DESIGN REVIEWS
HAZOPS, HAZIDS, VIP- Value Improvement Practices
Design Verification Requirements as
Identified in
Engineering Plan or General
Engineering Procedures
and Check Lists
Design Verification and Design
Reviews Comments and
Actions for Design
Improvements
DESIGN VERIFICATION: verify outputs against inputs
Checking & Approvals of Deliverables
Internal Checking (self check, discipline check, inter-discipline checks)
Project Team Approvals (Lead Engineer & Project Manager)
Client Review / Approval
Third Party Verification (if required- may be internal resources outside the project)
P.E. Approvals
Regulatory and Statutory Comments / Approvals
Other Technical Assurance / Verification Activities as Required:
Alternative Calculations
PEER Review
Integrity Verification
Model Testing
Technical Assurance Audits
DESIGN FINALIZATION
Close Out Action Items from Design Reviews
Close Out Client Comments
Close Out Regulatory & Statutory Comments
Vendor & Subcontractor Document Approvals
Final Approvals
Revised Documents
Action Items &
Meeting Minutes
Comments and Actions for Design
Improvements
Verification Records
Drawings, Specifications,
Technical Reports, Calculations,
Data Sheets
Approved Documents
AFC Documents
Approved Documents
AFC DOCUMENTS: Issue Documents Approved For Construction "AFC"
Tech Support
Construction / Installation Needs
Contract Requirements
Project Execution Plans
PROVIDE TECHNICAL SUPPORT to Construction / Installation as Required
Develop Mobilization / Sail Away/ Installation Procedures
Develop Hook-Up Pre-Com, Commissioning, Test & Start -Up Procedures
& Engineering Plan
Performance Data
DESIGN VALIDATION
Validate results of construction, installation, HUC meet design requirements
Test/ Performance Results and Installation Surveys
ENGINEERING & DESIGN PHASE "LESSONS LEARNED" REVIEW
Construction Procedures
Installation Plans
Hook-Up Pre-Com, Commissioning, Test
& Start -Up Procedures
Design Validated
Continual Improvement
Opportunities Identified
"Know How" Captured