PRICE COMPARISON
NAMA PEKERJAAN
ELECTICAL MM 72
LOKASI
BATAM
KATEGORI
NEW PROJECT/ EXPANSION / MAINTENANCE
TARGET PENYELESAIAN PEKERJAAN
STATUS
NOT YET STARTED/ ON GOING/ COMPLETED
Date
ELECTRICAl MM 72
PADA LOKASI BATAM SITE B - PT. MUSIM MAS
No
KATEGORI
URAIAN UPAH DAN MATERIAL
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
REFERENSI
Upah
Upah
Upah
Upah
Upah
Upah
Upah
Upah
Upah
Upah
Upah
Upah
Upah
Upah
Upah
Penarikan Cable Power
Cable ukuran
1x400mm2
Cable ukuran
1x240mm2
Cable ukuran
4x120mm2
Cable ukuran
4x50mm2
Cable ukuran
4x35mm2
Cable ukuran
4x25mm2
Cable ukuran
4x16mm2
Cable ukuran
4x10mm2
Cable ukuran
4x6mm2
Cable ukuran
4x4mm2
Cable ukuran
4x2.5mm2
Cable ukuran
1x95mm2
Cable ukuran
1x25mm2
Cable ukuran
2 x 2 x 1.3mm2
Cable ukuran
3x1.5mm2
Upah
Upah
Upah
Upah
Upah
Upah
Upah
Upah
Penarikan Cable Instrument-Cable Control
Cable ukuran
3x1.5mm2
Cable ukuran
1x2x1.3mm2
Cable ukuran
16x2x1.3mm2
Cable ukuran
24x2x1.3mm2
Cable ukuran
32x2x1.3mm2
Cable ukuran
25x1.5mm2
Cable ukuran
37x1.5mm2
Cable ukuran
11x1.5mm2
Upah
Upah
Upah
Upah
Upah
Pemasangan Cable Ladder
Ladder ukuran
750 mm
Ladder ukuran
450 mm
Ladder ukuran
300 mm
Ladder ukuran
200 mm
Ladder ukuran
100 mm
UOM
VOL.
HARGA SATUAN (Rp.)
JUMLAH (Rp)
1
2
3
4
5
6
7
8
1
2
3
4
5
20,000.00
10,000.00
15,000.00
13,000.00
10,000.00
12,000.00
12,000.00
5,000.00
6,000.00
3,000.00
3,000.00
10,000.00
6,000.00
3,000.00
3,000.00
1)
2)
3)
1)
1)
3)
3)
2)
3)
1)
1)
3)
3)
3)
1)
137,700,000.00
5,250,000.00
24,750,000.00
4,680,000.00
2,700,000.00
2,040,000.00
6,120,000.00
36,500,000.00
9,600,000.00
1,260,000.00
21,195,000.00
9,600,000.00
1,920,000.00
2,160,000.00
53,265,000.00
318,740,000.00
15,000.00
15,000.00
15,000.00
12,000.00
12,000.00
12,000.00
12,000.00
8,000.00
6,000.00
4,000.00
4,000.00
10,000.00
6,000.00
3,000.00
3,000.00
103,275,000.00
7,875,000.00
24,750,000.00
4,320,000.00
3,240,000.00
2,040,000.00
6,120,000.00
58,400,000.00
9,600,000.00
1,680,000.00
28,260,000.00
9,600,000.00
1,920,000.00
2,160,000.00
53,265,000.00
316,505,000.00
m'
m'
m'
m'
m'
m'
m'
m'
14,010.00
17,600.00
2,640.00
1,080.00
1,440.00
5,040.00
2,520.00
3,720.00
3,000.00
3,000.00
3,000.00
3,000.00
3,000.00
3,000.00
3,000.00
3,000.00
1)
3)
3)
3)
3)
3)
3)
3)
42,030,000.00
52,800,000.00
7,920,000.00
3,240,000.00
4,320,000.00
15,120,000.00
7,560,000.00
11,160,000.00
144,150,000.00
3,000.00
3,000.00
3,000.00
3,000.00
3,000.00
3,000.00
3,000.00
3,000.00
42,030,000.00
52,800,000.00
7,920,000.00
3,240,000.00
4,320,000.00
15,120,000.00
7,560,000.00
11,160,000.00
144,150,000.00
pcs
pcs
pcs
pcs
pcs
144.00
101.00
141.00
103.00
45.00
150,000.00
125,000.00
120,000.00
100,000.00
75,000.00
1)
1)
1)
1)
1)
21,600,000.00
12,625,000.00
16,920,000.00
10,300,000.00
3,375,000.00
64,820,000.00
150,000.00
125,000.00
105,000.00
90,000.00
60,000.00
21,600,000.00
12,625,000.00
14,805,000.00
9,270,000.00
2,700,000.00
61,000,000.00
pcs
pcs
200.00
200.00
20,000.00
20,000.00
1)
1)
4,000,000.00
4,000,000.00
8,000,000.00
25,000.00
25,000.00
5,000,000.00
5,000,000.00
10,000,000.00
pcs
pcs
245.00
5.00
100,000.00
100,000.00
2)
2)
24,500,000.00
500,000.00
25,000,000.00
100,000.00
100,000.00
24,500,000.00
500,000.00
25,000,000.00
pcs
pcs
pcs
23.00
27.00
8.00
150,000.00
150,000.00
150,000.00
3)
3)
3)
3,450,000.00
4,050,000.00
1,200,000.00
8,700,000.00
150,000.00
150,000.00
150,000.00
3,450,000.00
4,050,000.00
1,200,000.00
8,700,000.00
ls
ls
ls
ls
1.00
1.00
1.00
1.00
15,000,000.00
15,000,000.00
10,000,000.00
10,000,000.00
15,000,000.00
15,000,000.00
10,000,000.00
10,000,000.00
50,000,000.00
15,000,000.00
15,000,000.00
10,000,000.00
10,000,000.00
15,000,000.00
15,000,000.00
10,000,000.00
10,000,000.00
50,000,000.00
619,410,000.00
0.00
619,410,000.00
TOTAL 1
DISCOUNT
TOTAL 2
615,355,000.00
0.00
615,355,000.00
Sub Total
IV
Pemasangan Pipa Conduit
Pipa Conduit 3/4"
Pipa Conduit 1"
1 Upah
2 Upah
Sub Total
V
Pemasangan Lampu
TL 2x36
Floodlight 400 Watt
1 Upah
2 Upah
Sub Total
VI
Pemasangan Junction Box
Junction Box Analog
Junction Box Digital
Junction Power
1 Upah
2 Upah
3 Upah
VII
Pekerjaan Persiapan
Mobilisasi dan Demobilisasi
Transport Tenaga Kerja
Site Management
Alat-alat Kerja dan Alat Keselamatan Kerja
JUMLAH (Rp)
6,885.00
525.00
1,650.00
360.00
270.00
170.00
510.00
7,300.00
1,600.00
420.00
7,065.00
960.00
320.00
720.00
17,755.00
Sub Total
III
HARGA SATUAN (Rp.)
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
Sub Total
II
PT. CIPTA ELEKTRIK KREASINDO
Sub Total
Material :
Alat kerja :
Lama kerja :
Jumlah Pekerja :
Safety :
Izin :
TOTAL 1
DISCOUNT
TOTAL 2
TIDAK ADA PEMBANDING
HARGA SATUAN (Rp.)
JUMLAH (Rp)
TOTAL 1
DISCOUNT
TOTAL 2
CHECKED BY :
VERIFIED BY :
ACKNOWLEDGED BY :
QUANTITY SURVEYOR
HEAD SECTION
HENDRY
0.00
0.00
0.00
NOTES : 1) Pekerjaan Pemasangan Kabel di CCP PT AMR - Madidir 2 - PT ANUGERAH ELEKTRIK - 2015
2) Pekerjaan Pemasangan Kabel di SBE PLANT PT IBP - Lubuk Gaung - PT ANUGERAH ELEKTRIK - 2015
3) Penawaran Pekerjaan Pemasangan Kabel MM72 yang sudah deal namun batal - PT MM Batam - PT. ANUGERAH ELEKTRIK - 2015
Rev.02
PRICE COMPARISON
NAMA PEKERJAAN
LOKASI
KATEGORI
TARGET PENYELESAIAN PEKERJAAN
STATUS
NEW PROJECT/ EXPANSION/ MAINTENANCE
NOT YET STARTED/ ON GOING/ COMPLETED
Date
(KONTRAKTOR)
(NAMA PEKERJAAN DAN NOMOR KONTRAK)
KONTRAK
AKTUAL
BALANCE
(LOKASI DAN NAMA PERUSAHAAN)
NO.
URAIAN
UOM
Material :
Alat kerja :
Lama kerja :
Jumlah Pekerja :
Safety :
VOL.
HARGA SATUAN
(RP.)
TOTAL 1
DISCOUNT
TOTAL 2
SUBTOTAL
VOL.
0.00
0.00
0.00
HARGA SATUAN
(RP.)
TOTAL 1
DISCOUNT
TOTAL 2
SUBTOTAL
VOL.
0.00
0.00
0.00
SUBTOTAL
TOTAL 1
DISCOUNT
TOTAL 2
0.00
0.00
0.00
Izin :
CHECKED BY :
VERIFIED BY :
ACKNOWLEDGED BY :
QUANTITY SURVEYOR
HEAD SECTION
HENDRY
NOTES : 1
2
3
Rev. 02