PROBLEM & RESOLUTION
Problems
Resolution
To flush water at level 2 plumbing riser for 10 min.
To change GI piping to copper.
To upgrade existing filtration system to new fully automatic back wash
media filtration system.
Action
Night shift Main Exe
Bathtub Stopper.
To change bathtub controller software items.
Mustaffa and Ibrahim
Shower head, Flushing System & Tap
To service every 6 month the shower
Mustaffa and Ibrahim
Bathtub
On going for bathtub silicon
Mustaffa,Din & Wahab
Deluxe wing bathroom
Extra light fitting in the bathroom
Razali,Wan and Razak
Noise sound
To check all window gasket.
Mustaffa and Din
Hot water and cold water.
Every shift Maint Exe need to check the heat machine
twice
Maint Executive
Air conditioner
To check all room F.C.U two way valve and thermostat setting.
Hassan & Fadhil
Wear and tear of room and bathroom
Time for refurbishment for superior wing rooms
San Amalan, Kumar L &
Rahman
Inadequate lighting
Extra lighting point on top of writing table
San Amalan, Kumar L &
Rahman
Hotel condition
External wall need to paint and wall crack need to redo
San Amalan, Kumar L &
Rahman
Superior car lift
Need to upgrade the existing lift due to 23 years old.
San Amalan, Kumar L &
Rahman
Water dirty.
San Amalan, Kumar L &
Rahman
Deluxe wing PRE A.H.U
Need to fix damper control at uncompleted floor to improve the
completed rooms air flow.
San Amalan, Kumar L &
Rahman
Swimming pool
Rectify work for piping pressure test was done and found out the
underground water piping leaking, wastage of water approximate
RM4,000.00 per month. CAPEX raised and sent to FHH a year ago. Still San Amalan, Kumar L &
no reply.
Rahman