Daftar Kuantitas Dan Harga

This document is a list of quantities and prices for the construction of mosque facilities in Kuala Beukah / Paya Lipoh village, Aceh Timur. It includes 7 sections: (1) Preparation work such as site clearing and measurement. (2) Relief works including molding. (3) Installation of GRC massive list plank walls. (4) Stainless steel fencing and gates. (5) Roof works including framing and roofing. (6) Interior wall tiling. (7) Construction of the gate including foundations, columns, beams, and walls. It provides details of materials, volumes, units, and unit prices to calculate the total price for each item and

Uploaded by

Ari Mulya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
53 views2 pages

Daftar Kuantitas Dan Harga

This document is a list of quantities and prices for the construction of mosque facilities in Kuala Beukah / Paya Lipoh village, Aceh Timur. It includes 7 sections: (1) Preparation work such as site clearing and measurement. (2) Relief works including molding. (3) Installation of GRC massive list plank walls. (4) Stainless steel fencing and gates. (5) Roof works including framing and roofing. (6) Interior wall tiling. (7) Construction of the gate including foundations, columns, beams, and walls. It provides details of materials, volumes, units, and unit prices to calculate the total price for each item and

Uploaded by

Ari Mulya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

DAFTAR KUANTITAS DAN HARGA

Kegiatan
Kabupaten
Tahun Anggaran
No.
1
I
1
2
3
II
1
2
3

: Pembangunan Sarana dan Prasarana Masjid Desa Kuala Beukah / Paya Lipoh
Kec. Peureulak Kota Kab. Aceh Timur (OA)
: Aceh Timur
: 2016
URAIAN PEKERJAAN

VOL.

SAT.

ANALISA

HARGA SATUAN

JUMLAH HARGA

1,000
1,000
1,000

Ls
Ls
Ls

Taksir
Taksir
Taksir

Rp.
Rp.
Rp.

85,680
92,070

m'
m'

Taksir
Taksir

Rp.
Rp.

4,000
14,000
13,000
9,000

Bh
Bh
Bh
Bh

Taksir
Taksir
Taksir
Taksir

Rp.
Rp.
Rp.
Rp.

320.000,00
250.000,00
160.000,00
70.000,00
SUB TOTAL II

PEKERJAAN PERSIAPAN
Pembersihan Lapangan
Pengukuran Lapangan
Papan Nama Kegiatan

Rp.
Rp.
Rp.
Rp.

500.000,00
350.000,00
250.000,00
1.100.000,00

75.000,00 Rp.
110.000,00 Rp.

6.426.000,00
10.127.700,00

Rp.
Rp.
Rp.
Rp.
Rp.

1.280.000,00
3.500.000,00
2.080.000,00
630.000,00
24.043.700,00

500.000,00
350.000,00
250.000,00
SUB TOTAL I

PEKERJAAN RELIEF
Relief Sudut Balok Listplank (Bawah)
Relief Sudut Dinding Listplank (Atas)
Relief Kolom Listplank + Kubah Beton dan Dudukan
a.Kolom 2,3 m
b.Kolom 1,5 m
c. Kolom 0,5 m
Kubah Beton Sebelah Timur

III
1

PEKERJAAN GRC MASSIVE LIST PLANK


Pemasangan GRC Massive + Pengecatan

127,808

m2

Taksir

Rp.

IV
1
2

PEKERJAAN PAGAR STAINLESS STEEL


Pagar Stainless Steel
Pintu Pagar Stainless Steel

860.000,00 Rp.
SUB TOTAL III Rp.

109.914.880,00
109.914.880,00

49,000
1,000

m2
Bh

Taksir
Taksir

Rp.
Rp.

V
1
2

41.650.000,00
6.000.000,00
47.650.000,00

250,000

m2

Taksir

Rp.

9.000,00 Rp.

2.250.000,00

3
4
5

PEKERJAAN ATAP
Pembongkaran Atap Lama
Pemasangan Rangka Kuda Kuda Expose
- Kuda Kuda Tipe 1
- Kuda Kuda Tipe 2
- Kuda Kuda Tipe 3
Pemasangan Gording
Penutup Atap Seng BJLS
Rabung Seng BJLS

850.000,00 Rp.
6.000.000,00 Rp.
SUB TOTAL IV Rp.

1,948
3,032
0,898
1,499
250,000
56,000

m3
m3
m3
m3
m2
m

A.4.6.1.14.
A.4.6.1.14.
A.4.6.1.14.
A.4.6.1.15.
A.4.5.2.38.
A.4.5.2.39.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

VI
1

PEKERJAAN DINDING DALAM MASJID


Pemasangan Keramik Dinding 20 x 20 cm

6.085.839,00
6.085.839,00
6.085.839,00
5.815.485,00
63.992,20
38.957,40
SUB TOTAL V

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

11.854.630,13
18.454.211,32
5.462.259,59
8.717.412,02
15.998.050,00
2.181.614,40
64.918.177,46

99,580

m2

A.4.4.3.54.

Rp.

VII
1
2
3
4

PEKERJAAN GAPURA
Pondasi Batu Kosong (Anstamping)
Urugan Pasir Bawah Pondasi
Galian Tanah Pondasi
Urugan Kembali 1/3 Galian

230.857,19 Rp.
SUB TOTAL VI Rp.

22.988.758,48
22.988.758,48

0,256
0,128
4,000
1,333

m3
m3
m3
m3

A.3.2.1.9.
A.2.3.1.11.
A.2.3.1.2.
A.2.3.1.9.

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

156.522,24
22.439,68
338.580,00
66.066,67

Pondasi Tapak
- Beton K225
- Pembesian
- Bekisting

1,800
1,800
29,509
4,800

m3
m3
Kg
m2

A.4.1.1.7.
A.4.1.1.17.
A.4.1.1.20.

Rp.
Rp.
Rp.

1.029.151,27 Rp.
165.536,50 Rp.
173.795,00 Rp.

1.852.472,29
4.884.840,15
834.216,00

Kolom Pedestal Tapak


- Beton K225
- Pembesian
- Bekisting

0,275
0,275
4,158
2,200

m3
m3
Kg
m2

A.4.1.1.7.
A.4.1.1.17.
A.4.1.1.22.

Rp.
Rp.
Rp.

1.029.151,27 Rp.
165.536,50 Rp.
304.430,50 Rp.

283.016,60
688.369,60
669.747,10

Kolom 50/50
- Beton K225
- Pembesian
- Bekisting

1,625
1,625
22,409
13,000

m3
m3
Kg
m2

A.4.1.1.7.
A.4.1.1.17.
A.4.1.1.22.

Rp.
Rp.
Rp.

1.029.151,27 Rp.
165.536,50 Rp.
304.430,50 Rp.

1.672.370,82
3.709.431,61
3.957.596,50

Balok 13/18
- Beton K225
- Pembesian
- Bekisting

0,132
0,132
2,662
2,034

m3
m3
Kg
m2

A.4.1.1.7.
A.4.1.1.17.
A.4.1.1.23.

Rp.
Rp.
Rp.

1.029.151,27 Rp.
165.536,50 Rp.
311.293,90 Rp.

136.064,09
440.615,32
633.171,79

Dinding Beton Bertulang (t = 13 cm)


- Beton K225
- Pembesian

0,627
0,627
3,566

m3
m3
Kg

A.4.1.1.7.
A.4.1.1.17.

Rp.
Rp.

1.029.151,27 Rp.
165.536,50 Rp.

644.866,19
590.276,01

611.415,00
175.310,00
84.645,00
49.550,00

No.
1

URAIAN PEKERJAAN
-PEKERJAAN
Bekisting PERSIAPAN

VOL.

SAT.

ANALISA

HARGA SATUAN

JUMLAH HARGA

3
9,640

4
m2

5
A.4.1.1.25.

Rp.

6
304.831,50 Rp.

7
2.938.575,66

0,990
0,990
8,545
10,890

m3
m3
Kg
m2

A.4.1.1.7.
A.4.1.1.17.
A.4.1.1.24.

Rp.
Rp.
Rp.

1.029.151,27 Rp.
165.536,50 Rp.
343.790,50 Rp.

1.018.859,76
1.414.458,08
3.743.878,55

A.4.1.1.7.
A.4.1.1.17.
A.4.1.1.24.

Rp.
Rp.
Rp.

1.029.151,27 Rp.
165.536,50 Rp.
343.790,50 Rp.

231.559,04
321.467,74
850.881,49

10

Plat Atas Dinding (t = 10 cm)


- Beton K225
- Pembesian
- Bekisting

11

Plat Dudukan Kubah (t = 10 cm)


- Beton K225
- Pembesian
- Bekisting

0,225
0,225
1,942
2,475

m3
m3
Kg
m2

12
13

Kubah
Relief & Aksesoris

2,000
1,000

Bh
Bh

Taksir
Taksir

Rp.
Rp.

VIII
1
2
3

PEKERJAAN PENGECATAN
Pengecatan Kolom Listplank + Kubah Beton dan Dudukan
Pengecatan Gapura
Pengecatan Tembok Pagar

3.000.000,00 Rp.
10.000.000,00 Rp.
SUB TOTAL VII Rp.

6.000.000,00
10.000.000,00
48.100.342,96

42,580
78,838
111,040

m2
m2
m2

A.4.7.1.10.
A.4.7.1.10.
A.4.7.1.10.

Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1.154.727,02
2.138.007,72
3.011.293,76
6.304.028,50
1.100.000,00
323.919.887,40
325.019.887,40

27.119,00
27.119,00
27.119,00
SUB TOTAL VIII
SUB TOTAL I
SUB TOTAL II - III - IV - V - VI - VII - VIII
JUMLAH TOTAL