Gagan Aviva Construction Progress Update

The document provides a construction update for residential projects in Sector 33, Gurgaon. It discusses progress made on the basement, clubhouse construction, and boundary walls. Tower B is reported to have reached the 10th floor, Tower C the 9th floor. New launch projects are also advertised in Sector 71 Gurgaon and Sector 117 Noida.

Uploaded by

bakshipreeti
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views2 pages

Gagan Aviva Construction Progress Update

The document provides a construction update for residential projects in Sector 33, Gurgaon. It discusses progress made on the basement, clubhouse construction, and boundary walls. Tower B is reported to have reached the 10th floor, Tower C the 9th floor. New launch projects are also advertised in Sector 71 Gurgaon and Sector 117 Noida.

Uploaded by

bakshipreeti
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

The Residences Update August, 2010

Dear Customer,

Greetings!
We would like to bring you up-to-date
with what’s happening in and around
your privileged Unitech property.

CONSTRUCTION UPDATE

Disclaimer: The above photographs have been taken in August 2010. Actual status of this project as on date may be at variance from these photographs.
BASEMENT CLUB BOUNDARY WALL
• Lower and upper floor level • Construction of club has • Construction of boundary wall
basement slab work is in commenced work is in progress
progress

STRUCTURE STRUCTURE STRUCTURE


• Modern construction machinery • Construction of B block has • Construction of C block has
is being used at site reached upto 10th floor level reached upto 9th floor level

UPDATES WILL BE AVAILABLE ONLINE AT: [Link]/[Link]


SECTOR - 33, GURGAON

RESIDENCES CONSTRUCTION MILESTONE TABLE


S. TOWER
PARTICULARS
No. Tower B1 Tower B2 Tower B3 Tower B4 Tower C1 Tower C2 Tower C3 Tower G1 Tower G2 Tower G3 Tower F1 Tower F2 Tower F3 Tower E1 Tower E2 Tower E3 Tower H1 Tower H2 Tower D1 Tower D2 Tower A1 Tower A2 Tower A3 Tower A4
STRUCTURAL COMPLETION 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
1 Completion of foundation C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C W W W W C C C C C C C C C C C C C C C C C C C C C C C C W W W W W W W W W W W W W W W W C C C C C C C C C C C C C C C C
2 Completion of ground floor roof C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
3 Completion of first floor roof C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
4 Completion of typical floor roof 10th 10th 10th 10th 10th 10th 10th 10th 10th 10th 10th 9th 9th 9th 9th 9th 9th 9th 9th 9th 9th 9th 9th 9th 8th 8th 8th 8th 6th 6th 6th 6th G G G G 7th 7th 7th 7th 4th 4th 4th 4th 1st 1st 1st 1st G G 6th 6th 6th 6th 8th 8th 8th 8th 4th 4th 4th 4th 5th 5th 5th 5th 7th 7th 7th 7th 8th 8th 8th 8th

5 Completion of masonry work within flat 8th 8th 8th 8th 9th 9th 9th 9th 9th 9th 9th 9th 8th 8th 8th 8th 1st 1st 1st 1st 2nd 2nd 2nd 2nd 1st 1st 1st 1st G G 1st 1st 1st 1st 3rd 3rd 3rd 3rd 3rd 3rd 3rd 3rd 5th 5th 5th 5th

6 Completion of internal plaster within flat 6th 6th 6th 6th 6th 6th 6th 6th 5th 5th 5th 5th 4th 4th 4th 4th

7 Completion of plumbing work within flat 3rd 3rd 3rd 3rd


Completion of electrical work within flat
8 7th 7th 6th 7th 1st 1st 1st 1st 1st 1st 1st 1st 1st 1st 1st 1st 2nd 2nd 2nd 2nd 3rd 3rd 3rd 3rd
(Concealed Conduits)

FOR MORE DETAILS ON THIS PROJECT, PLEASE CALL: 0124 - 4552103 C: Complete, W: Work in progress

NEW LAUNCHES

NIRVANA COUNTRY 2
SECTOR - 71, GURGAON NIRVANA COUNTRY 2
SECTOR - 71, GURGAON
• 3 BR apts & duplex penthouses
• Sizes from 2250-2475 sq. ft. • 3 to 5 Bedroom villas
• Theme garden & landscaped greens • Floor areas of 1523 - 5252 [Link].
• Putting green & kid’s play area • Neighbourhood shopping centres
• Exclusive club house • Landscaped surroundings
• Close to world class schools & hospitals • Exclusive club house
• Well connected to NH-8 & Golf course • Metro connectivity
extension road

SECTOR - 70, GURGAON NOIDA

• 3 bedroom apartments • Located on Phase-2, Sector 117, Noida


• Sizes from 1530-1560 [Link]. • Part of 70 acres township
• Extensive landscaped greens • 1, 2 & 3 bedroom apartments
• Club house • Sizes from 460 - 990 sq. ft.
• Swimming pool • Gated community
• 24X7 Power back-up • Power backup for utilities
• Gymnasium & swimming pool
• Sewage treatment plant
• Open kid’s play area

UNIWORLD CITY, MOHALI

• 3 bedroom independent floors


SECTOR - 117, NOIDA
• Floor area of 1796 sq. ft.
• Part of 300 acres township • Located near the FNG expressway
• Clubhouse and amenities • 1, 2 & 3 bedroom apartments
• Landscaped greens • Sizes from 747 - 1408 [Link].
• Swimming pool • Landscaped surroundings
• Swimming pool
• Exclusive club house
• Kid’s play area

For information on new launches,


E-mail: sales@[Link] Call: Gurgaon 0124 - 4552000, Noida 0120 - 3985100, Mohali 0172 - 4686200
[Link]

Group Companies:

You might also like