APPROVED CHECKED PREPARED
OPERATIONAL CONTROL GUIDE MS. L. SASAKI MR. R. ULATAN
EQUIPT. DESC. INJECTION MOLDING MACHINE
SECTION PRODUCTION ILLUSTRATION/PICTURE :
PERSONAL PROTECTIVE
PROCESS EQUIPMENT OPERATIONAL CONTROL DETAILS EQUIPT (PPE) / other necessary
materials 1
1. Materials / Process - Injection Molding Machine (see illustration 1).
Preparation a. Prepare necessary materials.
2. Molding a. Switch on and set-up the machine.
b. Ensure proper wearing of appropriate PPE's (see illustration 2). gloves, and other PPE's as necessary
c. No matches/lighters & cellphones are brought inside the working area
to avoid fire and/or other posible accidents.
d. Ensure that the materials to be used does not contain any hazardous Cert. of Non-Use, ICP Data, MSDS
substances. Environmental Passed stamp
1. Check the "Environmental Passed" stamp, signifying that it
has been checked and does not contain any hazardous
chemical substance.
2. Check the material lot no. and/or equivalent reference no.
to verify the materials to be used does not contain any
hazardous substance.
parameter
3. Be careful in passing through under the robotic machine and
near shooter stand to avoid accident.
e. Ensure that there will be no oil (and other chemical) spillage when
operating the machine. In case of spillage, immediately take action.
Use saw dust / rug to contain the spill to avoid accident and
contamination.
f. Dispose the contaminated rug/saw dust properly. Observe proper
waste segregation (refer to Waste Segregation Guidelines).
g. Keep proper distance from the robot part of the machine and shooter
to avoid accident.
robotic part of the proper weaing of 2
machine appropriate PPE's
REVISION DETAILS:
CONTROL NO : REMINDERS / SPECIAL INSTRUCTIONS :
REV
MARK DESCRIPTION ISSUED BY : APPROVED BY : DATE : OCG-007
0 Initial issue. MR. R. ULATAN MS. L. SASAKI 06/13/10 DCC STAMP:
ZPI-AD.Form-035.R0
APPROVED CHECKED PREPARED
OPERATIONAL CONTROL GUIDE Y. IIMURA EMMA
EQUIPT. DESC. INJECTION MOLDING MACHINE
SECTION INJECTION SECTION SECTION ILLUSTRATION/PICTURE :
PERSONAL PROTECTIVE
PROCESS EQUIPMENT OPERATIONAL CONTROL DETAILS EQUIPT (PPE) / other necessary
materials
REVISION DETAILS:
CONTROL NO : REMINDERS / SPECIAL INSTRUCTIONS :
REV
MARK DESCRIPTION ISSUED BY : APPROVED BY : DATE : OCG-00
0 Initial issue. EMMA Y. IIMURA 2/28/04 DCC STAMP:
ZPI Philippines, Inc. Form-386.R0