Preparing A Project Timeline

The seven-step process for preparing a project timeline involves: 1. Identifying schedule activities from the work breakdown structure 2. Developing a network diagram of activities 3. Estimating preliminary activity durations 4. Calculating specific calendar dates and times for activities 5. Identifying resources, accommodating limitations, and estimating final durations 6. Identifying and accommodating any external constraints 7. Comparing the estimated end date to the required end date
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views2 pages

Preparing A Project Timeline

The seven-step process for preparing a project timeline involves: 1. Identifying schedule activities from the work breakdown structure 2. Developing a network diagram of activities 3. Estimating preliminary activity durations 4. Calculating specific calendar dates and times for activities 5. Identifying resources, accommodating limitations, and estimating final durations 6. Identifying and accommodating any external constraints 7. Comparing the estimated end date to the required end date
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Preparing a Project Timeline: A Seven-Step Process Step 1. Prepare for Scheduling by Identifying Schedule Activities on the WBS.

Step 2. Develop the Network Diagram. Step 3. Estimate Preliminary Activity Durations. Step 4. Calculate Specific Calendar Dates and Times. Step 5. Identify Resources, Accommodate Resource Limitations, and Estimate Final Durations. Step 6. Identify and Accommodate Any External Constraints. Step 7. Compare the Estimated End Date and the Required End Date.

2.1)

Schedule Work plan Develop Initial Idea - Research on relevant topic from library - Research on relevant topic from the Internet

Data 10 Aug 2009

24 Aug 2009

Research on Sensors Research on PIC controller and controlling systems Project Proposal - Introduction - Cost and Schedule - Design - Verification Finalize proposal - Design review Sign-up - Acquire Parts Circuit Design - Finalize design review - By the components Testing on sensors(light, temperature, humidity)

7 Sep 2009

21 Sep 2009

5 Oct 2009

19 Oct 2009

Page 1 of 2

26 Oct 2009

PIC microcontroller programming - Input from user keypad and sensors - Output to LCD user interface, light control and temperature and humidity control systems - accounting for outside illumination - user type the setting value
Hardware assembly and installation Reserved for device troubleshooting Make-up demo Make-up presentation Thanksgiving break

2 Nov 2009 16 Nov 2009 23Nov 2009 30 Nov 2009 7 Dec 2009 14 Dec 2009

Finalize demo and presentation Final paper - Introduction/conclusion - Cost and Schedule - Design - Verification
Finalize final paper and check-out

21 Dec 2009

31 Jan 2009

Page 2 of 2