Roll No
79
Dimensions (in cms) of Item
Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6
80.040
79.980
80.010
79.970
80.040
80.030
79.980
79.980
80.020
79.990
80.020
80.010
79.990
79.980
80.020
80.010
80.010
79.970
80.000
80.030
79.980
79.950
80.000
79.980
80.010
80.010
80.040
79.970
80.000
79.990
Mean
80.004
79.996
80.014
79.978
80.014
79.996
Range
0.060
0.050
0.060
0.060
0.040
0.060
X-Bar Chart Control Limits
CL
80.000
A2
0.577
UCL
80.037
LCL
79.964
Sample Size (n)
Comment: As is evident from the X-Bar chart all the
plotted points are between LCL and UCL.
Therefore the chart is under SQC.
mensions (in cms) of Items
Sample 7 Sample 8 Sample 9 Sample 10 Sample 11 Sample 12
80.000
80.000
79.990
79.960
79.930
80.050
80.020
80.010
80.020
79.950
79.980
80.050
79.980
79.990
80.030
80.020
79.990
79.970
80.010
79.990
80.010
80.030
80.040
80.020
80.010
79.950
79.970
80.010
80.040
79.990
80.004
79.988
80.004
79.994
79.996
80.016
80.000
0.040
0.060
0.060
0.080
0.110
0.080
0.063
R-Bar Chart Control Limits
CL
0.063
D4
2.115
UCL
0.13395
LCL
Comment:
Sample Size (n)
D3
As is evident from the R-Bar chart all the
plotted points are between LCL and UCL.
Therefore the chart is under SQC.
79
Roll No
Sample Size (n)
279
No. of times samples taken (k)
Total Samples Checked
Total Defective
Fraction Defective (p-bar)
24
6696
288
0.043
P-Bar Chart Control Limit
CL
0.0430
UCL
0.0794
LCL
0.0066
Comments: As is evident from the p-bar chart that on the 10th, 11th
and 21st day the points fall beyond UCL. Therefore the pbar chart is not under SQC. We will stop the process to
determine any cause that has resulted in such large scale
deviation so as to remove the cause and bring the process
back under SQC.
Production Days
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Total Defective
[Link] Defectives
10
5
10
12
11
9
19
4
12
27
25
9
12
15
8
14
10
4
11
11
26
3
10
11
288
79
Roll No
Sample Size (n)
279
No. of times samples taken (k)
Total Samples Checked
Total Defective
Fraction Defective (p-bar)
24
6696
288
0.043
nP-Bar Chart Control Limit
CL
12.000
UCL
22.166
LCL
1.834
Comments: As is evident from the np-bar chart that on the 10th, 11th
and 21st day the points fall beyond UCL. Therefore the pbar chart is not under SQC. We will stop the process to
determine any cause that has resulted in such large scale
deviation so as to remove the cause and bring the process
back under SQC.
Production Days
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Total Defective
[Link] Defectives
10
5
10
12
11
9
19
4
12
27
25
9
12
15
8
14
10
4
11
11
26
3
10
11
288
Roll No
79
Sample Size (n)
1
25
83
[Link] times Sample Taken (k)
Average Defects (c-Bar)
c-Bar Chart Control Limit
CL
83.000
UCL
110.331
LCL
55.669
Comment:
As is evident from the c-Bar chart all the
plotted points are between LCL and UCL.
Therefore the chart is under SQC.
15
16
17
18
19
20
21
22
23
24
25
Total Defects
79
Tube No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Total Defects
Defects
81
80
81
85
87
81
83
88
82
83
84
82
82
86
83
84
81
83
82
86
81
83
84
82
81
2075