Holiday Detection Inspection Report

The coating-holiday detection inspection report summarizes testing of underground piping at the Dung Quat Refinery project in Vietnam. It lists the drawing number, unit or area, overall inspection results, line number, surface cleanliness, applied voltage, number of holidays detected, whether the instrument was calibrated, results of the final visual inspection, and remarks. The report requires signatures from the completing company, subcontractor, contractor, and client to verify the testing was performed and results reviewed.

Uploaded by

minhnn
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
8K views1 page

Holiday Detection Inspection Report

The coating-holiday detection inspection report summarizes testing of underground piping at the Dung Quat Refinery project in Vietnam. It lists the drawing number, unit or area, overall inspection results, line number, surface cleanliness, applied voltage, number of holidays detected, whether the instrument was calibrated, results of the final visual inspection, and remarks. The report requires signatures from the completing company, subcontractor, contractor, and client to verify the testing was performed and results reviewed.

Uploaded by

minhnn
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
  • Coating Inspection Report Form: This form is used for reporting the results of holiday detection in coating for underground piping, detailing project, client, and inspection specifics.

PROJECT QUALITY CONTROL FORM QCF321 CLIENT PROJ. NO.

: : :

DUNG QUAT REFINERY (DQR) PROJECT VIETNAM OIL AND GAS CORPORATION (PETROVIETNAM) 8474L

COATING - HOLIDAY DETECTION INSPECTION REPORT FOR UNDERGROUND PIPING


Drawing No Unit / Area Overall Inspection Result :

Line No

Surface Cleanliness

Applied Voltage

Number of Holidays detected

Calibrated Instrument ( Yes / No)

Final Visual Inspection

Remarks

COMPLETED BY COMPANY SIGNATURE NAME DATE

SUBCONTRACTOR

CONTRACTOR

CLIENT