HYDROMATRIX
[Link]
HYDROMATRIX An innovative way to hydropower generation
Conventional
6+ m
HYDROMATRIX
1.3+ m
An array (Matrix) of small turbines instead of conventional sized turbines Best suited for low head sites with existing dam and weir structures Most economical in larger numbers -> not a typical small hydro application
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Application criteria
Available plant discharge from ~ 60 m/s Available head from 2 m up to 25 m Minimum submergence 1.5 m below tailwater Unit output from 100 kW up to ~ 1500 kW Grid connection in close vicinity Structure available & suitable for HYDROMATRIX
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Advantages
Use of existing weir structures No major civil construction > less cost Little excavation & no coffer dams > less geological risk No additional land usage -> environmentally friendly Existing river flow pattern can be maintained HYDROMATRIX Modules removeable at flood conditions Standardized modular concept
Compressed project schedule
High availability & easy maintenance
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Application Range
Head 2 - 20 m
HWL
Submergence > 1.5 m
TWL
Plant Flow > 60 m/s
Unit flow 5-12 m3/s Unit Output 100 kW up to 1500 kW
Sill level
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Projects Locations
Nussdorf Freudenau Agonitz Lower St. Anthony Falls Colebrook Chievo Ashta I&II
Jebel Aulia
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Operating Range
ANDRITZ HYDRO 2012
[Link]
StrafloMatrix Operating Range
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Energy Production
HYDROMATRIX 9 units
HYDROMATRIX 3 units
Typical Compact Hydro - solution
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Design Features
Unregulated propeller turbine (CuAlNiFe or CrNi 13.4) Directly driven synchronous (Permanent Magnet Technology) or asynchronous generator Welded hydraulic steel structure
Mechanical face seal
Roller type bearings, oil sump lubrication Light weight (9 13 t) -> truckable
Minimum maintenance -> annual oil change
Flexible concept - Modular switchgear
10
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Influences on Dam Structure
Loads on dam Horizontal dam loads
Statical loads less than without HYDROMATRIX
Dynamical loads identical Vertical dam loads Additional weight through modules
Additional weight through new crane and trash rack cleaning machine
Civil works Anchors for guiding rails, supports and platforms Protection pipes, cable trays
12
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Innovation: From HYDROMATRIX to StrafloMatrixTM
HYDROMATRIX StrafloMatrixTM
Turbine
Turbine
Generator
Generator
13
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Differences HYDROMATRIX vs StrafloMatrixTM
HYDROMATRIX
Simple Bulb Design
Synchronous or Asynchronous Operation Perm. Magnets or Conventional Rotor Winding Longer, Heavier than StrafloMatrix
StrafloMatrix
Generator outside of flow (straight flow)
Synchronous Operation Permanent Magnet Technology Shorter, Less Weight No PF Compensation required
PF Compensation (for asynchronous version only)
14
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Operation Aspects
Maintenance intervals
TG-Units: Annual Oil Inspection / Change
BOP Equipment:
According to maintenance schedule UW - Cables: Change every 10-12 years
Accessibility
Easy access to all maintenance-relevant components without disturbance of overall plant operation
Expected life time
Identical to conventional hydropower concepts
15
ANDRITZ HYDRO 2012
[Link]
StrafloMatrixTM
Features of the StrafloMatrix unit
Turbine runner serves as support for the generator rotor Generator rotor is equipped with permanent magnets
16
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Potential Applications
Navigation Dams
Irrigation Dams
Intake Towers
Canals and Abandoned Shiplocks
18
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX
Application: Irrigation Dams
HYDROMATRIX Experience Irrigation Dams JEBEL AULIA /Sudan
Client: National Electricity Corp. D = 1,120 mm n = 375 rpm H = 5.5 m Ptu = 380 kW 80 Hydromatrix units in 40 modules Ptotal = 30.4 MW Existing barrage on the White Nile Contract award: 2000
20
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Experience Irrigation Dams JEBEL AULIA /Sudan
Status November 2003
22
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Experience Irrigation Dams JEBEL AULIA /Sudan
Status November 2003
23
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Experience Irrigation Dams JEBEL AULIA /Sudan
Status November 2003
24
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Experience Irrigation Dams JEBEL AULIA /Sudan
Status November 2003
25
ANDRITZ HYDRO 2012
[Link]
StrafloMatrixTM Experience Agonitz / Austria
Client: Energie AG D = 1,120 mm n = 428.6 rpm H = 8.5 m Ptu = 700 kW 1 unit, further development of HYDROMATRIX Contract award: 2002 Commissioning: 2003
27
ANDRITZ HYDRO 2012
[Link]
StrafloMatrixTM Experience Agonitz / Austria
Installation of the first permanent StrafloMatrix unit in March 2004
28
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Experience NUSSDORF / Austria
Client: AHP / EVN / Wienstrom
29
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Experience NUSSDORF / Austria
Client: AHP / EVN / Wienstrom D = 1,320 mm n = 336.7 rpm H = 5.86 m Ptu = 545 kW 12 single units Ptotal = 4.5 MW Contract award: 2004 Commissioning: 2005
30
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Experience NUSSDORF / Austria
Client: AHP / EVN / Wienstrom D = 1,320 mm n = 336.7 rpm H = 5.86 m Ptu = 545 kW 12 single units Ptotal = 4.5 MW Contract award: 2004 Commissioning: 2005
31
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Experience NUSSDORF / Austria
Construction Phase
32
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX
Application: Intake Towers
HYDROMATRIX Experience Intake Tower COLEBROOK / USA
Client: Metro Hartford D = 660 mm n = 900 rpm H = 8 - 35 m Ptu = 500 kW 6 units in 2 modules*) Ptotal = 3 MW Contract award: 1987 Commissioning: 1988
*) Design by Obermeyer Hydro Inc.
34 ANDRITZ HYDRO 2012 [Link]
HYDROMATRIX
Application: Shiplocks
HYDROMATRIX Experience Sluice in Shiplocks FREUDENAU / Austria
Client: Donaukraft D = 910 mm n = 500 rpm H = 10.3 - 1.0 m Ptu = 200 kW 25 units in one module Ptotal = 5 MW Contract award: 1997 Commissioning: 2000
38
ANDRITZ HYDRO 2012
[Link]
CHIEVO DAM - Italy Project Location
39
ANDRITZ HYDRO 2012
[Link]
CHIEVO DAM - Italy Design Challenges
Use minimum river discharge for hydropower generation at existing lock & dam Maintain flood discharge capability through lock Use existing lock structure without major modifications Preserve architectural appearance of historic environment Establish possibilities for fish migration
40
ANDRITZ HYDRO 2012
[Link]
CHIEVO DAM - Italy Plant Layout
41
ANDRITZ HYDRO 2012
[Link]
StrafloMatrixTM Experience CHIEVO DAM / Italy
Client: Consorzio Canale Ind. le [Link]
Consultant: Studio Frosio D = 1,320 mm n = 250 rpm H = 3.8 m Ptu = 270 kW 5 units in 1 module
Prior to StrafloMatrix plant construction
Ptotal = 1.35 MW
Annual Energy: 12 GWh Project Start: 2007
During StrafloMatrix plant construction
Commissioning: 2009
42
ANDRITZ HYDRO 2012
[Link]
StrafloMatrixTM Experience CHIEVO DAM / Italy
The Winner of Austrian State Award for Environmental and Energy Technology 2010
44
ANDRITZ HYDRO 2012
[Link]
LOWER ST. ANTHONY FALLS - USA StrafloMatrixTM Power Plant
LSAF prior to installation of StrafloMatrixTM Power Plant
(3)
LSAF after installation of StrafloMatrixTM Power Plant
45
ANDRITZ HYDRO 2012
[Link]
LOWER ST. ANTHONY FALLS - USA Design Challenges
Use existing lock structure without major modifications (no excavation)
Maintain flood discharge capability through lock
Model test at TU VIE Fulfill grid interconnection requirements
No adverse effects on barge and rec. boat traffic
Preserve architectural appearance of existing lock
46
ANDRITZ HYDRO 2012
[Link]
LOWER ST. ANTHONY FALLS - USA StrafloMatrixTM Plant in Auxiliary Shiplock
Technical Data:
16 TG-units (2 rows of 8)
D = 1,320 mm
n=327.3 rpm H GR max = 7.6 m P Gen = 625 kW Max. Plant Capacity: 10 MW Annual Energy: 62 GWh Project Start: 2007
Commissioning and taking over: 2011
Output 8 % higher than guarenteed
47 ANDRITZ HYDRO 2012 [Link]
LOWER ST. ANTHONY FALLS - USA Site Construction and Equipment Installation
48
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Experience ASHTA I & II / Albania
Client: Energji Ashta
2 HYDROMATRIX plants 45 Modules (1 row) per plant 1 TG-Unit per Module Ptotal = 24 + 45 MW Annual Energy: 242 GWh Project Start: Dec. 2008 Commissioning: 2012
50
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Experience ASHTA I & II / Albania
Plant Layout
2 Plants, 45 TG-Units each
HPP Vau i Dejes KW Vau i Dejes
6 km newly constructed discharge canal between Ashta 1 & 2
Spathara weir Spatharawehr
Turn-key supply of E & M Equipment
HPP Ashta22 KW Ashta
HPP Ashta 1 1 KW Ashta
Restwasserkanal, Residual flow canal, Fischaufstiegshilfe Fish ladder
Unterwasserkanal mit anschl. Tailrace canal with riverbed deepening Unterwassereintiefung
Diversion channel Ausleitungskanal
Source: Energij Ashta - A project company of VERBUND and EVN, used by permission
51
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Experience ASHTA I & II / Albania
TECHNICAL DATA: Ashta 1
OUTPUT: 45 x 534 kW = 24.03 MW / 24.64 MVA HEAD: 4.98 m SPEED: 300.0 rpm RUNNER DIAMETER: 1,320 mm RATED VOLTAGE: 3,300 V
TECHNICAL DATA: Ashta 2
NUMBER OF TG-UNITS: 45 OUTPUT: 45 x 1,003 kW = 45.14 MW / 46.29 MVA HEAD: 7.53 m SPEED: 375.0 rpm RUNNER DIAMETER: 1,320 mm RATED VOLTAGE: 3,300 V Sectional View Ashta 1
52
ANDRITZ HYDRO 2012
[Link]
ASHTA I & II Project Power house
Ashta I View from downstream side
Ashta II View from downstream side
Source: Energij Ashta - A project company of VERBUND and EVN, used by permission
53
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX ASHTA I & II / Albania
Ashta 1- during construction, Upstream view
Hydromatrix TG-units
54
ANDRITZ HYDRO 2012
[Link]
ASHTA I & II Site Construction - Status 2011
Ashta 1 - First section, upstream side, Intake canal Ashta 1 - power house & installed crane
Ashta 1 - UG-Gallery, ready for installation of Ashta 1 - Installed Draft Tube Gate
E & M equipment
Ashta 2 - Start of concreting dam
55
ANDRITZ HYDRO 2012
[Link]
ASHTA I Site Construction - Status January 2012
Upstream view
Downstream view
56
ANDRITZ HYDRO 2012
[Link],
ASHTA II Site Construction: Januar 2012
Upstream view
Downstream view
57
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX
Application: Navigation Dams
HYDROMATRIX Concept Navigation Dams Ohio River
59
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Concept Navigation Dams Ohio River
Typical purpose of navigation dams: Navigation and flood control HYDROMATRIX concept: Installation of movable HYDROMATRIX modules in bulkhead gate slots
Lock & Dam on the Ohio River
Radial gates
Bay 11 Bay 10 Bay 9 Bay 8 Bay 7 Bay 6 Bay 5 Bay 4 Bay 3 Bay 2 Bay 1
HYDROMATRIX modules
Flow
60
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Concept Navigation Dams Ohio River
5 Power Modules installed in stoplog slots of the tainter gate bays HYDROMATRIX: 2 x 17 units per Module Runner Diameter: Rated Net Head: Rated unit Discharge Rated Module Discharge Rated output / TG unit: Total Rated Plant Output: 1.25 m 6.5 m 10.6 m/s 360.4 m/s 500 kW 85 MW
61
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Concept Module Cross Section
HW
Spillway Gates
Intake Trashracks
TW
Generator Switchgear & control system
Hydraulic Pressure Unit
Turbine Generator units
Draft Tube Gates
62
ANDRITZ HYDRO 2012
[Link]
HYDROMATRIX Contact Worldwide
[Link]
For more information about HYDROMATRIX please contact:
Alexander BIHLMAYER HYDROMATRIX Product Management
ANDRITZ HYDRO GmbH A - 4031 Linz, Austria Lunzerstrasse 78
Phone: Fax: E-mail: Web: +43 (732) 6986 74261 +43 (732) 6980 2554 [Link]@[Link] [Link]
63
ANDRITZ HYDRO 2012