Design Calculation
Project Title:
Project No.
Checked By:
Date:
Date:
Nov/08/13
Underground Pipe Stress Check - UGP 2
PIPE STRESSES - WHEELS ON RIGID PAVEMENT
Earth Loading
hc
42 in.
42 in.
Pipe Size =
O.D. =
8 in.
Conc. Thick. hc =
wd = Cd w Bd^2 =
where:
1316.6 lb / lin ft.
120
w=
5
Bd =
Bd =
5.0
Bc = O.D. =
3.50
Bd
H
lb/ft^3 soil unit wt.
ft. (actual width)
ft. (effective width)
ft
Bc
Cd = 1 - e^ (-2 ku'(H/Bd))
2 ku'
=
0.439
2.33 ft.
0.13 lb / in^3
H=
ku' =
ku' = modulus of subgrade reaction
Saturated clay = 0.110
Ordinary clay = 0.130
Saturated topsoil = 0.150
Sand and gravel = 0.165
Ref. 1
Bd max. = Transitional trench width from table below
5 ft.
=
Table 13 to 28
Bd = Max. effective transitional trench width
Bd
Pipe Dia.
6
8
12
16
18
24
30
36
42
48
54
60
Pipe Cover = H ( ft. )
5
1.42
1.75
2.5
3
3.42
4.25
4.83
5.42
5.92
6.5
7.08
7.67
6
1.5
1.83
2.58
3.08
3.5
4.33
5.17
5.75
6.33
6.92
7.42
8
7
1.58
1.92
2.75
3.17
3.58
4.5
5.33
6.17
6.67
7.25
7.83
8.42
8
1.67
2
2.83
3.25
3.75
4.58
5.42
6.25
7.08
7.67
8.17
8.75
9
1.75
2
2.92
3.33
3.83
4.67
5.58
6.42
7.25
8.08
8.58
9.08
10
1.75
2.08
3
3.42
3.92
4.83
5.67
6.58
7.42
8.17
9
9.5
15
2.08
2.42
3.33
3.83
4.33
5.25
6.17
7.08
7.92
8.83
9.67
10.5
20
2.33
2.75
3.67
4.25
4.75
5.67
6.67
7.58
8.42
9.33
10.25
11.08
For shallow depths (< 4ft.) use :
wd = H Bc w =
978.6 lb / lin ft.
Therefore wd =
wd total =
978.6 lb / lin ft.
1328.6 lb / lin ft.
+ wt. of concrete =
350 lb / lin. Ft.
(1 of 3)
N:\civil\spreadsh\UGPipes\u-g [Link]
X
P4
P1
Sum loads
at this point
Wheel Loading
X
P4
P1
From Individual Wheel Loads
Wheel
#
1
2
3
4
5
6
P
( lbs. )
17500
17500
17500
17500
X
( ft. )
0.00
7.00
21.20
20.00
0.00
0.00
A contact
( ft. ^2 )
1.92
1.92
1.92
1.92
0.00
0.00
L
( ft. )
2.45
2.45
2.45
2.45
2.45
2.45
X
Ref. 2 , [Link].2
Sum loads
at this point
P3
H/L
X/L
P2
Lr
Ref. 4
80 psi.
1.267 1.5 at surface
1.0 @ H = 5 ft.
200 lb / in^3
k mod. of subgrade reaction =
3400000 psi
Ec conc. =
Tire Pressure =
Impact Factor = Fi =
Press. Coef.
Pressure
Top Pipe (lb./ft^2)
Ref 4
1204.2
Table 1
189.7
0.0
0.0
0.0
0.0
Total: = 1393.9
( C from below)
0.95
0.95
0.95
0.95
0.95
0.95
0.00
2.86
8.67
8.18
0.00
0.00
1.6
0.048
0.047
0.045
0.043
0.039
0.035
0.030
0.027
0.024
0.021
0.019
0.017
0.015
0.013
0.011
0.010
2.0
0.032
0.033
0.033
0.032
0.030
0.028
0.026
0.023
0.021
0.019
0.018
0.015
0.013
0.012
0.010
0.009
0.0825
0.013
0
0
Pressure Coeficient C
C
H/L
0.0
0.4
0.8
1.2
1.6
2.0
2.4
2.8
3.2
3.6
4.0
4.4
4.8
5.2
5.6
6.0
0.0
0.113
0.101
0.089
0.076
0.062
0.051
0.043
0.037
0.032
0.027
0.024
0.020
0.018
0.015
0.014
0.012
0.4
0.105
0.095
0.084
0.072
0.059
0.049
0.041
0.036
0.030
0.026
0.023
0.020
0.017
0.015
0.013
0.012
0.8
0.089
0.082
0.074
0.065
0.054
0.046
0.039
0.033
0.029
0.025
0.022
0.019
0.017
0.014
0.013
0.011
Total Wheel Pressure at Top of Pipe =
X/L
1.2
0.068
0.065
0.061
0.054
0.047
0.042
0.036
0.031
0.026
0.023
0.020
0.018
0.016
0.014
0.012
0.011
2.4
0.020
0.021
0.022
0.022
0.022
0.022
0.021
0.019
0.018
0.016
0.015
0.014
0.012
0.011
0.010
0.009
2.8
0.011
0.011
0.012
0.014
0.016
0.016
0.016
0.015
0.014
0.014
0.013
0.012
0.011
0.010
0.009
0.008
3.2
0.006
0.004
0.005
0.008
0.011
0.011
0.011
0.011
0.011
0.011
0.011
0.010
0.009
0.008
0.008
0.007
3.6
0.002
0.001
0.002
0.005
0.007
0.008
0.008
0.009
0.009
0.009
0.009
0.009
0.008
0.007
0.007
0.007
4
0.000
0.000
0.001
0.003
0.005
0.006
0.006
0.006
0.007
0.007
0.007
0.007
0.007
0.006
0.006
0.006
1393.9 lb / ft.^2
Pipe Stresses
Pipe Dia. O.D. =
42
0.50
Wall thickness t =
X65
Pipe Grade =
SMYS = 65000
Pipe Operating Pres. = 1000.0
0.8
SMYS design factor F =
Young's Mod. E = 30000000 psi.
0.3
Poisson's Ratio =
Coef. Thermal Exp. = 0.0000065 per deg F
in.
in.
psi.
psi.
Temp. @ Pipe Installation =
Max./Min. Operating Temp. =
10
170
deg. F
deg. F
Circumferential Stress Due to Earth Load
Ref. 2
She = Khe Be Ee lamda D =
2756.3 psi.
Value by Ref 1 (above) =
978.6 psi.
Use largest Value set SHe =
+ wt. Concrete = She tot. =
2756.3 psi.
2756.9 psi.
Wheel Load Stress
w=
9.68 psi. from above
Khe = soil/pipe stiffness coef. =
4500 Fig. 3
(set E' = 1.0)
t / d = 0.011905
Fig. 4
Be =
0.21
(Soil Type B for trenches)
where H/Bd = 0.665714
(for trenched constuction)
Ee =
1
lamda = unit wt. Soil =
120
lb / ft^3
D=
42
in
where:
(2 of 3)
where:
Cyclic Circumferential Stress
SHh = KHh GHh R L Fi w
=
86.10 psi.
Cyclic Longitudinal Stress
SLh = KLh GLh R L Fi w
=
55.96 psi.
Internal Pressure Circumferential Stress
Shi = p (D - t ) / 2 t
=
41500 psi.
Fig. 14
KHh = circumf. stiffness factor =
12.5
where: t / d = 0.011905
GHh = geometry factor =
GHh
Pipe dia.
6
12
18
24
30
36
42
48
54
60
3-4
1.45
1.28
1.08
1.12
1.07
1.01
0.96
0.92
0.87
0.85
R = pavement factor =
L = Axle configuration =
0.96
Set Er = 10
from Fig. 15
Fig. 15
H, soil cover ( ft. )
6
8
1.15
0.9
1.05
0.85
0.95
0.77
0.85
0.73
0.8
0.68
0.76
0.64
0.72
0.6
0.69
0.55
0.66
0.51
0.63
0.47
10
0.7
0.67
0.63
0.58
0.54
0.5
0.46
0.43
0.41
0.38
Ref. 2
0.90
0.65
==>
Table 2
Limits of Calculated Stress
KLh = long. Stiffness factor =
GLh = geometry factor =
SHi (Barlow) = p D / 2 t
< or = F E T SMYS (natural gas)
< or = F E SMYS (liquids)
where:F = design factor =
E = joint factor =
T = temp. derating =
SHi (Barlow) =
<=
<=
0.8
1.0
1.0
42000 psi
52000 (nat. gas)
52000 (liquids)
Ref. 3
Ref. 2
OK
OK
Fig. 16
10
where t / d = 0.011905
1.) Check Pressure Stress using Barlow formula
GLh
Pipe dia.
6
10
12
18
24
30
36
42
48
54
60
3-4
1.55
1.23
1.15
1.1
1.02
0.94
0.86
0.78
0.7
0.62
0.54
0.78
Set Er = 10
from Fig. 17
H, soil cover
6
1.45
1.1
1.02
0.93
0.87
0.8
0.73
0.65
0.58
0.51
0.44
( ft. )
8
1.35
1
0.88
0.83
0.75
0.69
0.63
0.58
0.52
0.46
0.41
Fig. 17
10
1.25
0.9
0.8
0.7
0.57
0.53
0.48
0.44
0.4
0.36
0.32
2.) Check Total Effective Stress
Seff =SQRT [ 1/2 ( (S1 - S2)^2 + (S2 - S3)^2 + (S3 - S1)^2)] < or = SMYF F
S1 = SHe + SHr + SHi =
44343 psi
S2 = SLr - Es Coef. Thermal Exp. (T2 - T1) + poisons ratio ( SHe + SHi) =
S3 = - P =
-1000.0 psi
S eff =
32130 psi
< or =
52000 psi
44533 psi
OK -- Stress within allowables
References:
1. )
Concrete Pipe Design Manual ACPA 5th Printing June 1980
2. )
API Recommended Practice 1102 Steel Pipelines Crossing Railroads and Highways 6th Editition 1993
3. )
CAN/CSA Z183 - M90
4. )
PCA Vertical Pressure on Culverts Under W heel Loads on Concrete Pavement Slabs
5. )
PCA Concrete Floors on Ground
(3 of 3)
Design Calculation
Project Title:
Project No.
014173
Date:
Checked By:
Date:
Nov/08/13
Underground Pipe Stress Check - UGP 1
PIPE STRESSES - WHEELS ON UNPROTECTED FILL
Earth Loading
42 in.
42 in.
Pipe Size =
O.D. =
Bd
Ref. 1
1666.6 lb / lin ft.
120 lb/ft^3 soil unit wt.
w=
5 ft. (actual width)
Bd =
Bd =
5.0 ft. (effective width)
Bc = O.D. =
3.50 ft
wd = Cd w Bd^2 =
where:
Bc
Cd = 1 - e^ (-2 ku'(H/Bd))
2 ku'
=
0.556
H=
ku' =
3 ft.
0.13 lb / in^3
ku' = modulus of subgrade reaction
Saturated clay = 0.110
Ordinary clay = 0.130
Saturated topsoil = 0.150
Sand and gravel = 0.165
Ref. 1
Table 13 to 28
Bd max. = Transitional trench width from table below
5 ft.
=
Bd = Max. effective transitional trench width
Bd
Pipe Dia.
6
8
12
16
18
24
30
36
42
48
54
60
Pipe Cover = H ( ft. )
5
1.42
1.75
2.5
3
3.42
4.25
4.83
5.42
5.92
6.5
7.08
7.67
6
1.5
1.83
2.58
3.08
3.5
4.33
5.17
5.75
6.33
6.92
7.42
8
7
1.58
1.92
2.75
3.17
3.58
4.5
5.33
6.17
6.67
7.25
7.83
8.42
8
1.67
2
2.83
3.25
3.75
4.58
5.42
6.25
7.08
7.67
8.17
8.75
9
1.75
2
2.92
3.33
3.83
4.67
5.58
6.42
7.25
8.08
8.58
9.08
10
1.75
2.08
3
3.42
3.92
4.83
5.67
6.58
7.42
8.17
9
9.5
15
2.08
2.42
3.33
3.83
4.33
5.25
6.17
7.08
7.92
8.83
9.67
10.5
20
2.33
2.75
3.67
4.25
4.75
5.67
6.67
7.58
8.42
9.33
10.25
11.08
For shallow depths (< 4ft.) use :
wd = H Bc w =
1260.0 lb / lin ft.
Therefore wd =
1260.0 lb / lin ft.
(1 of 3)
N:\civil\spreadsh\UGPipes\u-g [Link]
Wheel Loading
P4
P1
Sum loads
at this point
From Individual Wheel Loads
X
P4
80 psi.
1.2
1.5 at surface
1.0 @ H = 5 ft.
Ref. 2 , [Link].2
P
( lbs. )
17500
17500
17500
17500
X
( ft. )
0.00
7.00
21.20
20.00
0.00
0.00
A contact
( ft. ^2 )
1.82
1.82
1.82
1.82
0.00
0.00
r
( ft. )
0.76
0.76
0.76
0.76
0.00
0.00
H/r
P2
P3
Ref. 4
Wheel
#
1
2
3
4
5
6
Sum loads
at this point
Tire Pressure =
Impact Factor = Fi =
P1
X/r
Press. Coef.
Pressure
Top Pipe (lb./ft^2)
1202.7
27.6
13.8
13.8
0.0
0.0
Total: = 1258.0
( C from below)
3.94
3.94
3.94
3.94
#DIV/0!
#DIV/0!
0.087
0.002
0.001
0.001
0.00
9.19
27.83
26.26
#DIV/0!
#DIV/0!
Pressure Coeficient C
C
H/r
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
5.0
6.0
7.0
8.0
9.0
10.0
0.0
1.000
0.911
0.646
0.424
0.284
0.200
0.146
0.110
0.087
0.057
0.040
0.030
0.023
0.018
0.015
1.0
1.000
0.425
0.350
0.250
0.198
0.145
0.110
0.101
0.081
0.054
0.039
0.029
0.023
0.018
0.015
2.0
0.000
0.010
0.500
0.075
0.075
0.070
0.066
0.060
0.054
0.041
0.032
0.025
0.020
0.016
0.014
Total Wheel Pressure at Top of Pipe =
X/r
3.0
0.000
0.001
0.005
0.012
0.020
0.026
0.029
0.031
0.031
0.028
0.024
0.020
0.017
0.014
0.012
4.0
0.000
0.000
0.001
0.004
0.007
0.010
0.013
0.015
0.017
0.017
0.017
0.015
0.013
0.012
0.010
5.0
0.000
0.000
0.000
0.001
0.003
0.004
0.006
0.008
0.009
0.011
0.010
0.011
0.010
0.009
0.009
6.0
0.000
0.000
0.000
0.000
0.001
0.002
0.003
0.004
0.005
0.006
0.007
0.008
0.008
0.007
0.007
7.0
0.000
0.000
0.000
0.000
0.001
0.001
0.002
0.002
0.003
0.004
0.005
0.005
0.006
0.006
0.006
1258.0 lb / ft.^2
Pipe Stresses
Pipe Dia. O.D. =
Wall thickness t =
Pipe Grade =
SMYS =
Pipe Operating Pres. =
SMYS design factor F =
42
0.50
X65
65000
1000.0
0.8
Young's Mod. E = 30000000 psi.
0.3
Poisson's Ratio =
Coef. Thermal Exp. = 0.0000065 per deg F
in.
in.
psi.
psi.
Temp. @ Pipe Installation =
Max./Min. Operating Temp. =
10
170
deg. F
deg. F
Circumferential Stress Due to Earth Load
Ref. 2
She = Khe Be Ee lamda D =
3675.0 psi.
Value by Ref 1 (above) =
1260.0 psi.
Use largest Value set She =
3675.0 psi.
Khe = soil/pipe stiffness coef. =
4500 Fig. 3
(set E' = 1.0)
t / d = 0.011905
Fig. 4
Be =
0.28
where H/Bd = 0.85714
(Soil Type B for trenches)
(for trenched constuction)
Ee =
1
lamda = unit wt. Soil =
120
lb / ft^3
(2 of 3)
D=
42
in
where:
Wheel Load Stress
w=
8.74 psi. from above
where:
Cyclic Circumferential Stress
KHh = circumf. stiffness factor =
where: t / d =
12.5
0.0119
Fig. 14
Set Er = 10
SHh = KHh GHh R L Fi w
=
89.95 psi.
Cyclic Longitudinal Stress
SLh = KLh GLh R L Fi w
=
58.46 psi.
Internal Pressure Circumferential Stress
Shi = p (D - t ) / 2 t
=
41500 psi.
GHh = geometry factor =
GHh
Pipe dia.
6
12
18
24
30
36
42
48
54
60
3-4
1.45
1.28
1.08
1.12
1.07
1.01
0.96
0.92
0.87
0.85
R = pavement factor =
L = Axle configuration =
0.96
from Fig. 15
H, soil cover
6
1.15
1.05
0.95
0.85
0.8
0.76
0.72
0.69
0.66
0.63
Fig. 15
( ft. )
8
0.9
0.85
0.77
0.73
0.68
0.64
0.6
0.55
0.51
0.47
10
0.7
0.67
0.63
0.58
0.54
0.5
0.46
0.43
0.41
0.38
Ref. 2
Table 2
1.10
0.65
==>
Limits of Calculated Stress
KLh = long. Stiffness factor =
1.) Check Pressure Stress using Barlow formula
GLh = geometry factor =
SHi (Barlow) = p D / 2 t
< or = F E T SMYS (natural gas)
< or = F E SMYS (liquids)
where:F = design factor =
E = joint factor =
T = temp. derating =
SHi (Barlow) =
<=
<=
0.8
1.0
1.0
42000 psi
52000 (nat. gas)
52000 (liquids)
Ref. 3
Ref. 2
OK
OK
GLh
Pipe dia.
6
10
12
18
24
30
36
42
48
54
60
3-4
1.55
1.23
1.15
1.1
1.02
0.94
0.86
0.78
0.7
0.62
0.54
0.78
Fig. 16
10
where t / d = 0.0119048 Set Er = 10
from Fig. 17
H, soil cover
6
1.45
1.1
1.02
0.93
0.87
0.8
0.73
0.65
0.58
0.51
0.44
( ft. )
8
1.35
1
0.88
0.83
0.75
0.69
0.63
0.58
0.52
0.46
0.41
Fig. 17
10
1.25
0.9
0.8
0.7
0.57
0.53
0.48
0.44
0.4
0.36
0.32
2.) Check Total Effective Stress
Seff =SQRT [ 1/2 ( (S1 - S2)^2 + (S2 - S3)^2 + (S3 - S1)^2)] < or = SMYF F
S1 = SHe + SHr + SHi =
45265 psi
S2 = SLr - Es Coef. Thermal Exp. (T2 - T1) + poisons ratio ( SHe + SHi) =
S3 = - P =
-1000.0 psi
S eff =
32555 psi
< or =
52000 psi
44811 psi
OK -- Stress within allowables
References:
1. )
2. )
3. )
4. )
Concrete Pipe Design Manual ACPA 5th Printing June 1980
API Recommended Practice 1102 Steel Pipelines Crossing Railroads and Highways 6th Editition 1993
CAN/CSA Z183 - M90
PCA Vertical Pressure on Culverts Under Wheel Loads on Concrete Pavement Slabs
(3 of 3)