100% found this document useful (6 votes)
2K views6 pages

Concrete Electric Pole Factory

The document discusses the pre-construction engineering services required for a proposed concrete electric pole factory. It covers subsoil investigation, architectural design, structural design, electrical and mechanical design, bill of quantities, type of production, basic factory layout types, and product layout. It also discusses the layout design and provides a billing breakdown for the engineering design work.

Uploaded by

daddyed
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
100% found this document useful (6 votes)
2K views6 pages

Concrete Electric Pole Factory

The document discusses the pre-construction engineering services required for a proposed concrete electric pole factory. It covers subsoil investigation, architectural design, structural design, electrical and mechanical design, bill of quantities, type of production, basic factory layout types, and product layout. It also discusses the layout design and provides a billing breakdown for the engineering design work.

Uploaded by

daddyed
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
You are on page 1/ 6

CYRUS

CIVIL ENGINEERING PROJECTS

Suite H187 Ikota Shopping Co p!e" V#G#C$ %&ah$ Lago'# Te!#( )7)*+,*8781$ )8)-.*)88).#
E ai!(/01u'#enginee1ing2g ai!#/o

CYRUS Engineering Suite H187 Ikota Shopping Complex V.G.C A ah !ago" #el.$ %8%&'(%88%'.%7%()*(8781+ email$ ,-ru".engineering.gmail.,om

The Managing Director Ucak NIG. LTD Km 32/33 Lekki-E e E! . "a# I$e%& Lekki' Lago(.

5th Dec. 2013

RE: Concrete Electric Pole Factory


/ollo0ing our 1i",u""ion &n1 2e,. &%1( on the a3o4e "u3 e,t5 here i" a 3rie6ing o6 the re7ui"ite pre8,on"tru,tion engineering "er4i,e"$

Introduction !a-ing out a 6a,tor- in4ol4e" 1e,i1ing 0here to put all the 6a,ilitie"5 ma,hine"5 e7uipment an1 "ta66 in the pro1u,tion operation . !a-out 1etermine" the 0a- in 0hi,h material" an1 other input" 6lo0 through the operation.

#he 6ollo0ing 0ill 3e re7uire1 a" the ne,e""ar- pre8,on"tru,tion engineering "er4i,e"$

Su3"oil in4e"tigation 9 to 1etermine nature o6 un1erline "trata an1 3earing ,apa,it- 6or 6oun1ation anal-"i" an1 1e"ign.

Ar,hite,tural 1e"ign 9 re7uire1 6or "pa,e planning to 1etermine 0ork ,enter" 6or pro1u,tion operation.

Stru,tural 1e"ign 9 ne,e""ar- 6or 1etermining mem3er "i:ing an1 ,on"tru,tion "pe,i6i,ation.

Ele,tri,al an1 me,hani,al 9 re7uire1 6or po0er "uppl- an1 plum3ing.

;ill o6 <uantitie" 9 to 1etermine the pro e,t ,o"t.

Type of Production

=o33ing operation+ ,hara,teri:e 3- 0i1e 4ariet- o6 pro1u,t" an1 lo0 4olume.

;at,h operation+ ,hara,teri:e 3- me1ium 4ariet- an1 me1ium 4olume.

Continuou" operation+ ,hara,teri:e 3- lo0 4ariet- an1 high 4olume.

#he propo"e1 ,on,rete pole pro1u,tion 6a,tor- i" inten1e1 to pro1u,e 6our 1i66erent ,on,rete pole" at 1>% pie,e" per 1a-+ there6ore it ,an 3e ,la""e1 a" a ,ontinuou" t-pe operation. Basic Factory Layout Types

?ro,e"" !a-out Cell !a-out

?ro1u,t !a-out

Sin,e 0e are primaril- ,on,erne1 0ith a ,ontinuou" operation in the ,on,rete pole pro1u,tion 0e "hall 3e a1opting a pro1u,t la-out 6or the propo"e1 6a,tor-. Product Layout In pro1u,t la-out 1e"ign the ma,hine" an1 e7uipment are lo,ate1 "o that ea,h pro1u,t 6ollo0" a pre8arrange1 route through a "erie" o6 pro,e""e". #he pro1u,t 6lo0 along a line o6 pro,e""e" that i" ,lear an1 pre1i,ta3le.

?ro1u,t la-out ha4e high 6ixe1 ,o"t to "et up the manu6a,turing line" an1 lo0 4aria3le ,o"t" 6or pro1u,ing large 4olume" o6 the "ame pro1u,t. Layout Design #he la-out 1e"ign 0ill 1etermine$

@ork ,enter" o6 the operation i.e. the exa,t lo,ation o6 the 6a,ilitie"5 e7uipment an1 "ta66.

Spa,e to 3e 1e4ote1 to ea,h 0ork ,enter"

#a"k to 3e un1ertaken 3- ea,h 0ork ,enter.

Project Engineering Design Billing A

Su3"oil in4e"tigation 88888888888888888888888888 &0%5%%%Bplot

Ar,hite,tural 1e"ign 888888888888888888888888888 &>%5%%%

Stru,tural 1e"ign 8888888888888888888888888888888 Ele,tri,al an1 Ce,hani,al 1e"ign 8888888888 1%%5%%%

(%%5%%%

;ill o6 <uantitie" 8888888888888888888888888888888

7%5%%%

You might also like