SEISMIC JOINT CLIP
Main Beam
The Armstrong Seismic Joint Clip Main Beam (SJMR) works with Armstrong 15/16" Prelude grid system and 9/16" Suprafine grid system.
Product Description
Materials A. General: Commercial-quality cold rolled hot dipped
galvanized steel, chemically cleansed.
Key Selection Attributes
IBC mandates that ceiling areas greater than 2500 sf must have seismic separation joints Armstrong conducted full-scale testing at the State University of New York, University at Buffalo, which provides evidence of performance in IBC Category D, E, and F installations SJMR15 and SJMR9 give architects and designers a clean look, and save contractors time with a reliable installation method Easily installs in minutes at the main beam splice Maintains integrity of the ceiling module, unlike eld assembled alternatives Allows for a full acoustical panel at the joint Not visible from the oor Lower material costs than many other alternative methods Easier to keep the ceiling system square
B. Components:
a. Seismic Joint Clip, stamped, unnished, single piece unit with slots and screw holes b. Expansion Sleeve, stamped, exposed face prenished in baked polyester paint Note: Not suitable for use with vector panels.
Seismic Joint Clip Main Beam
Expansion Sleeve
Bucket # SJMR15
Description Seismic Joint Clip Main Beam for 15/16" grid 4" Expansion Sleeve For Prelude 15/16" Main Beam Seismic Joint Clip Main Beam for 9/16" grid 4" Expansion Sleeve For Suprane 9/16" Main Beam
Dimension 4 x 1" nominal 4 x 15/16" nominal 4 x 1" nominal 4 x 9/16" nominal
Color/ Finish Unpainted
ES4
White
SJMR9
Unpainted
ES49
White
Please visit [Link]/seismic
SEISMIC JOINT CLIP
Main Beam
Its simple to install with these easy steps:
How to install the Seismic Joint Clip Main Beam.
Step 1: Determine which splices will receive the separation joint by dividing the total area into sections not greater than 2500 sf. Attach a hanger wire within 3" of the splice that will receive the clip. Step 2: Install complete grid system. Follow typical procedures except that all main beam splices must line up across the space. Step 3: Prepare the main beam splice to receive the separation joint clip by cutting the locking tab from the left side of the connection and removing " from the end of the beam on the right. Step 4: Install the clip using the screws provided. Screws #1 and #2 install through the holes in the clip and into the right hand main beam. Step 5: Align the indexing nib with the lower hole on the left hand main and insert screws #3 & 4 into the upper holes. Step 6: Snap the ES4 or ES49 expansion sleeve over the gap at the face of the main beam and crimp the four corners with a pair of pliers. Step 7: Install SJCG cross tee separation joint clips at one end of every cross tee that spans the area of main beam separation. Follow instructions found on the SJCG data page (CS-3815).
#3
#4 Indexing Nib #1 #2
3/4 from centerline
Main Beam in 2 x 4 Layout
4
Main Beam/ Cross Tee in 2 x 2 Layout
4 4 Main Beam Main Beam SJCG SJMR Main 2 Beam SJMR
Main Beam/ Cross Tee in 2 x 4 Layout
Main Beam SJMR
Main Beam
Main Beam
Main Beam
SJCG
SJMR
SJMR SJMR
SJCG 2
SJMR 4 Cross Tee
SJCG SJMR SJCG
SJMR
SJMR
4 Cross Tee
4 Cross Tee
4 Cross Tee SJCG 2 Cross Tee 2 Cross Tee SJCG
TechLineSM / 1 877 ARMSTRONG 1 877 276 7876 [Link]/suspensionsytems
CS-3955-909
All trademarks used herein are the property of AWI Licensing Company and /or its affiliates 2009 AWI Licensing Company Printed in the United States of America