0% found this document useful (0 votes)
101 views10 pages

Integrated Solution: Conception To Construction: Future Fuels LLC

Future Fuels LLC presents an integrated solution for coal gasification energy projects from conception through construction. Their solution combines development skills, technology rights, and engineering expertise. They have exclusive rights to TPRI gasification technology, a two-stage oxygen blown dry feed entrained flow gasification process that can accommodate a wide range of fuels and conform to strict emission standards. Future Fuels' integrated approach aims to reduce project costs by 30% by handling all aspects of development, and they are currently pursuing projects in India, Kosovo, Slovakia, China, and the United States.

Uploaded by

Rajeev Verma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views10 pages

Integrated Solution: Conception To Construction: Future Fuels LLC

Future Fuels LLC presents an integrated solution for coal gasification energy projects from conception through construction. Their solution combines development skills, technology rights, and engineering expertise. They have exclusive rights to TPRI gasification technology, a two-stage oxygen blown dry feed entrained flow gasification process that can accommodate a wide range of fuels and conform to strict emission standards. Future Fuels' integrated approach aims to reduce project costs by 30% by handling all aspects of development, and they are currently pursuing projects in India, Kosovo, Slovakia, China, and the United States.

Uploaded by

Rajeev Verma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

IntegratedSolution:ConceptiontoConstruction

CoalGasificationEnergyProjects
FutureFuelsLLC
Presentsat
I i l S i COAL GAS 2010 InternationalSummitCOALGAS:2010
February2010,NewDelhi
This current report may contain forward-looking statements within the meaning of the
Private Securities Litigation Reform Act of 1995. Forward-looking statements are
statements that are not historical facts. Such forward-looking statements, based upon
the current beliefs and expectations of Future Ventures LLC and Future Fuels LLC p
(together the Company), are subject to risks and uncertainties, which could cause
actual results to differ from the forward looking statements. The following factors,
among others, could cause actual results to differ from those set forth in the forward-
looking statements: financial performance, competition, changing interpretations of g p p g g p
generally accepted accounting principles; continued compliance with government
regulations; legislation or regulatory environments, requirements or changes
adversely affecting the businesses in which the Company is engaged; demand for the
products and services that the Company provides, general economic conditions; y g
geopolitical events and regulatory changes. The information set forth herein should
be read in light of such risks. Neither the Company nor any affiliated entity including
the subsidiaries of the Company assume any obligation to update the information
contained in this current report.
ChangeisacertaintyinIndia
Cheapenergyisnolongeradriver
Copenhagen:Indiatoreduce25%CO2 emissionsby2020
EUandUScommittingbillionstoclimatechangepolicies
Chi t t d 50 ifi ti j t i l t d d Chinastarted50gasificationprojectsinlastdecade
ThenextdecadewillbelongtoIndia
CoalEnergy ChallengesinIndia
Despiteabundantsupplyandmatureinfrastructure
Environmentalmovementiscausingpoliticalfallout
Industrylackswrappedandintegratedsolutions
C l ifi ti i id d i k d i Coalgasificationisconsideredriskyandexpensive
VendorFragmentation:causesprojectdelaysanduncertainty
IndiaNeedsAnIntegratedSolution
FutureFuelsoffersacompletevaluechainsolution
Technology
Feedstock
Permits
E i i
Financing
Procurement
Feedstock
Plan
Engineering
Construction
Wecombinedevelopmentskillswithtechnologyrightsandengineering
ExclusiveRightsonTPRIGasification
WeintegrateourownTechnology
TwoStageGasifier
Dryfeed;entrainedflow
Oxygenblown
WideFuelFlexibility
1K,2K&3KTPDmodels
Syngas Cooler and Quench SyngasCoolerandQuench
TPRI GasificationTechnology
WesternizationofTechnology..
Conformstostrictcontrolsandemissionstandards
EndorsedbyU.S.DepartmentofEnergyandNationalLabs
P it f 270 M G d S i IGCC tt i d i 11 th Permitsfor270MwGoodSpringIGCCattainedin11months
ThiswillbethecleanestpowerprojectinU.S.
TheIntegratedSolution
Planning
Commissioning
OURPROJECTSCANCOST30%LESS
Inspection Logistics Fabrication Construction
Wecombinedevelopmentskillswithtechnologyrightsandengineering
FutureFuelsProjects
KOSOVO
SLOVAKIA
INDIA
SLOVAKIA
CHINA
USA CHINA2
WeAreCommittedtoIndia
RajSuri
CEO
TeoLysak
Slovakia
BillDouglas
Marketing
NickCohen
COO
JimPalumbo
Pres.USA
Elmi Berisha
Kosovo
AlbertLin
CorpDev
SteveTholen
ProjectFinance
LiXiaoyu
Technology
PleasecontactourInternationalTeam

You might also like