This document provides work instructions for receiving inspection of materials and equipment. It outlines the objectives, scope, responsibilities, procedures, tools, health and safety instructions, and related documents for inspection. The key points are: - Materials are classified and inspected depending on their type, such as standard, project specific, tools, etc. Inspection includes checking specifications, packing, certificates, and physical condition. - Inspection methodology includes material inspection reports, reference document review, identification marking, and rejection process. Sampling is based on vendor qualification and acceptance quality levels. - Responsibilities include the Manager of Stores, Manager of QA&QC, and Site Manager. Tools listed support inspection tasks like measurement. Health and safety

Uploaded by

Umair Awan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
3K views5 pages

Receiving Inspection Work Instruction

This document provides work instructions for receiving inspection of materials and equipment. It outlines the objectives, scope, responsibilities, procedures, tools, health and safety instructions, and related documents for inspection. The key points are: - Materials are classified and inspected depending on their type, such as standard, project specific, tools, etc. Inspection includes checking specifications, packing, certificates, and physical condition. - Inspection methodology includes material inspection reports, reference document review, identification marking, and rejection process. Sampling is based on vendor qualification and acceptance quality levels. - Responsibilities include the Manager of Stores, Manager of QA&QC, and Site Manager. Tools listed support inspection tasks like measurement. Health and safety

Uploaded by

Umair Awan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Work Instruction For Receiving Inspection
  • 4. Abbreviations/Definitions
  • 3. References
  • 1. Objective
  • 5. Responsibilities
  • 2. Scope
  • 6. Procedure
  • 7. Tools and Equipment
  • 8. HSE Instructions
  • 9. Forms

RECEIVING INSPECTION

WORK INSTRUCTION
FOR
RECEIVING INSPECTION

00

Work Instructions for Receiving Inspection

Rev. No.

Date : May 22, 2007


Page : 1 of 5

Details Of Revision

22 May, 2007

Executive
QHSE

Engineer
QHSE

Manager
QHSE

Date

Prepared by

Checked
by

Approved
by

Doc. No. QA&QC/WI-01


Rev.: 00

RECEIVING INSPECTION

1.

OBJECTIVE
To ensure that receiving inspection of material and equipment is carried out at
E.H./BUDs/Projects and receiving stores in conformity with the laid down
specifications.

2.

SCOPE
This Work Instruction covers all incoming material & equipment received from
customer or purchased by E.H../BUDs/Projects.

3.

REFERENCES
The following documents are considered as reference document:

4.

Project specifications
PO/Packing list
Vendor supplied drawings/documents
All applicable codes and standards
MTCs
Indent
Delivery Challan

ABBREVIATIONS/DEFINATIONS
SM
QIP
QA&QC
E&P
WI
PO
MIR
HSE
MTC
IMTE
BD
FRM

5.

Site Manager
Quality Inspection Plan
Quality Assurance & Quality Control
Equipment and Plant
Work Instruction
Purchase Order
Material Inspection Report
Health, Safety & Environment
Material Test Certificate
Inspection, Measuring & Test Equipment
Business Division
Form

RESPONSIBILITIES
MANAGER Stores, MANAGER QA&QC

Date : May 22, 2007


Page : 2 of 5

Doc. No. QA&QC/WI-01


Rev.: 00

RECEIVING INSPECTION

6.

PROCEDURE
6.1

The procured materials are classified as

Standard Items
Project Specific Items
E&P Items
Tools
Fixed Assets
Manufactured Items

a)

Standard Items
Items, which have been approved & accepted by QA&QC/PROC/
User, shall be inspected through indent form (STORE/ FRM-01) at
receiving store.

b)

Project Specific Items


Project specific items can be divided into two groups:

c)

Items supplied from factory by vendor in packed & sealed


carton/container shall be inspected, for integrity of packing,
quantity and actual material inside the packing, at the receiving
stores.

Unpacked/loose material and fabricated material procured from


vendor, shall be inspected at receiving stores.
E&P Items
E&P items for BDs/Projects shall be inspected by respective
MANAGER E&P and MANAGER QA&QC if required.

d)

Tools
IMTE shall be inspected at the receiving stores.

e)

Fixed Assets
The user and QA&QC shall inspect fixed asset items at receiving
stores.

f)

Manufactured Items
Pre-shipment final inspection will be performed for all local
manufactured items at vendor and subcontractors premises.
QA&QC co-coordinator for procurement and testing will perform
this activity and will issue inspection certificate No. QA&QC/FRM34 for all such inspections.

Date : May 22, 2007


Page : 3 of 5

Doc. No. QA&QC/WI-01


Rev.: 00

RECEIVING INSPECTION

6.2

Inspection Methodology
6.2.1

MANAGER Stores shall initiate a material inspection report


(STORE/FRM-08, STORE/FRM-09) for all incoming material arranged
through fresh purchase. For material of inter-site transfer, a
thorough inspection will be carried out both at the consignors end
& at the receiving end.
QA&QC inspector shall inspect the material as per reference documents.
Material and equipment procured shall be inspected inline with following guidelines:
Specifications
Packing condition
Inspection report of the manufacturer (If applicable)
Physical condition
MTC (if required)
6.2.4 Sampling and inspection methodology shall be followed as below:

Date : May 22, 2007


Page : 4 of 5

[Link]

Establish the size of the lot to be inspected.

[Link]

Establish acceptability quality level, which is defined as


the upper limit of the percentage of defects
acceptable

[Link]

Extent of examination based on vendor qualification is


categorized as below:
[Link].1

100% inspection of chosen lot for nonapproved vendor.

[Link].2

Random inspection of chosen lot for


approved vendor, exact status depending
on the decision of MANAGER QA&QC at the
time of inspection of the specific
commodity

[Link].3

Items supplied by customers should be


checked for conforming to project
specifications on random basis. However
the ultimate responsibility for performance
failures will still be of the customer.

6.2.5

QA&QC inspector shall place an identification mark on the


inspected items for segregation and traceability.

6.2.6

Materials, which do not conform to the given specification, shall be


rejected. Incase incoming material is released for urgent
production purposes prior to verification; it shall be positively
identified and recorded on MIR and duly countersigned by SM.

Doc. No. QA&QC/WI-01


Rev.: 00

RECEIVING INSPECTION

6.2.7

Materials, such as crush, sand, bricks, loose earth, POL and cement
etc., are usually procured through Rate Running Contract (RRC)
arrangement. Their samples/sources shall be approved by
BD/Project QA&QC at the beginning of the project. Subsequent
deliveries shall in any case be inspected by site QA&QC regularly.

6.2.9

Inspection of the imported material shall be carried out by the


MANAGER QA&QC/User at the receiving stores.

6.2.10 Procurement shall ensure that all the materials, if rejected, shall
be returned to suppliers at the latters own risk and cost.
6.2.11 Every store shall prepare a vendor-wise quarterly rejection report
of materials procured under fresh purchases and send it to
MANAGER sores (E.H.) for onward transmission to procurement for
assessment of vendor reliability and quality.
7.

TOOLS AND EQUIPMENTS

8.

HSE INSTRUCTIONS
-

9.

Vernier Caliper
Meter Tape
Micrometer
Battery Torch
Welding Gauge
Elcometer

HSE instructions will be carried out under responsibility of MANAGER HSE


for safe and sound receipt of material / equipment.
Keep your environment clean.
No smoking is permitted in the restricted areas.

RELATED DOCUMENTS
STORE/WI-01
STORE/WI-02
STORE/FRM-01
STORE/FRM-08
STORE/FRM-09
PROC/FRM-07
QA&QC/FRM-34
QA&QC/FRM-44
QA&QC/FRM-08

Date : May 22, 2007


Page : 5 of 5

Handling of Material
Handling of Customer Supplied Material
Material Indent Form
Material Inspection Report (Civil)
Material Inspection Report
Purchase Order
Material Inspection Certificate
Request for Inspection and Testing (RIT)
Corrective Action Request (CAR) Form

Doc. No. QA&QC/WI-01


Rev.: 00

You might also like