Al-Ayuni Monthly Statement - Package 02

This monthly statement from the Ministry of Housing in Saudi Arabia provides information on cement concrete upstand curbs constructed in the Al-Kharj site (Package-02) during a given month. It details the quantities of curbs constructed in different zones, including over 93,000 linear meters in Zone A and over 17,000 linear meters in Zone B. The document also includes item measurement sheets providing station-by-station measurements of individual roads within each zone.

Uploaded by

freann
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
255 views35 pages

Al-Ayuni Monthly Statement - Package 02

This monthly statement from the Ministry of Housing in Saudi Arabia provides information on cement concrete upstand curbs constructed in the Al-Kharj site (Package-02) during a given month. It details the quantities of curbs constructed in different zones, including over 93,000 linear meters in Zone A and over 17,000 linear meters in Zone B. The document also includes item measurement sheets providing station-by-station measurements of individual roads within each zone.

Uploaded by

freann
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

KINGDOM OF SAUDI ARABIA

MINISTRY OF HOUSING
AL-KHARJ SITE (PACKAGE-02)

MONTHLY STATEMENT NO.00

Employer:

MINISTRY OF HOUSING (MOH)

Consultant:

SAUDI ARABIAN PARSONS LTD. (SAPL)

Contractor:

AL-AYUNI INVESTMENT & CONTRACTING CO.

Apply on:

Month: XXXX, 2014

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02
Employer:
Consultants:
Contractor:

MINISTRY OF HOUSING (MOH)


SAUDI ARABIAN PARSONS LTD. (SAPL)
AL-AYUNI INVESTMENT & CONTRACTING CO.

Month: XXXX, 2014

ITEM SUMMARY SHEET

Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete upstand Curb
Item No.:
15/3/1/1
Sub-Bill No.

Description

Unit

BOQ Estimated
(Quantity)

Upto Date
(Quantity)

Previous Month
(Quantity)

This Month
(Quantity)

7=5-6

ROADS AND HIGHWAYS


(i)
15/3/1/1

Division 15 - SIDE WALKS, CURBS.


Cement Concrete upstand curbs (150x305mm)
Zone -A (Roads)

LM

30,351.27

30,351.27

30,351.27

Zone -B (Roads)

LM

17,648.95

17,648.95

17,648.95

Zone -C (Roads)

LM

18,714.35

18,714.35

18,714.35

Zone -D (Roads)

LM

12,703.68

12,703.68

12,703.68

Zone -CR-05, 06 & 07 (Roads)

LM

14,121.34

14,121.34

14,121.34

Total Carried Forward to Grand Summary

LM

93,539.59

93,539.59

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

93,539.59

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete upstand Curb
Item No.:
15/3/1/1 (Zone A)
Sr.
No.
1

Description

Station

Distance

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

Unit

From

To

Road - A01

Lm

1+000.000

1+772.759

772.759

735.36

861.88

1,597.240

Road - A02

Lm

2+000.000

2+068.000

68.000

59.19

59.31

118.500

Road - A03

Lm

3+000.000

3+600.513

600.513

558.37

581.96

1,140.330

Road - A04

Lm

4+000.000

4+383.293

383.293

360.77

347.95

708.720

Road - A05

Lm

5+000.000

5+315.292

315.292

116.10

127.93

244.030

Road - A06

Lm

6+000.000

6+130.140

130.140

121.10

121.10

242.200

Road - A07

Lm

7+000.000

7+068.140

68.140

59.40

59.40

118.800

Road - A08

Lm

8+000.000

8+188.292

188.292

171.41

121.23

292.640

Road - A09

Lm

9+000.000

9+531.062

531.062

552.60

537.09

1,089.680

Road - A10

Lm

10+000.000 10+198.567

198.567

179.00

191.61

370.610

Road - A11

Lm

11+000.000 11+243.325

243.325

216.25

238.05

454.300

Road - A12

Lm

12+000.000 12+130.373

130.373

121.50

121.50

243.000

Road - A13

Lm

13+000.000 13+522.090

522.090

477.57

485.56

963.130

Road - A14

Lm

14+000.000 14+318.199

318.199

292.60

300.11

592.710

Road - A15

Lm

15+000.000 15+232.689

232.689

278.07

278.15

556.220

Road - A16

Lm

16+000.000 16+797.749

797.749

742.09

876.87

1,618.960

Road - A17

Lm

17+000.000 17+192.896

192.896

172.26

176.95

349.210

Road - A18

Lm

18+000.000 18+405.599

405.599

608.96

414.10

1,023.060

Road - A19

Lm

19+000.000 19+220.291

220.291

206.40

201.35

407.750

Road - A20

Lm

20+000.000 20+138.562

138.562

130.11

127.28

257.390

Road - A21

Lm

21+000.000 21+325.586

325.586

294.52

309.84

604.360

Road - A22

Lm

22+000.000 22+135.000

135.000

113.49

126.71

240.200

Road - A23

Lm

23+000.000 23+642.652

642.652

598.00

609.47

1,207.470

Road - A24

Lm

24+000.000 24+651.293

651.293

604.84

625.37

1,230.210

Road - A25

Lm

25+000.000 25+070.000

70.000

61.50

61.50

123.000

Road - A26

Lm

26+000.000 26+138.000

138.000

129.15

120.18

249.330

Road - A27

Lm

27+000.000 27+176.478

176.478

167.88

167.66

335.540

Road - A28

Lm

28+000.000 28+313.778

313.778

287.10

287.58

574.680

Road - A29

Lm

29+000.000 29+268.245

268.245

258.85

271.45

530.300

Road - A30

Lm

30+000.000 30+201.191

201.191

192.61

192.25

384.860

Road - A31

Lm

31+000.000 31+429.386

429.386

393.52

411.67

805.190

Road - A32

Lm

32+000.000 32+135.000

135.000

128.28

116.22

244.500

Road - A33

Lm

33+000.000 33+237.399

237.399

208.66

187.38

396.040

Road - A34

Lm

34+000.000 34+692.989

692.989

818.25

646.94

1,465.190

Road - A35

Lm

35+000.000 35+196.323

196.323

190.10

184.62

374.720

Road - A36

Lm

36+000.000 36+255.005

255.005

238.11

238.25

476.360

Road - A37

Lm

37+000.000 37+287.252

287.252

276.50

271.81

548.310

Road - A38

Lm

38+000.000 38+220.325

220.325

250.00

239.95

489.950

Road - A39

Lm

39+000.000 39+133.000

133.000

115.80

125.53

241.330

Road - A40

Lm

40+000.000 40+795.559

795.559

1,090.63

799.70

1,890.331

6 = (5 - 4)

SECTOR - A (Part)

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete upstand Curb
Item No.:
15/3/1/1 (Zone A)
Sr.
No.
1

Description

Station

Unit

From

To

Distance

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

Road - A41

Lm

41+000.000 41+439.730

439.730

419.37

389.83

809.200

Road - A42

Lm

42+000.000 42+691.935

691.935

613.37

731.74

1,345.110

Road - A43

Lm

43+000.000 43+283.145

283.145

275.85

271.51

547.360

Road - A44

Lm

44+000.000 44+145.944

145.944

136.00

136.55

272.550

Road - A45

Lm

45+000.000 45+070.099

70.099

61.50

59.70

121.200

Road - A46

Lm

46+000.000 46+263.367

263.367

246.50

247.50

494.000

Road - A47

Lm

47+000.000 47+213.557

213.557

197.90

194.75

392.650

Road - A48

Lm

48+000.000 48+440.060

440.060

410.76

562.97

973.730

Total upto date Quantity (LM) Added 2% for Safety

6 = (5 - 4)

30,351.274

Previously Certified. (LM)

This Month Quantity (LM)

30,351.274

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete upstand Curb
Item No.:
15/3/1/1 (Zone B)
Sr.
No.
1

Description

Station

Distance

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

Unit

From

To

Road - B01

Lm

1+000.000

1+352.041

352.041

316.89

302.48

619.370

Road - B02

Lm

2+000.000

2+281.651

281.651

253.73

252.59

506.320

Road - B03

Lm

3+000.000

3+355.074

355.074

321.36

343.45

664.810

Road - B04

Lm

4+000.000

4+653.733

653.733

926.50

861.93

1,788.430

Road - B05

Lm

5+000.000

5+392.631

392.631

475.58

384.07

859.650

Road - B06

Lm

6+000.000

6+739.291

739.291

764.78

863.84

1,628.620

Road - B07

Lm

7+000.000

7+066.500

66.500

57.88

56.70

114.580

Road - B08

Lm

8+000.000

8+070.026

70.026

60.57

62.91

123.480

Road - B09

Lm

9+000.000

9+627.303

627.303

589.94

572.46

1,162.400

Road - B10

Lm

10+000.000 10+249.147

249.147

233.14

232.32

465.460

Road - B11

Lm

11+000.000 11+162.788

162.788

155.50

142.74

298.240

Road - B12

Lm

12+000.000 12+272.752

272.752

381.80

244.94

626.740

Road - B13

Lm

13+000.000 13+490.057

490.057

448.33

462.80

911.130

Road - B14

Lm

14+000.000 14+561.871

561.871

632.15

523.82

1,155.970

Road - B15

Lm

15+000.000 15+470.307

470.307

546.80

521.15

1,067.950

Road - B16

Lm

16+000.000 16+338.323

338.323

331.20

312.82

644.020

Road - B17

Lm

17+000.000 17+121.409

121.409

112.80

112.80

225.600

Road - B18

Lm

18+000.000 18+121.365

121.365

112.80

112.80

225.600

Road - B19

Lm

19+000.000 19+298.181

298.181

274.50

274.05

548.550

Road - B20

Lm

20+000.000 20+555.081

555.081

841.53

481.45

1,322.980

Road - B21

Lm

21+000.000 21+140.361

140.361

128.80

133.38

262.180

Road - B22

Lm

22+000.000 22+245.628

245.628

231.58

229.18

460.760

Road - B23

Lm

23+000.000 23+570.395

570.395

653.25

535.47

1,188.720

Road - B24

Lm

24+000.000 24+190.682

190.682

207.39

223.94

431.330

6 = (5 - 4)

SECTOR - B (Part)

Total upto date Quantity (LM) Added 2% for Safety

17,648.948

Previously Certified. (LM)

This Month Quantity (LM)

17,648.948

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete upstand Curb
Item No.:
15/3/1/1 (Zone C)
Sr.
No.
1

Description

Station

Distance

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

Unit

From

To

Road - C01

Lm

1+000.000

1+625.000

625.000

587.90

839.56

1,427.460

Road - C02

Lm

2+000.000

2+896.889

896.889

896.00

794.36

1,690.360

Road - C03

Lm

3+000.000

3+300.854

300.854

378.00

378.00

756.000

Road - C04

Lm

4+000.000

4+133.000

133.000

137.37

115.48

252.850

Road - C05

Lm

5+000.000

5+135.000

135.000

126.24

126.24

252.480

Road - C06

Lm

6+000.000

6+440.724

440.724

416.29

415.87

832.160

Road - C07

Lm

7+000.000

7+068.500

68.500

59.45

59.45

118.900

Road - C08

Lm

8+000.000

8+135.000

135.000

117.44

127.90

245.340

Road - C09

Lm

9+000.000

9+496.690

496.690

465.68

454.55

920.230

Road - C10

Lm

10+000.000 10+373.875

373.875

361.90

247.25

609.150

Road - C11

Lm

11+000.000 11+271.000

271.000

255.62

255.62

511.240

Road - C12

Lm

12+000.000 12+198.000

198.000

171.72

192.85

364.570

Road - C13

Lm

13+000.000 13+135.000

135.000

126.40

126.40

252.800

Road - C14

Lm

14+000.000 14+203.000

203.000

212.24

236.00

448.240

Road - C15

Lm

15+000.000 15+133.000

133.000

126.24

115.80

242.040

Road - C16

Lm

16+000.000 16+859.169

859.169

800.16

1,050.81

1,850.970

Road - C17

Lm

17+000.000 17+109.057

109.057

105.00

105.00

210.000

Road - C18

Lm

18+000.000 18+558.679

558.679

502.89

562.50

1,065.390

Road - C19

Lm

19+000.000 19+120.000

120.000

123.00

123.00

246.000

Road - C20

Lm

20+000.000 20+120.000

120.000

123.00

123.00

246.000

Road - C21

Lm

21+000.000 21+258.000

258.000

245.77

233.50

479.270

Road - C22

Lm

22+000.000 22+336.000

336.000

319.05

320.57

639.620

Road - C23

Lm

23+000.000 23+138.000

138.000

120.61

131.20

251.810

Road - C24

Lm

24+000.000 24+091.049

91.049

91.08

91.08

182.150

Road - C25

Lm

25+000.000 25+404.592

404.592

609.15

373.65

982.800

Road - C26

Lm

26+000.000 26+881.661

881.661

1,286.44

827.65

2,114.094

Road - C27

Lm

27+000.000 27+070.000

70.000

61.60

59.50

121.100

Road - C28

Lm

28+000.000 28+133.000

133.000

132.80

115.80

248.600

Road - C29

Lm

29+000.000 29+215.767

215.767

257.10

257.10

514.200

Road - C30

Lm

30+000.000 30+151.033

151.033

135.13

136.45

271.580

6 = (5 - 4)

SECTOR - C (Part)

Total upto date Quantity (LM) Added 2% for Safety

18,714.352

Previously Certified. (LM)

This Month Quantity (LM)

18,714.352

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete upstand Curb
Item No.:
15/3/1/1 (Zone D)
Sr.
No.
1

Description

Station

Distance

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

Unit

From

To

Road - D01

Lm

1+000.000

1+477.073

477.073

424.27

430.91

855.180

Road - D02

Lm

2+000.000

2+782.708

782.708

861.99

722.40

1,584.390

Road - D03

Lm

3+000.000

3+187.305

187.305

176.00

174.58

350.580

Road - D04

Lm

4+000.000

4+169.012

169.012

153.46

155.73

309.190

Road - D05

Lm

5+000.000

5+118.864

118.864

105.97

106.16

212.130

Road - D06

Lm

6+000.000

6+776.032

776.032

705.27

776.00

1,481.270

Road - D07

Lm

7+000.000

7+150.954

150.954

133.71

135.82

269.530

Road - D08

Lm

8+000.000

8+126.151

126.151

117.42

115.30

232.720

Road - D09

Lm

9+000.000

9+198.000

198.000

193.05

172.07

365.120

Road - D10

Lm

10+000.000 10+425.507

425.507

547.15

400.01

947.160

Road - D11

Lm

11+000.000 11+234.491

234.491

214.45

222.04

436.490

Road - D12

Lm

12+000.000 12+263.000

263.000

245.82

256.55

502.370

Road - D13

Lm

13+000.000 13+170.757

170.757

195.41

201.90

397.310

Road - D14

Lm

14+000.000 14+178.377

178.377

215.22

203.71

418.930

Road - D15

Lm

15+000.000 15+185.998

185.998

216.98

223.53

440.510

Road - D16

Lm

16+000.000 16+381.801

381.801

367.21

355.07

722.280

Road - D17

Lm

17+000.000 18+046.960

1,046.960

1,020.18

1,198.00

2,218.180

Road - D18

Lm

18+000.000 18+263.000

263.000

259.85

228.60

488.450

Road - D19

Lm

19+000.000 19+120.000

120.000

111.40

111.40

222.800

6 = (5 - 4)

SECTOR - D (Part)

Total upto date Quantity (LM) Added 2% for Safety

12,703.682

Previously Certified. (LM)

This Month Quantity (LM)

12,703.682

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete upstand Curb
Item No.:
15/3/1/1 (CR-05, 06 & 07)
Sr.
No.
1

Description
2

Station

Distance

Unit

From

To

6 = (5 - 4)

Lm

5+225.000

7+096.438

1,871.438

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

CR-05, 06 & 07
Road - CR-05
Road Median Portion

Lm

692.28

694.36

1,386.640

676.12

679.36

1,355.480

1,820.10

1,442.26

3,262.360

3,559.74

3,559.740

Road - CR-06
Road Median Portion

Lm

6+000.000

6+732.791

732.791

Lm
-

Road - CR-07
Road Median Portion

Lm

7+000.000

7+924.283

924.283

Both Side

865.79

Lm

858.90

1,724.690

1,775.64

1,775.640

Both Side

Other's

Lm

Total upto date Quantity (LM) Added 2% for Safety

270.00

270.000

Median

445.40

445.400

Median

64.50

64.500

Median

14,121.339

Previously Certified. (LM)

This Month Quantity (LM)

14,121.339

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02
Employer:
Consultants:
Contractor:

MINISTRY OF HOUSING (MOH)


SAUDI ARABIAN PARSONS LTD. (SAPL)
AL-AYUNI INVESTMENT & CONTRACTING CO.

Month: XXXX, 2014

ITEM SUMMARY SHEET

Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete drop curbs 305 x 150mm
Item No.:
15/3/1/2
Sub-Bill No.

Description

Unit

BOQ Estimated
(Quantity)

Upto Date
(Quantity)

Previous Month
(Quantity)

This Month
(Quantity)

7=5-6

ROADS AND HIGHWAYS


(i)
15/3/1/2

Division 15 - SIDE WALKS, CURBS.


Cement Concrete drop curbs (305 x 150mm)
Zone -A (Roads)

Sqm

538.60

538.60

538.60

Zone -B (Roads)

Sqm

730.80

730.80

730.80

Zone -C (Roads)

Sqm

545.40

545.40

545.40

Zone -D (Roads)

Sqm

668.60

668.60

668.60

Zone -CR-05, 06 & 07 (Roads)

Sqm

Total Carried Forward to Grand Summary

Sqm

2,483.40

2,483.40

2,731.74

2,731.74

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

2,483.40
2,731.74

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete drop curbs 305 x 150mm
Item No.:
15/3/1/2 (Zone A)
Sr.
No.
1

Description

Station

Distance

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

Unit

From

To

Road - A01

Lm

1+000.000

1+772.759

772.759

Road - A02

Lm

2+000.000

2+068.000

68.000

Road - A03

Lm

3+000.000

3+600.513

600.513

Road - A04

Lm

4+000.000

4+383.293

383.293

Road - A05

Lm

5+000.000

5+315.292

315.292

Road - A06

Lm

6+000.000

6+130.140

130.140

Road - A07

Lm

7+000.000

7+068.140

68.140

Road - A08

Lm

8+000.000

8+188.292

188.292

Road - A09

Lm

9+000.000

9+531.062

531.062

Road - A10

Lm

10+000.000 10+198.567

198.567

Road - A11

Lm

11+000.000 11+243.325

243.325

Road - A12

Lm

12+000.000 12+130.373

130.373

Road - A13

Lm

13+000.000 13+522.090

522.090

Road - A14

Lm

14+000.000 14+318.199

318.199

Road - A15

Lm

15+000.000 15+232.689

232.689

Road - A16

Lm

16+000.000 16+797.749

797.749

Road - A17

Lm

17+000.000 17+192.896

192.896

Road - A18

Lm

18+000.000 18+405.599

405.599

Road - A19

Lm

19+000.000 19+220.291

220.291

Road - A20

Lm

20+000.000 20+138.562

138.562

Road - A21

Lm

21+000.000 21+325.586

325.586

Road - A22

Lm

22+000.000 22+135.000

135.000

Road - A23

Lm

23+000.000 23+642.652

642.652

Road - A24

Lm

24+000.000 24+651.293

651.293

Road - A25

Lm

25+000.000 25+070.000

70.000

Road - A26

Lm

26+000.000 26+138.000

138.000

Road - A27

Lm

27+000.000 27+176.478

176.478

Road - A28

Lm

28+000.000 28+313.778

313.778

Road - A29

Lm

29+000.000 29+268.245

268.245

Road - A30

Lm

30+000.000 30+201.191

201.191

Road - A31

Lm

31+000.000 31+429.386

429.386

Road - A32

Lm

32+000.000 32+135.000

135.000

Road - A33

Lm

33+000.000 33+237.399

237.399

Road - A34

Lm

34+000.000 34+692.989

692.989

Road - A35

Lm

35+000.000 35+196.323

196.323

Road - A36

Lm

36+000.000 36+255.005

255.005

Road - A37

Lm

37+000.000 37+287.252

287.252

Road - A38

Lm

38+000.000 38+220.325

220.325

Road - A39

Lm

39+000.000 39+133.000

133.000

Road - A40

Lm

40+000.000 40+795.559

795.559

6 = (5 - 4)

SECTOR - A (Part)

65.80

143.40

60.00

71.40

125.800

214.800

45.00

54.00

99.000
-

33.00

66.00

99.000

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete drop curbs 305 x 150mm
Item No.:
15/3/1/2 (Zone A)
Sr.
No.
1

Description

Station

Unit

From

To

Distance

Quantit (LM)
RS

LS

Total
Quantity

9 = (7 + 8)

Remarks

Road - A41

Lm

41+000.000 41+439.730

439.730

Road - A42

Lm

42+000.000 42+691.935

691.935

Road - A43

Lm

43+000.000 43+283.145

283.145

Road - A44

Lm

44+000.000 44+145.944

145.944

Road - A45

Lm

45+000.000 45+070.099

70.099

Road - A46

Lm

46+000.000 46+263.367

263.367

Road - A47

Lm

47+000.000 47+213.557

213.557

Road - A48

Lm

48+000.000 48+440.060

440.060

Total upto date Quantity (LM)

6 = (5 - 4)

10

538.600

Previously Certified. (LM)

This Month Quantity (LM)

538.600

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete drop curbs 305 x 150mm
Item No.:
15/3/1/2 (Zone B)
Sr.
No.
1

Description

Station

Distance

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

Unit

From

To

Road - B01

Lm

1+000.000

1+352.041

352.041

Road - B02

Lm

2+000.000

2+281.651

281.651

Road - B03

Lm

3+000.000

3+355.074

355.074

Road - B04

Lm

4+000.000

4+653.733

653.733

102.00

80.40

182.400

Road - B05

Lm

5+000.000

5+392.631

392.631

151.40

47.40

198.800

Road - B06

Lm

6+000.000

6+739.291

739.291

Road - B07

Lm

7+000.000

7+066.500

66.500

Road - B08

Lm

8+000.000

8+070.026

70.026

Road - B09

Lm

9+000.000

9+627.303

627.303

Road - B10

Lm

10+000.000 10+249.147

249.147

Road - B11

Lm

11+000.000 11+162.788

162.788

Road - B12

Lm

12+000.000 12+272.752

272.752

Road - B13

Lm

13+000.000 13+490.057

490.057

Road - B14

Lm

14+000.000 14+561.871

561.871

Road - B15

Lm

15+000.000 15+470.307

470.307

Road - B16

Lm

16+000.000 16+338.323

338.323

Road - B17

Lm

17+000.000 17+121.409

121.409

Road - B18

Lm

18+000.000 18+121.365

121.365

Road - B19

Lm

19+000.000 19+298.181

298.181

Road - B20

Lm

20+000.000 20+555.081

555.081

Road - B21

Lm

21+000.000 21+140.361

140.361

Road - B22

Lm

22+000.000 22+245.628

245.628

Road - B23

Lm

23+000.000 23+570.395

570.395

Road - B24

Lm

24+000.000 24+190.682

190.682

6 = (5 - 4)

SECTOR - B (Part)

Total upto date Quantity (LM)

15.00

104.60

119.40

15.000

224.000

56.80

53.80

110.600

730.800

Previously Certified. (LM)

This Month Quantity (LM)

730.800

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete drop curbs 305 x 150mm
Item No.:
15/3/1/2 (Zone C)
Sr.
No.
1

Station

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

896.889

65.20

59.40

124.600

3+300.854

300.854

95.80

95.80

191.600

4+133.000

133.000

5+000.000

5+135.000

135.000

Lm

6+000.000

6+440.724

440.724

Road - C07

Lm

7+000.000

7+068.500

68.500

Road - C08

Lm

8+000.000

8+135.000

135.000

Road - C09

Lm

9+000.000

9+496.690

496.690

Road - C10

Lm

10+000.000 10+373.875

373.875

Road - C11

Lm

11+000.000 11+271.000

271.000

Road - C12

Lm

12+000.000 12+198.000

198.000

Road - C13

Lm

13+000.000 13+135.000

135.000

Road - C14

Lm

14+000.000 14+203.000

203.000

Road - C15

Lm

15+000.000 15+133.000

133.000

Road - C16

Lm

16+000.000 16+859.169

859.169

Road - C17

Lm

17+000.000 17+109.057

109.057

Road - C18

Lm

18+000.000 18+558.679

558.679

Road - C19

Lm

19+000.000 19+120.000

120.000

15.00

15.00

30.000

Road - C20

Lm

20+000.000 20+120.000

120.000

15.00

15.00

30.000

Road - C21

Lm

21+000.000 21+258.000

258.000

Road - C22

Lm

22+000.000 22+336.000

336.000

Road - C23

Lm

23+000.000 23+138.000

138.000

Road - C24

Lm

24+000.000 24+091.049

91.049

Road - C25

Lm

25+000.000 25+404.592

404.592

Road - C26

Lm

26+000.000 26+881.661

881.661

Road - C27

Lm

27+000.000 27+070.000

70.000

Road - C28

Lm

28+000.000 28+133.000

133.000

Road - C29

Lm

29+000.000 29+215.767

215.767

Road - C30

Lm

30+000.000 30+151.033

151.033

Description

Distance

Unit

From

To

Road - C01

Lm

1+000.000

1+625.000

625.000

Road - C02

Lm

2+000.000

2+896.889

Road - C03

Lm

3+000.000

Road - C04

Lm

4+000.000

Road - C05

Lm

Road - C06

6 = (5 - 4)

SECTOR - C (Part)

Total upto date Quantity (LM)

50.40

35.40

85.800

32.80

50.60

83.400

545.400

Previously Certified. (LM)

This Month Quantity (LM)

545.400

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete upstand Curb
Item No.:
15/3/1/2 (Zone D)
Sr.
No.
1

Description

Station

Distance

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

Unit

From

To

Road - D01

Lm

1+000.000

1+477.073

477.073

Road - D02

Lm

2+000.000

2+782.708

782.708

Road - D03

Lm

3+000.000

3+187.305

187.305

Road - D04

Lm

4+000.000

4+169.012

169.012

20.80

Road - D05

Lm

5+000.000

5+118.864

118.864

35.80

Road - D06

Lm

6+000.000

6+776.032

776.032

Road - D07

Lm

7+000.000

7+150.954

150.954

Road - D08

Lm

8+000.000

8+126.151

126.151

Road - D09

Lm

9+000.000

9+198.000

198.000

Road - D10

Lm

10+000.000 10+425.507

425.507

Road - D11

Lm

11+000.000 11+234.491

234.491

Road - D12

Lm

12+000.000 12+263.000

263.000

Road - D13

Lm

13+000.000 13+170.757

170.757

41.80

45.00

86.800

Road - D14

Lm

14+000.000 14+178.377

178.377

50.80

42.00

92.800

Road - D15

Lm

15+000.000 15+185.998

185.998

47.80

51.00

98.800

Road - D16

Lm

16+000.000 16+381.801

381.801

Road - D17

Lm

17+000.000 18+046.960

1,046.960

113.80

128.60

242.400

Road - D18

Lm

18+000.000 18+263.000

263.000

Road - D19

Lm

19+000.000 19+120.000

120.000

6 = (5 - 4)

SECTOR - D (Part)

Total upto date Quantity (LM)

41.20

62.000
35.800
-

14.80

35.20

50.000

668.600

Previously Certified. (LM)

This Month Quantity (LM)

668.600

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02
Employer:
Consultants:
Contractor:

MINISTRY OF HOUSING (MOH)


SAUDI ARABIAN PARSONS LTD. (SAPL)
AL-AYUNI INVESTMENT & CONTRACTING CO.

Month: XXXX, 2014

ITEM SUMMARY SHEET

Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Curbs Paint
Item No.:
15/3/2
Sub-Bill No.

Description

Unit

BOQ Estimated
(Quantity)

Upto Date
(Quantity)

Previous Month
(Quantity)

This Month
(Quantity)

7=5-6

ROADS AND HIGHWAYS


(i)
15/3/2

Division 15 - SIDE WALKS, CURBS.


Curbs Paint
Zone -A (Roads)

LM

30,351.27

30,351.27

30,351.27

Zone -B (Roads)

LM

17,648.95

17,648.95

17,648.95

Zone -C (Roads)

LM

18,714.35

18,714.35

18,714.35

Zone -D (Roads)

LM

12,703.68

12,703.68

12,703.68

Zone -CR-05, 06 & 07 (Roads)

LM

14,121.34

14,121.34

14,121.34

Total Carried Forward to Grand Summary

LM

93,539.59

93,539.59

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

93,539.59

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Curbs Paint
Item No.:
15/3/2 (Zone A)
Sr.
No.
1

Description

Station

Distance

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

Unit

From

To

Road - A01

Lm

1+000.000

1+772.759

772.759

735.36

861.88

1,597.240

Road - A02

Lm

2+000.000

2+068.000

68.000

59.19

59.31

118.500

Road - A03

Lm

3+000.000

3+600.513

600.513

558.37

581.96

1,140.330

Road - A04

Lm

4+000.000

4+383.293

383.293

360.77

347.95

708.720

Road - A05

Lm

5+000.000

5+315.292

315.292

116.10

127.93

244.030

Road - A06

Lm

6+000.000

6+130.140

130.140

121.10

121.10

242.200

Road - A07

Lm

7+000.000

7+068.140

68.140

59.40

59.40

118.800

Road - A08

Lm

8+000.000

8+188.292

188.292

171.41

121.23

292.640

Road - A09

Lm

9+000.000

9+531.062

531.062

552.60

537.09

1,089.680

Road - A10

Lm

10+000.000 10+198.567

198.567

179.00

191.61

370.610

Road - A11

Lm

11+000.000 11+243.325

243.325

216.25

238.05

454.300

Road - A12

Lm

12+000.000 12+130.373

130.373

121.50

121.50

243.000

Road - A13

Lm

13+000.000 13+522.090

522.090

477.57

485.56

963.130

Road - A14

Lm

14+000.000 14+318.199

318.199

292.60

300.11

592.710

Road - A15

Lm

15+000.000 15+232.689

232.689

278.07

278.15

556.220

Road - A16

Lm

16+000.000 16+797.749

797.749

742.09

876.87

1,618.960

Road - A17

Lm

17+000.000 17+192.896

192.896

172.26

176.95

349.210

Road - A18

Lm

18+000.000 18+405.599

405.599

608.96

414.10

1,023.060

Road - A19

Lm

19+000.000 19+220.291

220.291

206.40

201.35

407.750

Road - A20

Lm

20+000.000 20+138.562

138.562

130.11

127.28

257.390

Road - A21

Lm

21+000.000 21+325.586

325.586

294.52

309.84

604.360

Road - A22

Lm

22+000.000 22+135.000

135.000

113.49

126.71

240.200

Road - A23

Lm

23+000.000 23+642.652

642.652

598.00

609.47

1,207.470

Road - A24

Lm

24+000.000 24+651.293

651.293

604.84

625.37

1,230.210

Road - A25

Lm

25+000.000 25+070.000

70.000

61.50

61.50

123.000

Road - A26

Lm

26+000.000 26+138.000

138.000

129.15

120.18

249.330

Road - A27

Lm

27+000.000 27+176.478

176.478

167.88

167.66

335.540

Road - A28

Lm

28+000.000 28+313.778

313.778

287.10

287.58

574.680

Road - A29

Lm

29+000.000 29+268.245

268.245

258.85

271.45

530.300

Road - A30

Lm

30+000.000 30+201.191

201.191

192.61

192.25

384.860

Road - A31

Lm

31+000.000 31+429.386

429.386

393.52

411.67

805.190

Road - A32

Lm

32+000.000 32+135.000

135.000

128.28

116.22

244.500

Road - A33

Lm

33+000.000 33+237.399

237.399

208.66

187.38

396.040

Road - A34

Lm

34+000.000 34+692.989

692.989

818.25

646.94

1,465.190

Road - A35

Lm

35+000.000 35+196.323

196.323

190.10

184.62

374.720

Road - A36

Lm

36+000.000 36+255.005

255.005

238.11

238.25

476.360

Road - A37

Lm

37+000.000 37+287.252

287.252

276.50

271.81

548.310

Road - A38

Lm

38+000.000 38+220.325

220.325

250.00

239.95

489.950

Road - A39

Lm

39+000.000 39+133.000

133.000

115.80

125.53

241.330

Road - A40

Lm

40+000.000 40+795.559

795.559

1,090.63

799.70

1,890.331

6 = (5 - 4)

SECTOR - A (Part)

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Curbs Paint
Item No.:
15/3/2 (Zone A)
Sr.
No.
1

Description

Station

Unit

From

To

Distance

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

Road - A41

Lm

41+000.000 41+439.730

439.730

419.37

389.83

809.200

Road - A42

Lm

42+000.000 42+691.935

691.935

613.37

731.74

1,345.110

Road - A43

Lm

43+000.000 43+283.145

283.145

275.85

271.51

547.360

Road - A44

Lm

44+000.000 44+145.944

145.944

136.00

136.55

272.550

Road - A45

Lm

45+000.000 45+070.099

70.099

61.50

59.70

121.200

Road - A46

Lm

46+000.000 46+263.367

263.367

246.50

247.50

494.000

Road - A47

Lm

47+000.000 47+213.557

213.557

197.90

194.75

392.650

Road - A48

Lm

48+000.000 48+440.060

440.060

410.76

562.97

973.730

Total upto date Quantity (LM) Added 2% for Safety

6 = (5 - 4)

30,351.274

Previously Certified. (LM)

This Month Quantity (LM)

30,351.274

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Curbs Paint
Item No.:
15/3/2 (Zone B)
Sr.
No.
1

Description

Station

Distance

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

Unit

From

To

Road - B01

Lm

1+000.000

1+352.041

352.041

316.89

302.48

619.370

Road - B02

Lm

2+000.000

2+281.651

281.651

253.73

252.59

506.320

Road - B03

Lm

3+000.000

3+355.074

355.074

321.36

343.45

664.810

Road - B04

Lm

4+000.000

4+653.733

653.733

926.50

861.93

1,788.430

Road - B05

Lm

5+000.000

5+392.631

392.631

475.58

384.07

859.650

Road - B06

Lm

6+000.000

6+739.291

739.291

764.78

863.84

1,628.620

Road - B07

Lm

7+000.000

7+066.500

66.500

57.88

56.70

114.580

Road - B08

Lm

8+000.000

8+070.026

70.026

60.57

62.91

123.480

Road - B09

Lm

9+000.000

9+627.303

627.303

589.94

572.46

1,162.400

Road - B10

Lm

10+000.000 10+249.147

249.147

233.14

232.32

465.460

Road - B11

Lm

11+000.000 11+162.788

162.788

155.50

142.74

298.240

Road - B12

Lm

12+000.000 12+272.752

272.752

381.80

244.94

626.740

Road - B13

Lm

13+000.000 13+490.057

490.057

448.33

462.80

911.130

Road - B14

Lm

14+000.000 14+561.871

561.871

632.15

523.82

1,155.970

Road - B15

Lm

15+000.000 15+470.307

470.307

546.80

521.15

1,067.950

Road - B16

Lm

16+000.000 16+338.323

338.323

331.20

312.82

644.020

Road - B17

Lm

17+000.000 17+121.409

121.409

112.80

112.80

225.600

Road - B18

Lm

18+000.000 18+121.365

121.365

112.80

112.80

225.600

Road - B19

Lm

19+000.000 19+298.181

298.181

274.50

274.05

548.550

Road - B20

Lm

20+000.000 20+555.081

555.081

841.53

481.45

1,322.980

Road - B21

Lm

21+000.000 21+140.361

140.361

128.80

133.38

262.180

Road - B22

Lm

22+000.000 22+245.628

245.628

231.58

229.18

460.760

Road - B23

Lm

23+000.000 23+570.395

570.395

653.25

535.47

1,188.720

Road - B24

Lm

24+000.000 24+190.682

190.682

207.39

223.94

431.330

6 = (5 - 4)

SECTOR - B (Part)

Total upto date Quantity (LM) Added 2% for Safety

17,648.948

Previously Certified. (LM)

This Month Quantity (LM)

17,648.948

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Curbs Paint
Item No.:
15/3/2 (Zone C)
Sr.
No.
1

Description

Station

Distance

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

Unit

From

To

Road - C01

Lm

1+000.000

1+625.000

625.000

587.90

839.56

1,427.460

Road - C02

Lm

2+000.000

2+896.889

896.889

896.00

794.36

1,690.360

Road - C03

Lm

3+000.000

3+300.854

300.854

378.00

378.00

756.000

Road - C04

Lm

4+000.000

4+133.000

133.000

137.37

115.48

252.850

Road - C05

Lm

5+000.000

5+135.000

135.000

126.24

126.24

252.480

Road - C06

Lm

6+000.000

6+440.724

440.724

416.29

415.87

832.160

Road - C07

Lm

7+000.000

7+068.500

68.500

59.45

59.45

118.900

Road - C08

Lm

8+000.000

8+135.000

135.000

117.44

127.90

245.340

Road - C09

Lm

9+000.000

9+496.690

496.690

465.68

454.55

920.230

Road - C10

Lm

10+000.000 10+373.875

373.875

361.90

247.25

609.150

Road - C11

Lm

11+000.000 11+271.000

271.000

255.62

255.62

511.240

Road - C12

Lm

12+000.000 12+198.000

198.000

171.72

192.85

364.570

Road - C13

Lm

13+000.000 13+135.000

135.000

126.40

126.40

252.800

Road - C14

Lm

14+000.000 14+203.000

203.000

212.24

236.00

448.240

Road - C15

Lm

15+000.000 15+133.000

133.000

126.24

115.80

242.040

Road - C16

Lm

16+000.000 16+859.169

859.169

800.16

1,050.81

1,850.970

Road - C17

Lm

17+000.000 17+109.057

109.057

105.00

105.00

210.000

Road - C18

Lm

18+000.000 18+558.679

558.679

502.89

562.50

1,065.390

Road - C19

Lm

19+000.000 19+120.000

120.000

123.00

123.00

246.000

Road - C20

Lm

20+000.000 20+120.000

120.000

123.00

123.00

246.000

Road - C21

Lm

21+000.000 21+258.000

258.000

245.77

233.50

479.270

Road - C22

Lm

22+000.000 22+336.000

336.000

319.05

320.57

639.620

Road - C23

Lm

23+000.000 23+138.000

138.000

120.61

131.20

251.810

Road - C24

Lm

24+000.000 24+091.049

91.049

91.08

91.08

182.150

Road - C25

Lm

25+000.000 25+404.592

404.592

609.15

373.65

982.800

Road - C26

Lm

26+000.000 26+881.661

881.661

1,286.44

827.65

2,114.094

Road - C27

Lm

27+000.000 27+070.000

70.000

61.60

59.50

121.100

Road - C28

Lm

28+000.000 28+133.000

133.000

132.80

115.80

248.600

Road - C29

Lm

29+000.000 29+215.767

215.767

257.10

257.10

514.200

Road - C30

Lm

30+000.000 30+151.033

151.033

135.13

136.45

271.580

6 = (5 - 4)

SECTOR - C (Part)

Total upto date Quantity (LM) Added 2% for Safety

18,714.352

Previously Certified. (LM)

This Month Quantity (LM)

18,714.352

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Curbs Paint
Item No.:
15/3/2 (Zone D)
Sr.
No.
1

Description

Station

Distance

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

Unit

From

To

Road - D01

Lm

1+000.000

1+477.073

477.073

424.27

430.91

855.180

Road - D02

Lm

2+000.000

2+782.708

782.708

861.99

722.40

1,584.390

Road - D03

Lm

3+000.000

3+187.305

187.305

176.00

174.58

350.580

Road - D04

Lm

4+000.000

4+169.012

169.012

153.46

155.73

309.190

Road - D05

Lm

5+000.000

5+118.864

118.864

105.97

106.16

212.130

Road - D06

Lm

6+000.000

6+776.032

776.032

705.27

776.00

1,481.270

Road - D07

Lm

7+000.000

7+150.954

150.954

133.71

135.82

269.530

Road - D08

Lm

8+000.000

8+126.151

126.151

117.42

115.30

232.720

Road - D09

Lm

9+000.000

9+198.000

198.000

193.05

172.07

365.120

Road - D10

Lm

10+000.000 10+425.507

425.507

547.15

400.01

947.160

Road - D11

Lm

11+000.000 11+234.491

234.491

214.45

222.04

436.490

Road - D12

Lm

12+000.000 12+263.000

263.000

245.82

256.55

502.370

Road - D13

Lm

13+000.000 13+170.757

170.757

195.41

201.90

397.310

Road - D14

Lm

14+000.000 14+178.377

178.377

215.22

203.71

418.930

Road - D15

Lm

15+000.000 15+185.998

185.998

216.98

223.53

440.510

Road - D16

Lm

16+000.000 16+381.801

381.801

367.21

355.07

722.280

Road - D17

Lm

17+000.000 18+046.960

1,046.960

1,020.18

1,198.00

2,218.180

Road - D18

Lm

18+000.000 18+263.000

263.000

259.85

228.60

488.450

Road - D19

Lm

19+000.000 19+120.000

120.000

111.40

111.40

222.800

6 = (5 - 4)

SECTOR - D (Part)

Total upto date Quantity (LM) Added 2% for Safety

12,703.682

Previously Certified. (LM)

This Month Quantity (LM)

12,703.682

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Curbs Paint
Item No.:
15/3/2 (CR-05, 06 & 07)
Sr.
No.
1

Description
2

Station

Distance

Unit

From

To

6 = (5 - 4)

Lm

5+225.000

7+096.438

1,871.438

Quantit (LM)
RS

LS

Total
Quantity

Remarks

9 = (7 + 8)

10

CR-05, 06 & 07
Road - CR-05
Road Median Portion

Lm

692.28

694.36

1,386.640

676.12

679.36

1,355.480

1,820.10

1,442.26

3,262.360

3,559.74

3,559.740

Road - CR-06
Road Median Portion

Lm

6+000.000

6+732.791

732.791

Lm
-

Road - CR-07
Road Median Portion

Lm

7+000.000

7+924.283

924.283

Both Side

865.79

Lm

858.90

1,724.690

1,775.64

1,775.640

Both Side

Other's

Lm

Total upto date Quantity (LM) Added 2% for Safety

270.00

270.000

Median

445.40

445.400

Median

64.50

64.500

Median

14,121.339

Previously Certified. (LM)

This Month Quantity (LM)

14,121.339

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02
Employer:
Consultants:
Contractor:

MINISTRY OF HOUSING (MOH)


SAUDI ARABIAN PARSONS LTD. (SAPL)
AL-AYUNI INVESTMENT & CONTRACTING CO.

Month: XXXX, 2014

ITEM SUMMARY SHEET

Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete Flush curbs 225x150mm
Item No.:
15/3/1/3
Sub-Bill No.

Description

Unit

BOQ Estimated
(Quantity)

Upto Date
(Quantity)

Previous Month
(Quantity)

This Month
(Quantity)

7=5-6

ROADS AND HIGHWAYS


(i)
15/3/1/2

Division 15 - SIDE WALKS, CURBS.


Cement Concrete Flush curbs 225x150mm
Zone -A (Roads)

LM

2,534.40

2,534.40

Zone -B (Roads)

LM

1,267.20

1,267.20

Zone -C (Roads)

LM

1,584.00

1,584.00

Zone -D (Roads)

LM

1,003.20

1,003.20

Zone -CR-05, 06 & 07 (Roads)

LM

588.00

588.00

Total Carried Forward to Grand Summary

LM

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

6,976.80

6,976.80

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete Flush curbs 225x150mm
Item No.:
15/3/1/3 (Zone A)
Sr.
No.
1

Description
2

MID Block Crossing

Unit

Sides of
Road

Length

Nos

Total
Quantity

Remarks

6 = (5 - 4)

9 = (7 + 8)

10

SECTOR - A (Part)
Road - A01

Lm

2.000

6.60

4.00

52.800

Road - A02

Lm

2.000

6.60

4.00

52.800

Road - A03

Lm

2.000

6.60

4.00

52.800

Road - A04

Lm

2.000

6.60

4.00

52.800

Road - A05

Lm

2.000

6.60

4.00

52.800

Road - A06

Lm

2.000

6.60

4.00

52.800

Road - A07

Lm

2.000

6.60

4.00

52.800

Road - A08

Lm

2.000

6.60

4.00

52.800

Road - A09

Lm

2.000

6.60

4.00

52.800

Road - A10

Lm

2.000

6.60

4.00

52.800

Road - A11

Lm

2.000

6.60

4.00

52.800

Road - A12

Lm

2.000

6.60

4.00

52.800

Road - A13

Lm

2.000

6.60

4.00

52.800

Road - A14

Lm

2.000

6.60

4.00

52.800

Road - A15

Lm

2.000

6.60

4.00

52.800

Road - A16

Lm

2.000

6.60

4.00

52.800

Road - A17

Lm

2.000

6.60

4.00

52.800

Road - A18

Lm

2.000

6.60

4.00

52.800

Road - A19

Lm

2.000

6.60

4.00

52.800

Road - A20

Lm

2.000

6.60

4.00

52.800

Road - A21

Lm

2.000

6.60

4.00

52.800

Road - A22

Lm

2.000

6.60

4.00

52.800

Road - A23

Lm

2.000

6.60

4.00

52.800

Road - A24

Lm

2.000

6.60

4.00

52.800

Road - A25

Lm

2.000

6.60

4.00

52.800

Road - A26

Lm

2.000

6.60

4.00

52.800

Road - A27

Lm

2.000

6.60

4.00

52.800

Road - A28

Lm

2.000

6.60

4.00

52.800

Road - A29

Lm

2.000

6.60

4.00

52.800

Road - A30

Lm

2.000

6.60

4.00

52.800

Road - A31

Lm

2.000

6.60

4.00

52.800

Road - A32

Lm

2.000

6.60

4.00

52.800

Road - A33

Lm

2.000

6.60

4.00

52.800

Road - A34

Lm

2.000

6.60

4.00

52.800

Road - A35

Lm

2.000

6.60

4.00

52.800

Road - A36

Lm

2.000

6.60

4.00

52.800

Road - A37

Lm

2.000

6.60

4.00

52.800

Road - A38

Lm

2.000

6.60

4.00

52.800

Road - A39

Lm

2.000

6.60

4.00

52.800

Road - A40

Lm

2.000

6.60

4.00

52.800

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete Flush curbs 225x150mm
Item No.:
15/3/1/3 (Zone A)
Sr.
No.
1

Description

MID Block Crossing

Unit

Sides of
Road

Length

Nos

Total
Quantity

Remarks

6 = (5 - 4)

9 = (7 + 8)

10

Road - A41

Lm

2.000

6.60

4.00

52.800

Road - A42

Lm

2.000

6.60

4.00

52.800

Road - A43

Lm

2.000

6.60

4.00

52.800

Road - A44

Lm

2.000

6.60

4.00

52.800

Road - A45

Lm

2.000

6.60

4.00

52.800

Road - A46

Lm

2.000

6.60

4.00

52.800

Road - A47

Lm

2.000

6.60

4.00

52.800

Road - A48

Lm

2.000

6.60

4.00

52.800

Total upto date Quantity (LM)

2,534.400

Previously Certified. (LM)

This Month Quantity (LM)

2,534.400

Reference: CI_RD_777_06_10_001 TO 003

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete Flush curbs 225x150mm
Item No.:
15/3/1/3 (Zone B)
Sr.
No.
1

Description
2

MID Block Crossing

Unit

Sides of
Road

Length

Nos

Total
Quantity

Remarks

6 = (5 - 4)

9 = (7 + 8)

10

SECTOR - B (Part)
Road - B01

Lm

2.000

6.60

4.00

52.800

Road - B02

Lm

2.000

6.60

4.00

52.800

Road - B03

Lm

2.000

6.60

4.00

52.800

Road - B04

Lm

2.000

6.60

4.00

52.800

Road - B05

Lm

2.000

6.60

4.00

52.800

Road - B06

Lm

2.000

6.60

4.00

52.800

Road - B07

Lm

2.000

6.60

4.00

52.800

Road - B08

Lm

2.000

6.60

4.00

52.800

Road - B09

Lm

2.000

6.60

4.00

52.800

Road - B10

Lm

2.000

6.60

4.00

52.800

Road - B11

Lm

2.000

6.60

4.00

52.800

Road - B12

Lm

2.000

6.60

4.00

52.800

Road - B13

Lm

2.000

6.60

4.00

52.800

Road - B14

Lm

2.000

6.60

4.00

52.800

Road - B15

Lm

2.000

6.60

4.00

52.800

Road - B16

Lm

2.000

6.60

4.00

52.800

Road - B17

Lm

2.000

6.60

4.00

52.800

Road - B18

Lm

2.000

6.60

4.00

52.800

Road - B19

Lm

2.000

6.60

4.00

52.800

Road - B20

Lm

2.000

6.60

4.00

52.800

Road - B21

Lm

2.000

6.60

4.00

52.800

Road - B22

Lm

2.000

6.60

4.00

52.800

Road - B23

Lm

2.000

6.60

4.00

52.800

Road - B24

Lm

2.000

6.60

4.00

52.800

Total upto date Quantity (LM)

1,267.200

Previously Certified. (LM)

This Month Quantity (LM)

1,267.200

Reference: CI_RD_777_06_10_001 TO 003

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete Flush curbs 225x150mm
Item No.:
15/3/1/3 (Zone C)
Sr.
No.
1

Description
2

MID Block Crossing

Unit

Sides of
Road

Length

Nos

Total
Quantity

Remarks

6 = (5 - 4)

9 = (7 + 8)

10

SECTOR - C (Part)
Road - C01

Lm

2.000

6.60

4.00

52.800

Road - C02

Lm

2.000

6.60

4.00

52.800

Road - C03

Lm

2.000

6.60

4.00

52.800

Road - C04

Lm

2.000

6.60

4.00

52.800

Road - C05

Lm

2.000

6.60

4.00

52.800

Road - C06

Lm

2.000

6.60

4.00

52.800

Road - C07

Lm

2.000

6.60

4.00

52.800

Road - C08

Lm

2.000

6.60

4.00

52.800

Road - C09

Lm

2.000

6.60

4.00

52.800

Road - C10

Lm

2.000

6.60

4.00

52.800

Road - C11

Lm

2.000

6.60

4.00

52.800

Road - C12

Lm

2.000

6.60

4.00

52.800

Road - C13

Lm

2.000

6.60

4.00

52.800

Road - C14

Lm

2.000

6.60

4.00

52.800

Road - C15

Lm

2.000

6.60

4.00

52.800

Road - C16

Lm

2.000

6.60

4.00

52.800

Road - C17

Lm

2.000

6.60

4.00

52.800

Road - C18

Lm

2.000

6.60

4.00

52.800

Road - C19

Lm

2.000

6.60

4.00

52.800

Road - C20

Lm

2.000

6.60

4.00

52.800

Road - C21

Lm

2.000

6.60

4.00

52.800

Road - C22

Lm

2.000

6.60

4.00

52.800

Road - C23

Lm

2.000

6.60

4.00

52.800

Road - C24

Lm

2.000

6.60

4.00

52.800

Road - C25

Lm

2.000

6.60

4.00

52.800

Road - C26

Lm

2.000

6.60

4.00

52.800

Road - C27

Lm

2.000

6.60

4.00

52.800

Road - C28

Lm

2.000

6.60

4.00

52.800

Road - C29

Lm

2.000

6.60

4.00

52.800

Road - C30

Lm

2.000

6.60

4.00

Total upto date Quantity (LM)

52.800

1,584.000

Previously Certified. (LM)

This Month Quantity (LM)

1,584.000

Reference: CI_RD_777_06_10_001 TO 003

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete Flush curbs 225x150mm
Item No.:
15/3/1/3 (Zone D)
Sr.
No.
1

Description
2

MID Block Crossing

Unit

Sides of
Road

Length

Nos

Total
Quantity

Remarks

6 = (5 - 4)

9 = (7 + 8)

10

SECTOR - D (Part)
Road - D01

Lm

2.000

6.60

4.00

52.800

Road - D02

Lm

2.000

6.60

4.00

52.800

Road - D03

Lm

2.000

6.60

4.00

52.800

Road - D04

Lm

2.000

6.60

4.00

52.800

Road - D05

Lm

2.000

6.60

4.00

52.800

Road - D06

Lm

2.000

6.60

4.00

52.800

Road - D07

Lm

2.000

6.60

4.00

52.800

Road - D08

Lm

2.000

6.60

4.00

52.800

Road - D09

Lm

2.000

6.60

4.00

52.800

Road - D10

Lm

2.000

6.60

4.00

52.800

Road - D11

Lm

2.000

6.60

4.00

52.800

Road - D12

Lm

2.000

6.60

4.00

52.800

Road - D13

Lm

2.000

6.60

4.00

52.800

Road - D14

Lm

2.000

6.60

4.00

52.800

Road - D15

Lm

2.000

6.60

4.00

52.800

Road - D16

Lm

2.000

6.60

4.00

52.800

Road - D17

Lm

2.000

6.60

4.00

52.800

Road - D18

Lm

2.000

6.60

4.00

52.800

Road - D19

Lm

2.000

6.60

4.00

52.800

Total upto date Quantity (LM)

1,003.200

Previously Certified. (LM)

This Month Quantity (LM)

1,003.200

Reference: CI_RD_777_06_10_001 TO 003

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete Flush curbs 225x150mm
Item No.:
15/3/1/3 (CR-05, 06 & 07)
Sr.
No.
1

Description
2

MID Block Crossing

Unit

Sides of
Road

Length

Nos

Total
Quantity

Remarks

6 = (5 - 4)

9 = (7 + 8)

10

CR-05, 06 & 07
Road - CR-05

Lm

4.000

10.50

4.00

168.000

Road - CR-06

Lm

6.000

10.50

4.00

252.000

Road - CR-07

Lm

4.000

10.50

4.00

168.000

Total upto date Quantity (LM)

588.000

Previously Certified. (LM)

This Month Quantity (LM)

588.000

Reference: CI_RD_777_06_10_001 TO 003

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02
Employer:
Consultants:
Contractor:

MINISTRY OF HOUSING (MOH)


SAUDI ARABIAN PARSONS LTD. (SAPL)
AL-AYUNI INVESTMENT & CONTRACTING CO.

Month: XXXX, 2014

ITEM SUMMARY SHEET

Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Paved Block
Item No.:
15/2/1
Sub-Bill No.

Description

Unit

BOQ Estimated
(Quantity)

Upto Date
(Quantity)

Previous Month
(Quantity)

This Month
(Quantity)

7=5-6

ROADS AND HIGHWAYS


(i)
15/2/1

Division 15 - SIDE WALKS, CURBS.


Paved Block
Zone -A (Roads)

Sqm

4,181.76

4,181.76

Zone -B (Roads)

Sqm

2,090.88

2,090.88

Zone -C (Roads)

Sqm

2,613.60

2,613.60

Zone -D (Roads)

Sqm

1,655.28

1,655.28

Zone -CR-05, 06 & 07 (Roads)

Sqm

1,146.60

1,146.60

Total Carried Forward to Grand Summary

Sqm

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

11,688.12

11,688.12

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Paved Block
Item No.:
15/2/1 (Zone A)
Sr.
No.
1

Description
2

Unit

Sides of
Road

MID Block Crossing


Start
(Area)

Med
(Area)

End
(Area)

Total
Quantity

Remarks

8 = (5+6+7)x4

SECTOR - A (Part)
Road - A01

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A02

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A03

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A04

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A05

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A06

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A07

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A08

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A09

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A10

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A11

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A12

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A13

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A14

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A15

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A16

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A17

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A18

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A19

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A20

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A21

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A22

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A23

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A24

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A25

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A26

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A27

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A28

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A29

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A30

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A31

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A32

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A33

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A34

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A35

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A36

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A37

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A38

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A39

Sqm

2.000

11.88

19.80

11.88

87.120

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Paved Block
Item No.:
15/2/1 (Zone A)
Sr.
No.
1

Description

Unit

Sides of
Road
4

MID Block Crossing


Start
(Area)

Med
(Area)

End
(Area)

Total
Quantity

Remarks

8 = (5+6+7)x4

Road - A40

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A41

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A42

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A43

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A44

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A45

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A46

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A47

Sqm

2.000

11.88

19.80

11.88

87.120

Road - A48

Sqm

2.000

11.88

19.80

11.88

87.120

Total upto date Quantity (Sqm)

4,181.760

Previously Certified. (Sqm)

This Month Quantity (Sqm)

4,181.760

Reference: CI_RD_777_06_10_001 TO 003

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Paved Block
Item No.:
15/2/1 (Zone B)
Sr.
No.
1

Description
2

Unit

Sides of
Road

MID Block Crossing


Start
(Area)

Med
(Area)

End
(Area)

Total
Quantity

Remarks

8 = (5+6+7)x4

SECTOR - B (Part)
Road - B01

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B02

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B03

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B04

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B05

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B06

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B07

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B08

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B09

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B10

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B11

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B12

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B13

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B14

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B15

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B16

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B17

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B18

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B19

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B20

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B21

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B22

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B23

Sqm

2.000

11.88

19.80

11.88

87.120

Road - B24

Sqm

2.000

11.88

19.80

11.88

87.120

Total upto date Quantity (Sqm)

2,090.880

Previously Certified. (Sqm)

This Month Quantity (Sqm)

2,090.880

Reference: CI_RD_777_06_10_001 TO 003

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Paved Block
Item No.:
15/2/1 (Zone C)
Sr.
No.
1

Description
2

Unit

Sides of
Road

MID Block Crossing


Start
(Area)

Med
(Area)

End
(Area)

Total
Quantity

Remarks

8 = (5+6+7)x4

SECTOR - C (Part)
Road - C01

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C02

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C03

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C04

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C05

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C06

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C07

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C08

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C09

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C10

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C11

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C12

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C13

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C14

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C15

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C16

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C17

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C18

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C19

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C20

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C21

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C22

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C23

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C24

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C25

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C26

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C27

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C28

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C29

Sqm

2.000

11.88

19.80

11.88

87.120

Road - C30

Sqm

2.000

11.88

19.80

11.88

87.120

Total upto date Quantity (Sqm)

2,613.600

Previously Certified. (Sqm)

This Month Quantity (Sqm)

2,613.600

Reference: CI_RD_777_06_10_001 TO 003

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Paved Block
Item No.:
15/2/1 (Zone D)
Sr.
No.
1

Description
2

Unit

Sides of
Road

MID Block Crossing


Start
(Area)

Med
(Area)

End
(Area)

Total
Quantity

Remarks

8 = (5+6+7)x4

SECTOR - D (Part)
Road - D01

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D02

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D03

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D04

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D05

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D06

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D07

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D08

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D09

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D10

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D11

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D12

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D13

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D14

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D15

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D16

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D17

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D18

Sqm

2.000

11.88

19.80

11.88

87.120

Road - D19

Sqm

2.000

11.88

19.80

11.88

87.120

Total upto date Quantity (Sqm)

1,655.280

Previously Certified. (Sqm)

This Month Quantity (Sqm)

1,655.280

Reference: CI_RD_777_06_10_001 TO 003

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.

Sheet3of23
MONTHLY STATEMENT NO.00

KINGDOM OF SAUDI ARABIA


MINISTRY OF HOUSING AL-KHARJ SITE
PACKAGE-02

Month: XXXX, 2014

Employer: MINISTRY OF HOUSING (MOH)


Consultants: SAUDI ARABIAN PARSONS LTD. (SAPL)
Contractor: AL-AYUNI INVESTMENT & CONTRACTING CO.

ITEM MEASUREMENT SHEET


Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Paved Block
Item No.:
15/2/1 (CR-05, 06 & 07)
Sr.
No.
1

Description
2

Unit

Sides of
Road

MID Block Crossing


Start
(Area)

Med
(Area)

End
(Area)

Total
Quantity

Remarks

8 = (5+6+7)x4

CR-05, 06 & 07
Road - CR-05

Sqm

4.000

18.90

31.50

31.50

327.600

Road - CR-06

Sqm

6.000

18.90

31.50

31.50

491.400

Road - CR-07

Sqm

4.000

18.90

31.50

31.50

327.600

Total upto date Quantity (Sqm)

1,146.600

Previously Certified. (Sqm)

This Month Quantity (Sqm)

1,146.600

Reference: CI_RD_777_06_10_001 TO 003

Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.

Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.