Al-Ayuni Monthly Statement - Package 02
Al-Ayuni Monthly Statement - Package 02
MINISTRY OF HOUSING
AL-KHARJ SITE (PACKAGE-02)
Employer:
Consultant:
Contractor:
Apply on:
Sheet3of23
MONTHLY STATEMENT NO.00
Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete upstand Curb
Item No.:
15/3/1/1
Sub-Bill No.
Description
Unit
BOQ Estimated
(Quantity)
Upto Date
(Quantity)
Previous Month
(Quantity)
This Month
(Quantity)
7=5-6
LM
30,351.27
30,351.27
30,351.27
Zone -B (Roads)
LM
17,648.95
17,648.95
17,648.95
Zone -C (Roads)
LM
18,714.35
18,714.35
18,714.35
Zone -D (Roads)
LM
12,703.68
12,703.68
12,703.68
LM
14,121.34
14,121.34
14,121.34
LM
93,539.59
93,539.59
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
93,539.59
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Station
Distance
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
Unit
From
To
Road - A01
Lm
1+000.000
1+772.759
772.759
735.36
861.88
1,597.240
Road - A02
Lm
2+000.000
2+068.000
68.000
59.19
59.31
118.500
Road - A03
Lm
3+000.000
3+600.513
600.513
558.37
581.96
1,140.330
Road - A04
Lm
4+000.000
4+383.293
383.293
360.77
347.95
708.720
Road - A05
Lm
5+000.000
5+315.292
315.292
116.10
127.93
244.030
Road - A06
Lm
6+000.000
6+130.140
130.140
121.10
121.10
242.200
Road - A07
Lm
7+000.000
7+068.140
68.140
59.40
59.40
118.800
Road - A08
Lm
8+000.000
8+188.292
188.292
171.41
121.23
292.640
Road - A09
Lm
9+000.000
9+531.062
531.062
552.60
537.09
1,089.680
Road - A10
Lm
10+000.000 10+198.567
198.567
179.00
191.61
370.610
Road - A11
Lm
11+000.000 11+243.325
243.325
216.25
238.05
454.300
Road - A12
Lm
12+000.000 12+130.373
130.373
121.50
121.50
243.000
Road - A13
Lm
13+000.000 13+522.090
522.090
477.57
485.56
963.130
Road - A14
Lm
14+000.000 14+318.199
318.199
292.60
300.11
592.710
Road - A15
Lm
15+000.000 15+232.689
232.689
278.07
278.15
556.220
Road - A16
Lm
16+000.000 16+797.749
797.749
742.09
876.87
1,618.960
Road - A17
Lm
17+000.000 17+192.896
192.896
172.26
176.95
349.210
Road - A18
Lm
18+000.000 18+405.599
405.599
608.96
414.10
1,023.060
Road - A19
Lm
19+000.000 19+220.291
220.291
206.40
201.35
407.750
Road - A20
Lm
20+000.000 20+138.562
138.562
130.11
127.28
257.390
Road - A21
Lm
21+000.000 21+325.586
325.586
294.52
309.84
604.360
Road - A22
Lm
22+000.000 22+135.000
135.000
113.49
126.71
240.200
Road - A23
Lm
23+000.000 23+642.652
642.652
598.00
609.47
1,207.470
Road - A24
Lm
24+000.000 24+651.293
651.293
604.84
625.37
1,230.210
Road - A25
Lm
25+000.000 25+070.000
70.000
61.50
61.50
123.000
Road - A26
Lm
26+000.000 26+138.000
138.000
129.15
120.18
249.330
Road - A27
Lm
27+000.000 27+176.478
176.478
167.88
167.66
335.540
Road - A28
Lm
28+000.000 28+313.778
313.778
287.10
287.58
574.680
Road - A29
Lm
29+000.000 29+268.245
268.245
258.85
271.45
530.300
Road - A30
Lm
30+000.000 30+201.191
201.191
192.61
192.25
384.860
Road - A31
Lm
31+000.000 31+429.386
429.386
393.52
411.67
805.190
Road - A32
Lm
32+000.000 32+135.000
135.000
128.28
116.22
244.500
Road - A33
Lm
33+000.000 33+237.399
237.399
208.66
187.38
396.040
Road - A34
Lm
34+000.000 34+692.989
692.989
818.25
646.94
1,465.190
Road - A35
Lm
35+000.000 35+196.323
196.323
190.10
184.62
374.720
Road - A36
Lm
36+000.000 36+255.005
255.005
238.11
238.25
476.360
Road - A37
Lm
37+000.000 37+287.252
287.252
276.50
271.81
548.310
Road - A38
Lm
38+000.000 38+220.325
220.325
250.00
239.95
489.950
Road - A39
Lm
39+000.000 39+133.000
133.000
115.80
125.53
241.330
Road - A40
Lm
40+000.000 40+795.559
795.559
1,090.63
799.70
1,890.331
6 = (5 - 4)
SECTOR - A (Part)
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Station
Unit
From
To
Distance
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
Road - A41
Lm
41+000.000 41+439.730
439.730
419.37
389.83
809.200
Road - A42
Lm
42+000.000 42+691.935
691.935
613.37
731.74
1,345.110
Road - A43
Lm
43+000.000 43+283.145
283.145
275.85
271.51
547.360
Road - A44
Lm
44+000.000 44+145.944
145.944
136.00
136.55
272.550
Road - A45
Lm
45+000.000 45+070.099
70.099
61.50
59.70
121.200
Road - A46
Lm
46+000.000 46+263.367
263.367
246.50
247.50
494.000
Road - A47
Lm
47+000.000 47+213.557
213.557
197.90
194.75
392.650
Road - A48
Lm
48+000.000 48+440.060
440.060
410.76
562.97
973.730
6 = (5 - 4)
30,351.274
30,351.274
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Station
Distance
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
Unit
From
To
Road - B01
Lm
1+000.000
1+352.041
352.041
316.89
302.48
619.370
Road - B02
Lm
2+000.000
2+281.651
281.651
253.73
252.59
506.320
Road - B03
Lm
3+000.000
3+355.074
355.074
321.36
343.45
664.810
Road - B04
Lm
4+000.000
4+653.733
653.733
926.50
861.93
1,788.430
Road - B05
Lm
5+000.000
5+392.631
392.631
475.58
384.07
859.650
Road - B06
Lm
6+000.000
6+739.291
739.291
764.78
863.84
1,628.620
Road - B07
Lm
7+000.000
7+066.500
66.500
57.88
56.70
114.580
Road - B08
Lm
8+000.000
8+070.026
70.026
60.57
62.91
123.480
Road - B09
Lm
9+000.000
9+627.303
627.303
589.94
572.46
1,162.400
Road - B10
Lm
10+000.000 10+249.147
249.147
233.14
232.32
465.460
Road - B11
Lm
11+000.000 11+162.788
162.788
155.50
142.74
298.240
Road - B12
Lm
12+000.000 12+272.752
272.752
381.80
244.94
626.740
Road - B13
Lm
13+000.000 13+490.057
490.057
448.33
462.80
911.130
Road - B14
Lm
14+000.000 14+561.871
561.871
632.15
523.82
1,155.970
Road - B15
Lm
15+000.000 15+470.307
470.307
546.80
521.15
1,067.950
Road - B16
Lm
16+000.000 16+338.323
338.323
331.20
312.82
644.020
Road - B17
Lm
17+000.000 17+121.409
121.409
112.80
112.80
225.600
Road - B18
Lm
18+000.000 18+121.365
121.365
112.80
112.80
225.600
Road - B19
Lm
19+000.000 19+298.181
298.181
274.50
274.05
548.550
Road - B20
Lm
20+000.000 20+555.081
555.081
841.53
481.45
1,322.980
Road - B21
Lm
21+000.000 21+140.361
140.361
128.80
133.38
262.180
Road - B22
Lm
22+000.000 22+245.628
245.628
231.58
229.18
460.760
Road - B23
Lm
23+000.000 23+570.395
570.395
653.25
535.47
1,188.720
Road - B24
Lm
24+000.000 24+190.682
190.682
207.39
223.94
431.330
6 = (5 - 4)
SECTOR - B (Part)
17,648.948
17,648.948
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Station
Distance
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
Unit
From
To
Road - C01
Lm
1+000.000
1+625.000
625.000
587.90
839.56
1,427.460
Road - C02
Lm
2+000.000
2+896.889
896.889
896.00
794.36
1,690.360
Road - C03
Lm
3+000.000
3+300.854
300.854
378.00
378.00
756.000
Road - C04
Lm
4+000.000
4+133.000
133.000
137.37
115.48
252.850
Road - C05
Lm
5+000.000
5+135.000
135.000
126.24
126.24
252.480
Road - C06
Lm
6+000.000
6+440.724
440.724
416.29
415.87
832.160
Road - C07
Lm
7+000.000
7+068.500
68.500
59.45
59.45
118.900
Road - C08
Lm
8+000.000
8+135.000
135.000
117.44
127.90
245.340
Road - C09
Lm
9+000.000
9+496.690
496.690
465.68
454.55
920.230
Road - C10
Lm
10+000.000 10+373.875
373.875
361.90
247.25
609.150
Road - C11
Lm
11+000.000 11+271.000
271.000
255.62
255.62
511.240
Road - C12
Lm
12+000.000 12+198.000
198.000
171.72
192.85
364.570
Road - C13
Lm
13+000.000 13+135.000
135.000
126.40
126.40
252.800
Road - C14
Lm
14+000.000 14+203.000
203.000
212.24
236.00
448.240
Road - C15
Lm
15+000.000 15+133.000
133.000
126.24
115.80
242.040
Road - C16
Lm
16+000.000 16+859.169
859.169
800.16
1,050.81
1,850.970
Road - C17
Lm
17+000.000 17+109.057
109.057
105.00
105.00
210.000
Road - C18
Lm
18+000.000 18+558.679
558.679
502.89
562.50
1,065.390
Road - C19
Lm
19+000.000 19+120.000
120.000
123.00
123.00
246.000
Road - C20
Lm
20+000.000 20+120.000
120.000
123.00
123.00
246.000
Road - C21
Lm
21+000.000 21+258.000
258.000
245.77
233.50
479.270
Road - C22
Lm
22+000.000 22+336.000
336.000
319.05
320.57
639.620
Road - C23
Lm
23+000.000 23+138.000
138.000
120.61
131.20
251.810
Road - C24
Lm
24+000.000 24+091.049
91.049
91.08
91.08
182.150
Road - C25
Lm
25+000.000 25+404.592
404.592
609.15
373.65
982.800
Road - C26
Lm
26+000.000 26+881.661
881.661
1,286.44
827.65
2,114.094
Road - C27
Lm
27+000.000 27+070.000
70.000
61.60
59.50
121.100
Road - C28
Lm
28+000.000 28+133.000
133.000
132.80
115.80
248.600
Road - C29
Lm
29+000.000 29+215.767
215.767
257.10
257.10
514.200
Road - C30
Lm
30+000.000 30+151.033
151.033
135.13
136.45
271.580
6 = (5 - 4)
SECTOR - C (Part)
18,714.352
18,714.352
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Station
Distance
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
Unit
From
To
Road - D01
Lm
1+000.000
1+477.073
477.073
424.27
430.91
855.180
Road - D02
Lm
2+000.000
2+782.708
782.708
861.99
722.40
1,584.390
Road - D03
Lm
3+000.000
3+187.305
187.305
176.00
174.58
350.580
Road - D04
Lm
4+000.000
4+169.012
169.012
153.46
155.73
309.190
Road - D05
Lm
5+000.000
5+118.864
118.864
105.97
106.16
212.130
Road - D06
Lm
6+000.000
6+776.032
776.032
705.27
776.00
1,481.270
Road - D07
Lm
7+000.000
7+150.954
150.954
133.71
135.82
269.530
Road - D08
Lm
8+000.000
8+126.151
126.151
117.42
115.30
232.720
Road - D09
Lm
9+000.000
9+198.000
198.000
193.05
172.07
365.120
Road - D10
Lm
10+000.000 10+425.507
425.507
547.15
400.01
947.160
Road - D11
Lm
11+000.000 11+234.491
234.491
214.45
222.04
436.490
Road - D12
Lm
12+000.000 12+263.000
263.000
245.82
256.55
502.370
Road - D13
Lm
13+000.000 13+170.757
170.757
195.41
201.90
397.310
Road - D14
Lm
14+000.000 14+178.377
178.377
215.22
203.71
418.930
Road - D15
Lm
15+000.000 15+185.998
185.998
216.98
223.53
440.510
Road - D16
Lm
16+000.000 16+381.801
381.801
367.21
355.07
722.280
Road - D17
Lm
17+000.000 18+046.960
1,046.960
1,020.18
1,198.00
2,218.180
Road - D18
Lm
18+000.000 18+263.000
263.000
259.85
228.60
488.450
Road - D19
Lm
19+000.000 19+120.000
120.000
111.40
111.40
222.800
6 = (5 - 4)
SECTOR - D (Part)
12,703.682
12,703.682
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
2
Station
Distance
Unit
From
To
6 = (5 - 4)
Lm
5+225.000
7+096.438
1,871.438
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
CR-05, 06 & 07
Road - CR-05
Road Median Portion
Lm
692.28
694.36
1,386.640
676.12
679.36
1,355.480
1,820.10
1,442.26
3,262.360
3,559.74
3,559.740
Road - CR-06
Road Median Portion
Lm
6+000.000
6+732.791
732.791
Lm
-
Road - CR-07
Road Median Portion
Lm
7+000.000
7+924.283
924.283
Both Side
865.79
Lm
858.90
1,724.690
1,775.64
1,775.640
Both Side
Other's
Lm
270.00
270.000
Median
445.40
445.400
Median
64.50
64.500
Median
14,121.339
14,121.339
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete drop curbs 305 x 150mm
Item No.:
15/3/1/2
Sub-Bill No.
Description
Unit
BOQ Estimated
(Quantity)
Upto Date
(Quantity)
Previous Month
(Quantity)
This Month
(Quantity)
7=5-6
Sqm
538.60
538.60
538.60
Zone -B (Roads)
Sqm
730.80
730.80
730.80
Zone -C (Roads)
Sqm
545.40
545.40
545.40
Zone -D (Roads)
Sqm
668.60
668.60
668.60
Sqm
Sqm
2,483.40
2,483.40
2,731.74
2,731.74
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
2,483.40
2,731.74
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Station
Distance
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
Unit
From
To
Road - A01
Lm
1+000.000
1+772.759
772.759
Road - A02
Lm
2+000.000
2+068.000
68.000
Road - A03
Lm
3+000.000
3+600.513
600.513
Road - A04
Lm
4+000.000
4+383.293
383.293
Road - A05
Lm
5+000.000
5+315.292
315.292
Road - A06
Lm
6+000.000
6+130.140
130.140
Road - A07
Lm
7+000.000
7+068.140
68.140
Road - A08
Lm
8+000.000
8+188.292
188.292
Road - A09
Lm
9+000.000
9+531.062
531.062
Road - A10
Lm
10+000.000 10+198.567
198.567
Road - A11
Lm
11+000.000 11+243.325
243.325
Road - A12
Lm
12+000.000 12+130.373
130.373
Road - A13
Lm
13+000.000 13+522.090
522.090
Road - A14
Lm
14+000.000 14+318.199
318.199
Road - A15
Lm
15+000.000 15+232.689
232.689
Road - A16
Lm
16+000.000 16+797.749
797.749
Road - A17
Lm
17+000.000 17+192.896
192.896
Road - A18
Lm
18+000.000 18+405.599
405.599
Road - A19
Lm
19+000.000 19+220.291
220.291
Road - A20
Lm
20+000.000 20+138.562
138.562
Road - A21
Lm
21+000.000 21+325.586
325.586
Road - A22
Lm
22+000.000 22+135.000
135.000
Road - A23
Lm
23+000.000 23+642.652
642.652
Road - A24
Lm
24+000.000 24+651.293
651.293
Road - A25
Lm
25+000.000 25+070.000
70.000
Road - A26
Lm
26+000.000 26+138.000
138.000
Road - A27
Lm
27+000.000 27+176.478
176.478
Road - A28
Lm
28+000.000 28+313.778
313.778
Road - A29
Lm
29+000.000 29+268.245
268.245
Road - A30
Lm
30+000.000 30+201.191
201.191
Road - A31
Lm
31+000.000 31+429.386
429.386
Road - A32
Lm
32+000.000 32+135.000
135.000
Road - A33
Lm
33+000.000 33+237.399
237.399
Road - A34
Lm
34+000.000 34+692.989
692.989
Road - A35
Lm
35+000.000 35+196.323
196.323
Road - A36
Lm
36+000.000 36+255.005
255.005
Road - A37
Lm
37+000.000 37+287.252
287.252
Road - A38
Lm
38+000.000 38+220.325
220.325
Road - A39
Lm
39+000.000 39+133.000
133.000
Road - A40
Lm
40+000.000 40+795.559
795.559
6 = (5 - 4)
SECTOR - A (Part)
65.80
143.40
60.00
71.40
125.800
214.800
45.00
54.00
99.000
-
33.00
66.00
99.000
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Station
Unit
From
To
Distance
Quantit (LM)
RS
LS
Total
Quantity
9 = (7 + 8)
Remarks
Road - A41
Lm
41+000.000 41+439.730
439.730
Road - A42
Lm
42+000.000 42+691.935
691.935
Road - A43
Lm
43+000.000 43+283.145
283.145
Road - A44
Lm
44+000.000 44+145.944
145.944
Road - A45
Lm
45+000.000 45+070.099
70.099
Road - A46
Lm
46+000.000 46+263.367
263.367
Road - A47
Lm
47+000.000 47+213.557
213.557
Road - A48
Lm
48+000.000 48+440.060
440.060
6 = (5 - 4)
10
538.600
538.600
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Station
Distance
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
Unit
From
To
Road - B01
Lm
1+000.000
1+352.041
352.041
Road - B02
Lm
2+000.000
2+281.651
281.651
Road - B03
Lm
3+000.000
3+355.074
355.074
Road - B04
Lm
4+000.000
4+653.733
653.733
102.00
80.40
182.400
Road - B05
Lm
5+000.000
5+392.631
392.631
151.40
47.40
198.800
Road - B06
Lm
6+000.000
6+739.291
739.291
Road - B07
Lm
7+000.000
7+066.500
66.500
Road - B08
Lm
8+000.000
8+070.026
70.026
Road - B09
Lm
9+000.000
9+627.303
627.303
Road - B10
Lm
10+000.000 10+249.147
249.147
Road - B11
Lm
11+000.000 11+162.788
162.788
Road - B12
Lm
12+000.000 12+272.752
272.752
Road - B13
Lm
13+000.000 13+490.057
490.057
Road - B14
Lm
14+000.000 14+561.871
561.871
Road - B15
Lm
15+000.000 15+470.307
470.307
Road - B16
Lm
16+000.000 16+338.323
338.323
Road - B17
Lm
17+000.000 17+121.409
121.409
Road - B18
Lm
18+000.000 18+121.365
121.365
Road - B19
Lm
19+000.000 19+298.181
298.181
Road - B20
Lm
20+000.000 20+555.081
555.081
Road - B21
Lm
21+000.000 21+140.361
140.361
Road - B22
Lm
22+000.000 22+245.628
245.628
Road - B23
Lm
23+000.000 23+570.395
570.395
Road - B24
Lm
24+000.000 24+190.682
190.682
6 = (5 - 4)
SECTOR - B (Part)
15.00
104.60
119.40
15.000
224.000
56.80
53.80
110.600
730.800
730.800
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Station
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
896.889
65.20
59.40
124.600
3+300.854
300.854
95.80
95.80
191.600
4+133.000
133.000
5+000.000
5+135.000
135.000
Lm
6+000.000
6+440.724
440.724
Road - C07
Lm
7+000.000
7+068.500
68.500
Road - C08
Lm
8+000.000
8+135.000
135.000
Road - C09
Lm
9+000.000
9+496.690
496.690
Road - C10
Lm
10+000.000 10+373.875
373.875
Road - C11
Lm
11+000.000 11+271.000
271.000
Road - C12
Lm
12+000.000 12+198.000
198.000
Road - C13
Lm
13+000.000 13+135.000
135.000
Road - C14
Lm
14+000.000 14+203.000
203.000
Road - C15
Lm
15+000.000 15+133.000
133.000
Road - C16
Lm
16+000.000 16+859.169
859.169
Road - C17
Lm
17+000.000 17+109.057
109.057
Road - C18
Lm
18+000.000 18+558.679
558.679
Road - C19
Lm
19+000.000 19+120.000
120.000
15.00
15.00
30.000
Road - C20
Lm
20+000.000 20+120.000
120.000
15.00
15.00
30.000
Road - C21
Lm
21+000.000 21+258.000
258.000
Road - C22
Lm
22+000.000 22+336.000
336.000
Road - C23
Lm
23+000.000 23+138.000
138.000
Road - C24
Lm
24+000.000 24+091.049
91.049
Road - C25
Lm
25+000.000 25+404.592
404.592
Road - C26
Lm
26+000.000 26+881.661
881.661
Road - C27
Lm
27+000.000 27+070.000
70.000
Road - C28
Lm
28+000.000 28+133.000
133.000
Road - C29
Lm
29+000.000 29+215.767
215.767
Road - C30
Lm
30+000.000 30+151.033
151.033
Description
Distance
Unit
From
To
Road - C01
Lm
1+000.000
1+625.000
625.000
Road - C02
Lm
2+000.000
2+896.889
Road - C03
Lm
3+000.000
Road - C04
Lm
4+000.000
Road - C05
Lm
Road - C06
6 = (5 - 4)
SECTOR - C (Part)
50.40
35.40
85.800
32.80
50.60
83.400
545.400
545.400
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Station
Distance
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
Unit
From
To
Road - D01
Lm
1+000.000
1+477.073
477.073
Road - D02
Lm
2+000.000
2+782.708
782.708
Road - D03
Lm
3+000.000
3+187.305
187.305
Road - D04
Lm
4+000.000
4+169.012
169.012
20.80
Road - D05
Lm
5+000.000
5+118.864
118.864
35.80
Road - D06
Lm
6+000.000
6+776.032
776.032
Road - D07
Lm
7+000.000
7+150.954
150.954
Road - D08
Lm
8+000.000
8+126.151
126.151
Road - D09
Lm
9+000.000
9+198.000
198.000
Road - D10
Lm
10+000.000 10+425.507
425.507
Road - D11
Lm
11+000.000 11+234.491
234.491
Road - D12
Lm
12+000.000 12+263.000
263.000
Road - D13
Lm
13+000.000 13+170.757
170.757
41.80
45.00
86.800
Road - D14
Lm
14+000.000 14+178.377
178.377
50.80
42.00
92.800
Road - D15
Lm
15+000.000 15+185.998
185.998
47.80
51.00
98.800
Road - D16
Lm
16+000.000 16+381.801
381.801
Road - D17
Lm
17+000.000 18+046.960
1,046.960
113.80
128.60
242.400
Road - D18
Lm
18+000.000 18+263.000
263.000
Road - D19
Lm
19+000.000 19+120.000
120.000
6 = (5 - 4)
SECTOR - D (Part)
41.20
62.000
35.800
-
14.80
35.20
50.000
668.600
668.600
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Curbs Paint
Item No.:
15/3/2
Sub-Bill No.
Description
Unit
BOQ Estimated
(Quantity)
Upto Date
(Quantity)
Previous Month
(Quantity)
This Month
(Quantity)
7=5-6
LM
30,351.27
30,351.27
30,351.27
Zone -B (Roads)
LM
17,648.95
17,648.95
17,648.95
Zone -C (Roads)
LM
18,714.35
18,714.35
18,714.35
Zone -D (Roads)
LM
12,703.68
12,703.68
12,703.68
LM
14,121.34
14,121.34
14,121.34
LM
93,539.59
93,539.59
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
93,539.59
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Station
Distance
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
Unit
From
To
Road - A01
Lm
1+000.000
1+772.759
772.759
735.36
861.88
1,597.240
Road - A02
Lm
2+000.000
2+068.000
68.000
59.19
59.31
118.500
Road - A03
Lm
3+000.000
3+600.513
600.513
558.37
581.96
1,140.330
Road - A04
Lm
4+000.000
4+383.293
383.293
360.77
347.95
708.720
Road - A05
Lm
5+000.000
5+315.292
315.292
116.10
127.93
244.030
Road - A06
Lm
6+000.000
6+130.140
130.140
121.10
121.10
242.200
Road - A07
Lm
7+000.000
7+068.140
68.140
59.40
59.40
118.800
Road - A08
Lm
8+000.000
8+188.292
188.292
171.41
121.23
292.640
Road - A09
Lm
9+000.000
9+531.062
531.062
552.60
537.09
1,089.680
Road - A10
Lm
10+000.000 10+198.567
198.567
179.00
191.61
370.610
Road - A11
Lm
11+000.000 11+243.325
243.325
216.25
238.05
454.300
Road - A12
Lm
12+000.000 12+130.373
130.373
121.50
121.50
243.000
Road - A13
Lm
13+000.000 13+522.090
522.090
477.57
485.56
963.130
Road - A14
Lm
14+000.000 14+318.199
318.199
292.60
300.11
592.710
Road - A15
Lm
15+000.000 15+232.689
232.689
278.07
278.15
556.220
Road - A16
Lm
16+000.000 16+797.749
797.749
742.09
876.87
1,618.960
Road - A17
Lm
17+000.000 17+192.896
192.896
172.26
176.95
349.210
Road - A18
Lm
18+000.000 18+405.599
405.599
608.96
414.10
1,023.060
Road - A19
Lm
19+000.000 19+220.291
220.291
206.40
201.35
407.750
Road - A20
Lm
20+000.000 20+138.562
138.562
130.11
127.28
257.390
Road - A21
Lm
21+000.000 21+325.586
325.586
294.52
309.84
604.360
Road - A22
Lm
22+000.000 22+135.000
135.000
113.49
126.71
240.200
Road - A23
Lm
23+000.000 23+642.652
642.652
598.00
609.47
1,207.470
Road - A24
Lm
24+000.000 24+651.293
651.293
604.84
625.37
1,230.210
Road - A25
Lm
25+000.000 25+070.000
70.000
61.50
61.50
123.000
Road - A26
Lm
26+000.000 26+138.000
138.000
129.15
120.18
249.330
Road - A27
Lm
27+000.000 27+176.478
176.478
167.88
167.66
335.540
Road - A28
Lm
28+000.000 28+313.778
313.778
287.10
287.58
574.680
Road - A29
Lm
29+000.000 29+268.245
268.245
258.85
271.45
530.300
Road - A30
Lm
30+000.000 30+201.191
201.191
192.61
192.25
384.860
Road - A31
Lm
31+000.000 31+429.386
429.386
393.52
411.67
805.190
Road - A32
Lm
32+000.000 32+135.000
135.000
128.28
116.22
244.500
Road - A33
Lm
33+000.000 33+237.399
237.399
208.66
187.38
396.040
Road - A34
Lm
34+000.000 34+692.989
692.989
818.25
646.94
1,465.190
Road - A35
Lm
35+000.000 35+196.323
196.323
190.10
184.62
374.720
Road - A36
Lm
36+000.000 36+255.005
255.005
238.11
238.25
476.360
Road - A37
Lm
37+000.000 37+287.252
287.252
276.50
271.81
548.310
Road - A38
Lm
38+000.000 38+220.325
220.325
250.00
239.95
489.950
Road - A39
Lm
39+000.000 39+133.000
133.000
115.80
125.53
241.330
Road - A40
Lm
40+000.000 40+795.559
795.559
1,090.63
799.70
1,890.331
6 = (5 - 4)
SECTOR - A (Part)
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Station
Unit
From
To
Distance
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
Road - A41
Lm
41+000.000 41+439.730
439.730
419.37
389.83
809.200
Road - A42
Lm
42+000.000 42+691.935
691.935
613.37
731.74
1,345.110
Road - A43
Lm
43+000.000 43+283.145
283.145
275.85
271.51
547.360
Road - A44
Lm
44+000.000 44+145.944
145.944
136.00
136.55
272.550
Road - A45
Lm
45+000.000 45+070.099
70.099
61.50
59.70
121.200
Road - A46
Lm
46+000.000 46+263.367
263.367
246.50
247.50
494.000
Road - A47
Lm
47+000.000 47+213.557
213.557
197.90
194.75
392.650
Road - A48
Lm
48+000.000 48+440.060
440.060
410.76
562.97
973.730
6 = (5 - 4)
30,351.274
30,351.274
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Station
Distance
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
Unit
From
To
Road - B01
Lm
1+000.000
1+352.041
352.041
316.89
302.48
619.370
Road - B02
Lm
2+000.000
2+281.651
281.651
253.73
252.59
506.320
Road - B03
Lm
3+000.000
3+355.074
355.074
321.36
343.45
664.810
Road - B04
Lm
4+000.000
4+653.733
653.733
926.50
861.93
1,788.430
Road - B05
Lm
5+000.000
5+392.631
392.631
475.58
384.07
859.650
Road - B06
Lm
6+000.000
6+739.291
739.291
764.78
863.84
1,628.620
Road - B07
Lm
7+000.000
7+066.500
66.500
57.88
56.70
114.580
Road - B08
Lm
8+000.000
8+070.026
70.026
60.57
62.91
123.480
Road - B09
Lm
9+000.000
9+627.303
627.303
589.94
572.46
1,162.400
Road - B10
Lm
10+000.000 10+249.147
249.147
233.14
232.32
465.460
Road - B11
Lm
11+000.000 11+162.788
162.788
155.50
142.74
298.240
Road - B12
Lm
12+000.000 12+272.752
272.752
381.80
244.94
626.740
Road - B13
Lm
13+000.000 13+490.057
490.057
448.33
462.80
911.130
Road - B14
Lm
14+000.000 14+561.871
561.871
632.15
523.82
1,155.970
Road - B15
Lm
15+000.000 15+470.307
470.307
546.80
521.15
1,067.950
Road - B16
Lm
16+000.000 16+338.323
338.323
331.20
312.82
644.020
Road - B17
Lm
17+000.000 17+121.409
121.409
112.80
112.80
225.600
Road - B18
Lm
18+000.000 18+121.365
121.365
112.80
112.80
225.600
Road - B19
Lm
19+000.000 19+298.181
298.181
274.50
274.05
548.550
Road - B20
Lm
20+000.000 20+555.081
555.081
841.53
481.45
1,322.980
Road - B21
Lm
21+000.000 21+140.361
140.361
128.80
133.38
262.180
Road - B22
Lm
22+000.000 22+245.628
245.628
231.58
229.18
460.760
Road - B23
Lm
23+000.000 23+570.395
570.395
653.25
535.47
1,188.720
Road - B24
Lm
24+000.000 24+190.682
190.682
207.39
223.94
431.330
6 = (5 - 4)
SECTOR - B (Part)
17,648.948
17,648.948
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Station
Distance
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
Unit
From
To
Road - C01
Lm
1+000.000
1+625.000
625.000
587.90
839.56
1,427.460
Road - C02
Lm
2+000.000
2+896.889
896.889
896.00
794.36
1,690.360
Road - C03
Lm
3+000.000
3+300.854
300.854
378.00
378.00
756.000
Road - C04
Lm
4+000.000
4+133.000
133.000
137.37
115.48
252.850
Road - C05
Lm
5+000.000
5+135.000
135.000
126.24
126.24
252.480
Road - C06
Lm
6+000.000
6+440.724
440.724
416.29
415.87
832.160
Road - C07
Lm
7+000.000
7+068.500
68.500
59.45
59.45
118.900
Road - C08
Lm
8+000.000
8+135.000
135.000
117.44
127.90
245.340
Road - C09
Lm
9+000.000
9+496.690
496.690
465.68
454.55
920.230
Road - C10
Lm
10+000.000 10+373.875
373.875
361.90
247.25
609.150
Road - C11
Lm
11+000.000 11+271.000
271.000
255.62
255.62
511.240
Road - C12
Lm
12+000.000 12+198.000
198.000
171.72
192.85
364.570
Road - C13
Lm
13+000.000 13+135.000
135.000
126.40
126.40
252.800
Road - C14
Lm
14+000.000 14+203.000
203.000
212.24
236.00
448.240
Road - C15
Lm
15+000.000 15+133.000
133.000
126.24
115.80
242.040
Road - C16
Lm
16+000.000 16+859.169
859.169
800.16
1,050.81
1,850.970
Road - C17
Lm
17+000.000 17+109.057
109.057
105.00
105.00
210.000
Road - C18
Lm
18+000.000 18+558.679
558.679
502.89
562.50
1,065.390
Road - C19
Lm
19+000.000 19+120.000
120.000
123.00
123.00
246.000
Road - C20
Lm
20+000.000 20+120.000
120.000
123.00
123.00
246.000
Road - C21
Lm
21+000.000 21+258.000
258.000
245.77
233.50
479.270
Road - C22
Lm
22+000.000 22+336.000
336.000
319.05
320.57
639.620
Road - C23
Lm
23+000.000 23+138.000
138.000
120.61
131.20
251.810
Road - C24
Lm
24+000.000 24+091.049
91.049
91.08
91.08
182.150
Road - C25
Lm
25+000.000 25+404.592
404.592
609.15
373.65
982.800
Road - C26
Lm
26+000.000 26+881.661
881.661
1,286.44
827.65
2,114.094
Road - C27
Lm
27+000.000 27+070.000
70.000
61.60
59.50
121.100
Road - C28
Lm
28+000.000 28+133.000
133.000
132.80
115.80
248.600
Road - C29
Lm
29+000.000 29+215.767
215.767
257.10
257.10
514.200
Road - C30
Lm
30+000.000 30+151.033
151.033
135.13
136.45
271.580
6 = (5 - 4)
SECTOR - C (Part)
18,714.352
18,714.352
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Station
Distance
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
Unit
From
To
Road - D01
Lm
1+000.000
1+477.073
477.073
424.27
430.91
855.180
Road - D02
Lm
2+000.000
2+782.708
782.708
861.99
722.40
1,584.390
Road - D03
Lm
3+000.000
3+187.305
187.305
176.00
174.58
350.580
Road - D04
Lm
4+000.000
4+169.012
169.012
153.46
155.73
309.190
Road - D05
Lm
5+000.000
5+118.864
118.864
105.97
106.16
212.130
Road - D06
Lm
6+000.000
6+776.032
776.032
705.27
776.00
1,481.270
Road - D07
Lm
7+000.000
7+150.954
150.954
133.71
135.82
269.530
Road - D08
Lm
8+000.000
8+126.151
126.151
117.42
115.30
232.720
Road - D09
Lm
9+000.000
9+198.000
198.000
193.05
172.07
365.120
Road - D10
Lm
10+000.000 10+425.507
425.507
547.15
400.01
947.160
Road - D11
Lm
11+000.000 11+234.491
234.491
214.45
222.04
436.490
Road - D12
Lm
12+000.000 12+263.000
263.000
245.82
256.55
502.370
Road - D13
Lm
13+000.000 13+170.757
170.757
195.41
201.90
397.310
Road - D14
Lm
14+000.000 14+178.377
178.377
215.22
203.71
418.930
Road - D15
Lm
15+000.000 15+185.998
185.998
216.98
223.53
440.510
Road - D16
Lm
16+000.000 16+381.801
381.801
367.21
355.07
722.280
Road - D17
Lm
17+000.000 18+046.960
1,046.960
1,020.18
1,198.00
2,218.180
Road - D18
Lm
18+000.000 18+263.000
263.000
259.85
228.60
488.450
Road - D19
Lm
19+000.000 19+120.000
120.000
111.40
111.40
222.800
6 = (5 - 4)
SECTOR - D (Part)
12,703.682
12,703.682
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
2
Station
Distance
Unit
From
To
6 = (5 - 4)
Lm
5+225.000
7+096.438
1,871.438
Quantit (LM)
RS
LS
Total
Quantity
Remarks
9 = (7 + 8)
10
CR-05, 06 & 07
Road - CR-05
Road Median Portion
Lm
692.28
694.36
1,386.640
676.12
679.36
1,355.480
1,820.10
1,442.26
3,262.360
3,559.74
3,559.740
Road - CR-06
Road Median Portion
Lm
6+000.000
6+732.791
732.791
Lm
-
Road - CR-07
Road Median Portion
Lm
7+000.000
7+924.283
924.283
Both Side
865.79
Lm
858.90
1,724.690
1,775.64
1,775.640
Both Side
Other's
Lm
270.00
270.000
Median
445.40
445.400
Median
64.50
64.500
Median
14,121.339
14,121.339
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Cement Concrete Flush curbs 225x150mm
Item No.:
15/3/1/3
Sub-Bill No.
Description
Unit
BOQ Estimated
(Quantity)
Upto Date
(Quantity)
Previous Month
(Quantity)
This Month
(Quantity)
7=5-6
LM
2,534.40
2,534.40
Zone -B (Roads)
LM
1,267.20
1,267.20
Zone -C (Roads)
LM
1,584.00
1,584.00
Zone -D (Roads)
LM
1,003.20
1,003.20
LM
588.00
588.00
LM
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
6,976.80
6,976.80
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
2
Unit
Sides of
Road
Length
Nos
Total
Quantity
Remarks
6 = (5 - 4)
9 = (7 + 8)
10
SECTOR - A (Part)
Road - A01
Lm
2.000
6.60
4.00
52.800
Road - A02
Lm
2.000
6.60
4.00
52.800
Road - A03
Lm
2.000
6.60
4.00
52.800
Road - A04
Lm
2.000
6.60
4.00
52.800
Road - A05
Lm
2.000
6.60
4.00
52.800
Road - A06
Lm
2.000
6.60
4.00
52.800
Road - A07
Lm
2.000
6.60
4.00
52.800
Road - A08
Lm
2.000
6.60
4.00
52.800
Road - A09
Lm
2.000
6.60
4.00
52.800
Road - A10
Lm
2.000
6.60
4.00
52.800
Road - A11
Lm
2.000
6.60
4.00
52.800
Road - A12
Lm
2.000
6.60
4.00
52.800
Road - A13
Lm
2.000
6.60
4.00
52.800
Road - A14
Lm
2.000
6.60
4.00
52.800
Road - A15
Lm
2.000
6.60
4.00
52.800
Road - A16
Lm
2.000
6.60
4.00
52.800
Road - A17
Lm
2.000
6.60
4.00
52.800
Road - A18
Lm
2.000
6.60
4.00
52.800
Road - A19
Lm
2.000
6.60
4.00
52.800
Road - A20
Lm
2.000
6.60
4.00
52.800
Road - A21
Lm
2.000
6.60
4.00
52.800
Road - A22
Lm
2.000
6.60
4.00
52.800
Road - A23
Lm
2.000
6.60
4.00
52.800
Road - A24
Lm
2.000
6.60
4.00
52.800
Road - A25
Lm
2.000
6.60
4.00
52.800
Road - A26
Lm
2.000
6.60
4.00
52.800
Road - A27
Lm
2.000
6.60
4.00
52.800
Road - A28
Lm
2.000
6.60
4.00
52.800
Road - A29
Lm
2.000
6.60
4.00
52.800
Road - A30
Lm
2.000
6.60
4.00
52.800
Road - A31
Lm
2.000
6.60
4.00
52.800
Road - A32
Lm
2.000
6.60
4.00
52.800
Road - A33
Lm
2.000
6.60
4.00
52.800
Road - A34
Lm
2.000
6.60
4.00
52.800
Road - A35
Lm
2.000
6.60
4.00
52.800
Road - A36
Lm
2.000
6.60
4.00
52.800
Road - A37
Lm
2.000
6.60
4.00
52.800
Road - A38
Lm
2.000
6.60
4.00
52.800
Road - A39
Lm
2.000
6.60
4.00
52.800
Road - A40
Lm
2.000
6.60
4.00
52.800
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Unit
Sides of
Road
Length
Nos
Total
Quantity
Remarks
6 = (5 - 4)
9 = (7 + 8)
10
Road - A41
Lm
2.000
6.60
4.00
52.800
Road - A42
Lm
2.000
6.60
4.00
52.800
Road - A43
Lm
2.000
6.60
4.00
52.800
Road - A44
Lm
2.000
6.60
4.00
52.800
Road - A45
Lm
2.000
6.60
4.00
52.800
Road - A46
Lm
2.000
6.60
4.00
52.800
Road - A47
Lm
2.000
6.60
4.00
52.800
Road - A48
Lm
2.000
6.60
4.00
52.800
2,534.400
2,534.400
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
2
Unit
Sides of
Road
Length
Nos
Total
Quantity
Remarks
6 = (5 - 4)
9 = (7 + 8)
10
SECTOR - B (Part)
Road - B01
Lm
2.000
6.60
4.00
52.800
Road - B02
Lm
2.000
6.60
4.00
52.800
Road - B03
Lm
2.000
6.60
4.00
52.800
Road - B04
Lm
2.000
6.60
4.00
52.800
Road - B05
Lm
2.000
6.60
4.00
52.800
Road - B06
Lm
2.000
6.60
4.00
52.800
Road - B07
Lm
2.000
6.60
4.00
52.800
Road - B08
Lm
2.000
6.60
4.00
52.800
Road - B09
Lm
2.000
6.60
4.00
52.800
Road - B10
Lm
2.000
6.60
4.00
52.800
Road - B11
Lm
2.000
6.60
4.00
52.800
Road - B12
Lm
2.000
6.60
4.00
52.800
Road - B13
Lm
2.000
6.60
4.00
52.800
Road - B14
Lm
2.000
6.60
4.00
52.800
Road - B15
Lm
2.000
6.60
4.00
52.800
Road - B16
Lm
2.000
6.60
4.00
52.800
Road - B17
Lm
2.000
6.60
4.00
52.800
Road - B18
Lm
2.000
6.60
4.00
52.800
Road - B19
Lm
2.000
6.60
4.00
52.800
Road - B20
Lm
2.000
6.60
4.00
52.800
Road - B21
Lm
2.000
6.60
4.00
52.800
Road - B22
Lm
2.000
6.60
4.00
52.800
Road - B23
Lm
2.000
6.60
4.00
52.800
Road - B24
Lm
2.000
6.60
4.00
52.800
1,267.200
1,267.200
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
2
Unit
Sides of
Road
Length
Nos
Total
Quantity
Remarks
6 = (5 - 4)
9 = (7 + 8)
10
SECTOR - C (Part)
Road - C01
Lm
2.000
6.60
4.00
52.800
Road - C02
Lm
2.000
6.60
4.00
52.800
Road - C03
Lm
2.000
6.60
4.00
52.800
Road - C04
Lm
2.000
6.60
4.00
52.800
Road - C05
Lm
2.000
6.60
4.00
52.800
Road - C06
Lm
2.000
6.60
4.00
52.800
Road - C07
Lm
2.000
6.60
4.00
52.800
Road - C08
Lm
2.000
6.60
4.00
52.800
Road - C09
Lm
2.000
6.60
4.00
52.800
Road - C10
Lm
2.000
6.60
4.00
52.800
Road - C11
Lm
2.000
6.60
4.00
52.800
Road - C12
Lm
2.000
6.60
4.00
52.800
Road - C13
Lm
2.000
6.60
4.00
52.800
Road - C14
Lm
2.000
6.60
4.00
52.800
Road - C15
Lm
2.000
6.60
4.00
52.800
Road - C16
Lm
2.000
6.60
4.00
52.800
Road - C17
Lm
2.000
6.60
4.00
52.800
Road - C18
Lm
2.000
6.60
4.00
52.800
Road - C19
Lm
2.000
6.60
4.00
52.800
Road - C20
Lm
2.000
6.60
4.00
52.800
Road - C21
Lm
2.000
6.60
4.00
52.800
Road - C22
Lm
2.000
6.60
4.00
52.800
Road - C23
Lm
2.000
6.60
4.00
52.800
Road - C24
Lm
2.000
6.60
4.00
52.800
Road - C25
Lm
2.000
6.60
4.00
52.800
Road - C26
Lm
2.000
6.60
4.00
52.800
Road - C27
Lm
2.000
6.60
4.00
52.800
Road - C28
Lm
2.000
6.60
4.00
52.800
Road - C29
Lm
2.000
6.60
4.00
52.800
Road - C30
Lm
2.000
6.60
4.00
52.800
1,584.000
1,584.000
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
2
Unit
Sides of
Road
Length
Nos
Total
Quantity
Remarks
6 = (5 - 4)
9 = (7 + 8)
10
SECTOR - D (Part)
Road - D01
Lm
2.000
6.60
4.00
52.800
Road - D02
Lm
2.000
6.60
4.00
52.800
Road - D03
Lm
2.000
6.60
4.00
52.800
Road - D04
Lm
2.000
6.60
4.00
52.800
Road - D05
Lm
2.000
6.60
4.00
52.800
Road - D06
Lm
2.000
6.60
4.00
52.800
Road - D07
Lm
2.000
6.60
4.00
52.800
Road - D08
Lm
2.000
6.60
4.00
52.800
Road - D09
Lm
2.000
6.60
4.00
52.800
Road - D10
Lm
2.000
6.60
4.00
52.800
Road - D11
Lm
2.000
6.60
4.00
52.800
Road - D12
Lm
2.000
6.60
4.00
52.800
Road - D13
Lm
2.000
6.60
4.00
52.800
Road - D14
Lm
2.000
6.60
4.00
52.800
Road - D15
Lm
2.000
6.60
4.00
52.800
Road - D16
Lm
2.000
6.60
4.00
52.800
Road - D17
Lm
2.000
6.60
4.00
52.800
Road - D18
Lm
2.000
6.60
4.00
52.800
Road - D19
Lm
2.000
6.60
4.00
52.800
1,003.200
1,003.200
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
2
Unit
Sides of
Road
Length
Nos
Total
Quantity
Remarks
6 = (5 - 4)
9 = (7 + 8)
10
CR-05, 06 & 07
Road - CR-05
Lm
4.000
10.50
4.00
168.000
Road - CR-06
Lm
6.000
10.50
4.00
252.000
Road - CR-07
Lm
4.000
10.50
4.00
168.000
588.000
588.000
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Bill No.:
DIVISION 15 - SIDE WALKS, CURBS.
Description: Paved Block
Item No.:
15/2/1
Sub-Bill No.
Description
Unit
BOQ Estimated
(Quantity)
Upto Date
(Quantity)
Previous Month
(Quantity)
This Month
(Quantity)
7=5-6
Sqm
4,181.76
4,181.76
Zone -B (Roads)
Sqm
2,090.88
2,090.88
Zone -C (Roads)
Sqm
2,613.60
2,613.60
Zone -D (Roads)
Sqm
1,655.28
1,655.28
Sqm
1,146.60
1,146.60
Sqm
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
11,688.12
11,688.12
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
2
Unit
Sides of
Road
Med
(Area)
End
(Area)
Total
Quantity
Remarks
8 = (5+6+7)x4
SECTOR - A (Part)
Road - A01
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A02
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A03
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A04
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A05
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A06
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A07
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A08
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A09
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A10
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A11
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A12
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A13
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A14
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A15
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A16
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A17
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A18
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A19
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A20
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A21
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A22
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A23
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A24
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A25
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A26
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A27
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A28
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A29
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A30
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A31
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A32
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A33
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A34
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A35
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A36
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A37
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A38
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A39
Sqm
2.000
11.88
19.80
11.88
87.120
Sheet3of23
MONTHLY STATEMENT NO.00
Description
Unit
Sides of
Road
4
Med
(Area)
End
(Area)
Total
Quantity
Remarks
8 = (5+6+7)x4
Road - A40
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A41
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A42
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A43
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A44
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A45
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A46
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A47
Sqm
2.000
11.88
19.80
11.88
87.120
Road - A48
Sqm
2.000
11.88
19.80
11.88
87.120
4,181.760
4,181.760
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
2
Unit
Sides of
Road
Med
(Area)
End
(Area)
Total
Quantity
Remarks
8 = (5+6+7)x4
SECTOR - B (Part)
Road - B01
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B02
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B03
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B04
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B05
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B06
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B07
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B08
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B09
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B10
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B11
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B12
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B13
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B14
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B15
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B16
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B17
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B18
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B19
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B20
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B21
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B22
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B23
Sqm
2.000
11.88
19.80
11.88
87.120
Road - B24
Sqm
2.000
11.88
19.80
11.88
87.120
2,090.880
2,090.880
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
2
Unit
Sides of
Road
Med
(Area)
End
(Area)
Total
Quantity
Remarks
8 = (5+6+7)x4
SECTOR - C (Part)
Road - C01
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C02
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C03
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C04
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C05
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C06
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C07
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C08
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C09
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C10
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C11
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C12
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C13
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C14
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C15
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C16
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C17
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C18
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C19
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C20
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C21
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C22
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C23
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C24
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C25
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C26
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C27
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C28
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C29
Sqm
2.000
11.88
19.80
11.88
87.120
Road - C30
Sqm
2.000
11.88
19.80
11.88
87.120
2,613.600
2,613.600
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
2
Unit
Sides of
Road
Med
(Area)
End
(Area)
Total
Quantity
Remarks
8 = (5+6+7)x4
SECTOR - D (Part)
Road - D01
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D02
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D03
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D04
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D05
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D06
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D07
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D08
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D09
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D10
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D11
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D12
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D13
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D14
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D15
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D16
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D17
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D18
Sqm
2.000
11.88
19.80
11.88
87.120
Road - D19
Sqm
2.000
11.88
19.80
11.88
87.120
1,655.280
1,655.280
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.
Sheet3of23
MONTHLY STATEMENT NO.00
Description
2
Unit
Sides of
Road
Med
(Area)
End
(Area)
Total
Quantity
Remarks
8 = (5+6+7)x4
CR-05, 06 & 07
Road - CR-05
Sqm
4.000
18.90
31.50
31.50
327.600
Road - CR-06
Sqm
6.000
18.90
31.50
31.50
491.400
Road - CR-07
Sqm
4.000
18.90
31.50
31.50
327.600
1,146.600
1,146.600
Prepared By:
Contractor Representative
Al-Ayuni Investment & Contracting Co.
Checked By:
Consultant Representative
Saudi Arabian Parson Ltd.