This document provides a rate sheet for various construction materials including: 1. Concrete ready mix which lists costs per cubic meter based on material, wastage, labor, and profit. Rates are provided for different concrete grades. 2. Concrete slab thicknesses which lists costs per square meter for slabs of varying thicknesses. 3. BRC mesh which lists costs per square meter including material, discount, wastage, labor, and profit. 4. Steel bar costs which lists costs per kilogram for bars of varying diameters including material, wastage, labor, and profit. 5. Rates are also provided for different grades of steel such as Y10, Y12, Y16, Y20

Uploaded by

SEEN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views6 pages

Built Up Rate

This document provides a rate sheet for various construction materials including: 1. Concrete ready mix which lists costs per cubic meter based on material, wastage, labor, and profit. Rates are provided for different concrete grades. 2. Concrete slab thicknesses which lists costs per square meter for slabs of varying thicknesses. 3. BRC mesh which lists costs per square meter including material, discount, wastage, labor, and profit. 4. Steel bar costs which lists costs per kilogram for bars of varying diameters including material, wastage, labor, and profit. 5. Rates are also provided for different grades of steel such as Y10, Y12, Y16, Y20

Uploaded by

SEEN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

BUILT UP RATE

1. CONCRETE READY MIX COST/M3


ITEM
DESCRIPTION
A

MATERIAL COST

WASTAGE

SUB TOTAL (A+ B)

LABOUR

SUB TOTAL (C+D)

PROFIT

TOTAL (E+F)

ROUND UP

G15
232.00
5%

243.60
24.00

10%

PROFIT

TOTAL (G+H)

ROUND UP

4. STEEL BAR COST/KG


ITEM
DESCRIPTION
A
MATERIAL COST

26.76
294.36
294.40

G15

50MM THICK
75MM THICK
100MM THICK
125MM THICK
150MM THICK
175MM THICK
200MM THICK
225MM THICK
275MM THICK
300MM THICK

3. BRC COST/M2
ITEM
DESCRIPTION
A
MATERIAL COST
B
DISCOUNT
C
COST/M2
D
WASTAGE + LAPS
E
SUB TOTAL (C+D)
F
LABOUR (3.02KG/M2)
G
SUB TOTAL (E+F)

24.00
267.60

2. CONCRETE READY MIX /M2


DESCRIPTION
A
B
C
D
E
F
G
H
I
J

11.60

14.72
22.08
29.44
36.80
44.16
51.52
58.88
66.24
80.96
88.32

A6
65.70
6.57
1.31
7.88
1.15
9.03

20%
1.15
10%

0.90
9.93
10.00

Y10
2.55

B
C
D
E
F
G
H

WASTAGE
SUB TOTAL (A+ B)
LABOUR
SUB TOTAL (C+D)
PROFIT
TOTAL (E+F)
ROUND UP

5%
0.38
10%

0.13
2.68
0.23
2.91
0.29
3.20
3.20

G20

G25

G30

245.00

257.00

267.00

12.25

12.85

13.35

257.25

269.85

280.35

24.00

24.00

24.00

281.25

293.85

304.35

28.13

29.39

30.44

309.38

323.24

334.79

309.40

323.20

334.80

G20

G25

15.47
23.205
30.94
38.675
46.41
54.145
61.88
69.615
85.085
92.82

A7
83.00

G30

16.16
24.24
32.32
40.4
48.48
56.56
64.64
72.72
88.88
96.96

A8
144.10

16.74
25.11
33.48
41.85
50.22
58.59
66.96
75.33
92.07
100.44

A10
177.20

8.3
1.66
9.96
1.15
11.11

14.41
2.88
17.292
1.15
18.44

17.72
3.54
21.264
1.15
22.41

1.11

1.84

2.24

12.22

20.28

24.65

12.20

Y12

20.30

Y16
2.55

24.70

Y20
2.40

Y25
2.36

Y32
2.40

2.40

0.13
2.6775
0.34
3.01
0.30
3.32
3.30

0.12
2.52
0.60
3.12
0.31
3.43
3.40

0.12
2.478
0.94
3.42
0.34
3.76
3.80

0.12
2.52
1.46
3.98
0.40
4.38
4.40

0.12
2.52
2.40
4.92
0.49
5.42
5.40

R6

R8
2.50

1.80

0.13
2.625
0.08
2.71
0.27
2.98
3.00

0.09
1.89
0.15
2.0401
0.20
2.24
2.20

3.59