STATISTICAL DIGEST
2005
H ydro & The rmal E le c t ric ity Gene ra tion in Sri La nk a, 1 96 9 - 200 5
Generation in Million kWh.
Hydro
T he rmal
M aximum D e man d
9000
8000
7000
1500
6000
1000
5000
4000
3000
500
2000
Max. Demand in MW.
2000
10000
1000
0
1969 71
0
73
75
77
79
81
83
85
87
89
91
93
95
97
99
01
03 2005
Note - Year s of power cut - 1973, 1980, 1981, 1983, 1984, 1987, 1992, 1996, 2001 & 2002.
CEYLON ELECTRICITY BOARD
Statistical Unit
Commercial & Corporate Branch
Distribution Region - 3
P.O. Box 540, Colombo - 2, Sri Lanka.
Telefax: 94-1-2449572
SUMMARY STATISTICS - 2005
Units
2004
2005
Annual
Percentage
Increase
Number of Power Stations
(with PPP & Hired)
No.
79
81
2.5%
Installed Capacity (with PPP & Hired)
MW.
2499
2411
-3.5%
Maximum Demand (with PPP & Hired)
MW.
1563
1748
11.8%
Gross Generation (with PPP & Hired)
GWh.
8043
8769
9.0%
Self Generation (eligible + not eligible
for payment)
Gwh.
115
System Energy Loss (exclud. Self Gen.)
17.11
17.27
0.16%
Gross Units Sold ( exclud. Self Gen.)
GWh.
6,667
7,255
8.8%
Average Sale Price per Unit (without VAT)
Rs/kWh
7.66
7.71
0.6%
Revenue from billed Sales(exclud. Self Gen.)
[Link].
51,076
55,927
9.5%
Value Added Tax (for billed sales)
[Link].
7,359
8,105
10.1%
3,206,892
3,396,047
5.9%
73.4(a)
76.7(a)
3.3%
58.6
57.3
-1.3%
13,418
14,568
8.6%
Consumer Accounts
No.
% of Household Electrified
System Load Factor
Total Employed
No.
Capital Investments
[Link].
11,236
11,220
-0.1%
Net Fixed Assets in Operation (average)
[Link].
227,441
256,120
12.6%
Rate of Return on fixed assets
-5.11*
-1.15*
-0.15*
1.07
Debt Service Ratio
No. of Consumers per Employee
No./Employee
239
233
-2.5%
Av. Elect:Consumption per Capita
kWh/Person
348
369
5.9%
Av. Elect:Consumption per Consumer in
Domestic Sector
Commercial Sector
Industrial Sector
kWh/Consumer
kWh/Consumer
kWh/Consumer
767
3,419
69,379
804
3,549
71,908
4.8%
3.8%
3.6%
[Link] Consumers per length of [Link]
No./ km.
32.7
32.6
-0.4%
1.4
1.5
Electricity Elasticity (w.r.t. GDP)
Total Energy Consumption in Sri Lanka
kTOE
7,270
Per Capita Energy Consumption in Sri Lanka
TOE
0.37
Share of Elect. to Total Energy Supply
* - Tariff effective during 2004 & 2005 being below cost.
Note:- (1) P.P.P. refers to Private Power Purchase.
(2) All Financial data are Provisional.
7.7
(a) - Estimated.
GENERATION STATISTICS
[Link] Power Stations
Type of PowerStations
C.E.B. - Hydro
- Thermal
- Wind
P.P.P. - Hydro-Small #
- Thermal
Hired - Thermal
Total
Installed Capacity in MW.
2004
2005
% Increase
2004/05
2004
2005
%Increase
2004/05
16
7
1
38
8
9
16
6
1
48
10
-
0.0%
-14.3%
0.0%
26.3%
25.0%
-
1207
573
3
74
452
190
1207
548
3
86
567
-
0.0%
-4.4%
0.0%
15.7%
25.5%
-
79
81
2.5%
2499
2411
-3.5%
# - with Waste Heat, Solar, Biomass & Dendro Power Plants.
Note:- 1. PPP (Thermal) - Koolair in KKS (Jaffna) and Chunnakam station
were not connected to the National Grid.
2. Hired Plants were terminated at the end of October in 2004 except Chunnakam (20 MW).
Gross Generation in Gwh
Percentage of Total
Ownership & Source
2004
2005
C.E.B. - Hydro
- Thermal
- Wind
P.P.P. - Hydro-Small #
- Thermal
Hired - Thermal
Total Generation
2755
2507
2.7
206
2064
509
8043
3173
2162
2.4
280
3152
8769
15.2%
-13.8%
-8.4%
36.1%
52.7%
9.0%
22.0
24.0
9.3%
Under Incentive Payment in Gwh 115
Av. Daily Generation - GWh/day
% increase
47
Not Eligible for Incentive
Payment
67
Maximum Demand in MW.
1104.6 1206.7
1563.4* 1748.2**
* - At Monday 6th Dec. 2004
36.2%
24.7%
0.0%
3.2%
35.9%
100.0%
2004
1282
1215
3
2499
Gross Gen. by Source in Gwh
Hydro
2960
3453
Thermal
5080
5314
Wind
3
2
Total
8043
8769
Generation by Source -2004 & 2005
20 05
20 04
6.3%
20 05
0.0%
39.1 %
28.2%
CE B
PP P
0.0%
36.8%
60.9%
65.4%
H ir e d
2005
1293
1115
3
2411
1259
Generation by Ownership - 2004 & 2005
20 04
9.2%
11.8%
** - At Wednesday 25th May 05
Hydro Reservoir Capacity in Gwh 1259
34.2%
31.2%
0.0%
2.6%
25.7%
6.3%
100.0%
Hydro
Thermal
Wind
Total
(Defined Period for Incentive - Jan. To June in 2004)
Day
Night
2005
Installed Capa. by Source in MW.
Self Generation
Eligible for Incentive Payment
2004
39.4%
60.6%
63.2%
H y d ro
T h e r ma l
W ind
DATA ON FUEL USED FOR THERMAL GENERATION
Fuel Used in m. Litres
Fuel Cost in m. Rs.
Name of
Power Station
Type of
Fuel
2004
% increase
2005
2004/05
2004
2005
% increase
2004/05
K.P.S.(small GT)
L.A.D.
2000
489
-75.5%
70
12
-83.1%
K.P.S.(new GT)
L.A.D.
4384
4094
-6.6%
145
94
-35.1%
K.P.S.([Link].)
L.A.D.
3989
3231
-19.0%
129
75
-42.3%
Naphtha
3478
5617
61.5%
138
180
30.1%
L.H.F.
1290
1718
33.2%
69
75
8.3%
L.A.D.
39
54
39.5%
20.5%
SP.P.S.(Diesel) - A
SP.P.S.(Diesel) - B
L.H.F.
2043
2574
26.0%
110
114
3.8%
L.A.D.
26
37
44.2%
27.0%
Hired Plants
L.A.D.
4105
134
Small Diesel Generators
L.A.D.
36
Chunnakam - Diesel
L.A.D.
21389
TOTAL
13
17828
Fuel Cost For Thermal Generation
C.E.B.
-16.6%
799
600
482
500
10
Mil li on Litres
14578
15
Mil li on Rs.
Thousands
-30.9%
Fuel Used For Thermal Generation
C.E.B.
20
7918
5617
0.2
552
3478
3332
400
300
200
4293
184
180
189
179
138
100
0
0
N aphtha
LA D
20 04
N aphtha
LH F
LA D
20 04
20 05
LH F
20 05
Average Fuel Cost per Unit for Thermal Generation by Power Station in Rs/kWh
Name of
Power Station
2004
% increase
2005
2004/05
Average
KPS-GT
Average for Thermal
7.09
8.25
16.3%
K.P.S.(small GT)
14.14
22.02
55.7%
[Link].
K.P.S.(new GT)
10.00
14.78
47.9%
SPPS-A
K.P.S. ([Link].)
6.74
8.79
30.4%
SP.P.S.(Diesel) - A
4.38
5.40
23.4%
SP.P.S.(Diesel) - B
4.04
4.95
22.7%
Hired Plants
8.06
KSP-new GT
SPPS-B
Hirred
10
15
R s ./ k W h .
20 04
20 05
20
25
ELECTRICITY SALES IN GWh(million kWh) BY PROVINCES
Province
C.E.B.
Monthly
[Link]
kWh/Cons.
2005
2005
Percentage
Increase
2004/05
2005
Percentage
of Total
2005
Colombo City
934
8.7%
1015
14.0%
622
North Western
587
9.1%
640
8.8%
124
North Central
194
10.3%
214
2.9%
87
99
15.7%
114
1.6%
88
Region - 1 Total
1813
9.4%
1983
27.3%
188
Western-North
1421
8.7%
1544
21.3%
301
Central
439
7.0%
469
6.5%
94
Eastern
241
16.0%
280
3.9%
111
Northern
C.E.B.
Region - 2 Total
2101
9.2%
2294
31.6%
182
Western-South II
894
6.0%
948
13.1%
302
Uva
247
8.8%
269
3.7%
85
Sabaragamuwa
340
9.3%
371
5.1%
98
Region - 3 Total
1481
7.2%
1588
21.9%
158
Western-South I
700
10.8%
776
10.7%
353
571
7.6%
614
8.5%
115
Region - 4 Total
Southern
1271
9.4%
1390
19.2%
185
TOTAL
6667
8.8%
7255
100.0%
178
Note - Provincial Data are given according to Re-organization of Distribution Divisions in 2002 & 2005.
ELECTRICITY SALES IN GWh(million kWh) BY TARIFF
Tariff
C.E.B.
Monthly
[Link]
kWh/Cons.
2005
C.E.B.
2004
Percentage
Increase
2004/05
2005
Percentage
of Total
2005
Domestic
2166
10.9%
2403
33.1%
Religious
38
7.8%
41
0.6%
1132
10.8%
1254
17.3%
296
614
9.6%
673
9.3%
160
Medium
385
14.3%
440
6.1%
17,323
Large
133
6.5%
142
2.0%
274,328
5,992
General Total
Small
67
168
2266
7.9%
2446
33.7%
Small
157
5.6%
166
2.3%
456
Small T.D.
0.17
-0.6%
0.17
0.002%
2,375
Medium
953
10.7%
1055
14.5%
29,042
Medium T.D.
287
-6.6%
268
3.7%
42,731
Large
635
16.9%
742
10.2%
589,198
Large T.D.
234
-8.5%
215
3.0%
483,223
2,313,390
Industrial Total
Bulk Supply to LECO
981
4.7%
1027
14.2%
L1 - [Link]
1.2
-5.8%
1.1
0.02%
91,333
L2 -11kV & above
980
4.7%
1026
14.1%
2,375,116
83
-0.3%
83
1.1%
6,937,750
6667
8.8%
7255
100.0%
178
Street Lighting
TOTAL
Note:- Excludes Self Generation.
[Link] CONSUMER ACCOUNTS BY PROVINCES
Province
C.E.B.
Increase
in Accounts
2005
2004
Percentage
Increase
2004/05
C.E.B.
2005
Percentage
of Total
2005
Colombo City
132,760
3,220
2.4%
135,980
4.0%
North Western
402,954
25,479
6.3%
428,433
12.6%
North Central
189,530
16,000
8.4%
205,530
6.1%
98,065
10,442
10.6%
108,507
3.2%
Northern
Region - 1 Total
823,309
55,141
6.7%
878,450
25.9%
Western-North
407,791
19,904
4.9%
427,695
12.6%
12.2%
Central
393,937
20,443
5.2%
414,380
Eastern
195,744
14,693
7.5%
210,437
6.2%
Region - 2 Total
997,472
55,040
5.5%
1,052,512
31.0%
Western-South II
246,317
14,800
6.0%
261,117
7.7%
Uva
249,103
13,620
5.5%
262,723
7.7%
Sabaragamuwa
295,400
19,015
6.4%
314,415
9.3%
Region - 3 Total
790,820
47,435
6.0%
838,255
24.7%
Western-South I
174,196
8,941
5.1%
183,137
5.4%
Southern
421,094
22,598
5.4%
443,692
13.1%
Region - 4 Total
TOTAL
595,290
31,539
5.3%
626,829
18.5%
3,206,892
189,155
5.9%
3,396,047
100.0%
Note - Provincial Data are given according to Re-organization of Distribution Divisions in 2002 & 2005.
[Link] CONSUMER ACCOUNTS BY TARIFF
Tariff
C.E.B.
2004
Increase
in Accounts
2005
Domestic
2,823,654
164,569
5.8%
2,988,223
Religious
19,508
857
4.4%
20,365
0.6%
331,022
22,379
6.8%
353,401
10.4%
329,003
22,239
6.8%
351,242
10.3%
1,973
143
7.2%
2,116
0.1%
46
-3
-6.5%
43
negli.%
General Total
Small
Medium
Large
Industrial Total
Small
Small T.D.
Medium
Medium T.D.
Large
Percentage
Increase
2004/05
C.E.B.
2005
Percentage
of Total
2005
88.0%
32,666
1,354
4.1%
34,020
1.0%
29,063
1,258
4.3%
30,321
0.9%
0.0%
0.0%
2,892
136
4.7%
3,028
0.1%
568
-45
-7.9%
523
0.02%
98
7.1%
105
negli.%
Large T.D.
39
-2
-5.1%
37
negli.%
Bulk Supply to LECO
41
-4
-9.8%
37
negli.%
L1 - [Link]
L2 - 11kV & above
Street Lighting
TOTAL
Note:-
0.0%
negli.%
40
-4
-10.0%
36
negli.%
0.0%
0.0%
3,206,892
189,155
5.9%
3,396,047
100.0%
Street Lighting Accounts are accounted as one for 2004 & 2005.
Negli. - negligible.
REVENUE FROM ELECTRICITY SALES IN [Link]. BY PROVINCES
Province
C.E.B.
Colombo City
9,829
9.6%
North Western
4,179
North Central
1,351
2004
Northern
Percentage
Increase
2004/05
C.E.B.
2005
Percentage
of Total
2005
[Link]
Rs./kWh
2005
10,771
19.3%
10.61
9.8%
4,588
8.2%
7.17
10.2%
1,489
2.7%
6.97
701
16.2%
814
1.5%
7.14
Region - 1 Total
16,060
10.0%
17,662
31.6%
8.91
Western-North
10,471
9.6%
11,481
20.5%
7.44
3,132
7.5%
3,367
6.0%
7.17
Central
Eastern
Region - 2 Total
1,669
18.4%
1,976
3.5%
7.05
15,272
10.2%
16,824
30.1%
7.34
Western-South II
6,563
7.1%
7,028
12.6%
7.41
Uva
1,764
8.3%
1,910
3.4%
7.10
Sabaragamuwa
2,440
9.2%
2,665
4.8%
7.18
Region - 3 Total
10,767
7.8%
11,603
20.7%
7.31
Western-South I
5,071
10.6%
5,611
10.0%
7.23
Southern
Region - 4 Total
3,906
8,977
8.3%
9.6%
4,228
9,839
7.6%
17.6%
6.88
7.08
51,076
9.5%
55,927
100.0%
7.71
TOTAL
Note - Provincial Data are given according to Re-organization of Distribution Divisions in 2002 & 2005.
REVENUE FROM ELECTRICITY SALES IN [Link]. BY TARIFF
Tariff
C.E.B.
Domestic
Religious
General Total
Percentage
Increase
2004/05
C.E.B.
2004
2005
Percentage
of Total
2005
[Link]
Rs./kWh
2005
11,988
13.1%
13,558
24.2%
5.64
174
9.1%
190
0.3%
4.62
13,424
11.0%
14,895
26.6%
11.88
Small
6,827
9.7%
7,490
13.4%
11.13
Medium
4,993
14.2%
5,701
10.2%
12.96
12.04
Large
Industrial Total
Small
Small T.D.
Medium
1,604
6.2%
1,704
3.0%
18,947
7.9%
20,441
36.6%
8.36
1,207
5.9%
1,278
2.3%
7.71
0.2%
0.0%
7.35
8,321
10.0%
9,152
16.4%
8.67
Medium T.D.
2,512
-5.5%
2,373
4.2%
8.85
Large
5,044
17.4%
5,922
10.6%
7.98
Large T.D.
1,861
-7.8%
1,716
3.1%
8.00
Bulk Supply to LECO
5,891
5.1%
6,192
11.1%
6.03
L1 - [Link]
L2 -11kV & above
Street Lighting
TOTAL
-6.2%
0.0%
7.82
5,882
5.1%
6,184
11.1%
6.03
651
-0.3%
649
1.2%
7.80
51,076
9.5%
55,927
100.0%
7.71
LECO ELECTRICITY SALES
SALES BY TARIFF IN Gwh.
2004
2005
CONSUMER ACCOUNTS BY TARIFF
% Increase
2004/05
2004
2005
% Increase
2004/05
Domestic
428
456
6.7%
341,016
351,924
3.2%
Religious
11.8%
1,988
2,011
1.2%
191
211
10.3%
45,881
48,684
6.1%
132
141
7.2%
45,527
48,267
6.0%
General Total
Small
59
69
17.2%
354
417
17.8%
Hotel Total
39
33
-14.5%
43
47
9.3%
Small
0.0
0.0
5.8%
0.0%
Medium+T.D
35
32
-9.1%
40
44
10.0%
-70.7%
0.0%
225
240
6.8%
4,104
4,091
-0.3%
-0.5%
Medium
Large +T.D
Industrial Total
Small
Medium +T.D.
Large +T.D
Temporary Connections
Street Lighting
TOTAL
25
26
2.4%
3,514
3,498
189
200
5.7%
584
586
0.3%
11
15
34.8%
16.7%
50.5%
642
975
51.9%
22
23
4.5%
2,151
2,631
22.3%
912
973
6.6%
395,825
410,363
3.7%
C.E.B. ELECTRICITY SALES BY TARIFF
20 04
BULK +S.L.
1 6.0%
20 05
BULK +S.L.
1 5.3%
DOM+RP
33.1 %
DOM+RP
33.7%
IND USTRIAL
33.7%
IND USTRIAL
34.0%
GENERAL
1 7.0%
GENERAL
1 7.3%
[Link] ACCOUNTS BY TARIFF
20 04
20 05
DOM+RP
DOM+RP
88.7%
88.6%
IND USTRIAL
IND USTRIAL
1 .0%
1 .0%
GENERAL
GENERAL
1 0.3%
1 0.4%
GENERAL STATISTICS
Units
Population (Mid Year)
G.N.P. at Current Factor Cost Prices
2004
2005*
Percentage
Increase
2004/05
Thous.
19,462
19,668
1.1%
Rs.m.
1,780,062
2,068,273
16.2%
G.N.P. at Const.(1996)[Link] Prices
Rs.m.
969,421
1,023,209
5.5%
G.D.P. at Current Factor Cost Prices
Rs.m.
1,800,750
2,098,323
16.5%
G.D.P. at Const.(1996)[Link] Prices
Rs.m.
980,720
1,039,735
6.0%
G.G.D.P Per Capita at Market Prices
Rs.
104,273
120,282
15.4%
G.D.P Per Capita at Market Prices
U.S.$
CCPI Index (1952 = 100)
[Link] (1996 = 100)
Area of Sri Lanka
Average Exchange Rate
1,030
1,197
16.2%
3,633
4,056
11.6%
9.3
9.9
[Link].
65,610
65,610
Rs/US $
101.19
100.50
*-Provisional
FUEL RATE AND THERMAL EFFICIENCY
Fuel Rate in Litres/kWh
2004
2005
Av: Thermal Efficiency
2004
2005
K.P.S.(smallGT - L.A.D)
0.50
0.53
19.0%
17.7%
K.P.S.(new GT - L.A.D)
0.33
0.34
28.5%
27.7%
SP.P.S. - A ( L.A.D.)
0.43
0.50
21.7%
18.9%
SP.P.S. - A (L.H.F.)
0.23
0.23
40.5%
40.5%
SP.P.S.- B (L.A.D.)
0.32
0.37
29.1%
25.8%
SP.P.S.- B (L.H.F.)
0.21
0.22
43.6%
43.2%
K.P.S. - [Link]. (L.A.D.)
0.22
0.22
42.5%
42.2%
K.P.S. - [Link]. (Naptha)
0.26
0.27
46.7%
46.0%
Note:- K.P.S.
SP.P.S.
C.P.S.
G.T.
- Kelanitissa Power Station.
- Sapugaskande Power Station.
- Chunnakam Power Station.
- Gas Turbines
L.A.D.- Lanka Auto Diesel
L.H.F. - Lanka Heavy Fuel.
[Link]. - Combined Cycle.
K.K.S. - Kankasanthurai.
EXPENDITURE ON PRIVATE POWER PURCHASE - 2005
Power Station
Private-Thermal Total
Asia Power
Lakdhanavi
Barge Mounted
ACE - Matara
ACE - Horana
ACE - Embilipitiya
Heladhanavi
AES - KPS
Kool Air - KKS
Aggreko - Chunnakam
Private - Hydro Total
Total (Thermal + Hydro)
Total Cost
[Link].
31604
3636
1416
4488
1699
1729
4416
6058
6073
988
1101
1515
33119
Note:- Financial data are Provisional.
[Link]
Cost
Rs./kWh.
10.03
10.28
9.37
9.43
10.40
9.94
9.04
7.98
12.77
17.79
19.81
5.41
9.65
LENGTH OF TRANSMISSION AND DISTRIBUTION LINES IN km.
220 kV Route Length O.H.
132 kV Route Length O.H.
132 kV Route Length U.G.
33 kV Route Length O.H.
33 kV Route Length U.G.
11 kV Route Length O.H.
11 kV Route Length U.G.
Low Voltage Circuit Length O.H.& U.G.-Total
Single Phase O.H. & U.G.
Two Phase O.H. & U.G.
Three Phase O.H. & U.G.
2004
2005
331
1,651
13
18,507
103
1,430
810
77,198
35,020
4,844
37,334
331
1,675
13
19,661
103
1,655
821
82,037
36,235
4,814
40,988
% Increase
2004/05
0.0%
1.4%
0.0%
6.2%
0.0%
15.7%
1.4%
6.3%
3.5%
-0.6%
9.8%
Note:- 1. Excludes 141 route km of 132 kV transmission lines in the North due to uncertainty.
2. Includes only distribution lines & substations rehabilitated and used from 1999 in Northern
Province.
NUMBER AND CAPACITY OF SUBSTATIONS
Units
No.
MVA
No.
MVA
No.
MVA
No.
MVA
No.
MVA
No.
MVA
No.
MVA
Grid S.S. (132/33 kV)
Capacity
Grid S.S.(220/132/33kV)
Capacity
Grid S.S.(220/132kV)
Capacity
Grid S.S. (132/11 kV)
Capacity
Primary S.S. (33kV/11kV & 33kV/3.3kV)
Capacity
Distribution S.S.(33kV/LV & 11kV/LV)
Capacity
Total number of substations
Total Capacity
2004
33
2,150
6
2205 /735
1
105
2
180
124
1,077
15,480
3,931
15,646
10,383
% Increase
2004/05
3.0%
2.9%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
-0.8%
-3.9%
4.0%
3.2%
4.0%
1.4%
2005
34
2,213
6
2205 /735
1
105
2
180
123
1,035
16,099
4,055
16,265
10,528
RURAL ELECTRIFICATION SCHEMES COMPLETED
YEAR
No: of
Schemes
Total at End
of the year
1999
2000
2001
2002
2003
2004
2005
319
336
211
227
336
344
339
15,010
15,346
15,557
15,784
16,120
16,464
16,803
[Link] CONSUMER ACCOUNTS BY DISTRIBUTION REGIONS - CEB
20 04
R e gion 4
1 8.6%
20 05
R e gion 1
25.7%
R e gion 4
1 8.5%
R e gion 1
25.9%
R e gion 3
24.7%
R e gion 3
24.7%
R e gion 2
31 .1 %
R e gion 2
31 .0%
C.E.B. TARIFF - EFFECTIVE FROM 01.04.2002
(with amendment effect from 01/08/2002)
DOMESTIC
First 30 units @ Rs 3.00 per unit
31 - 60 units @ Rs 3.70 per unit
61 - 90 units @ Rs 4.10 per unit
91 - 180 units @ Rs 10.60 per unit
Above 180 units @ Rs 15.80 per unit
Monthly Fixed Charge
Rs 30.00 per month
RELIGIOUS & CHARITABLE INSTITUTIONS:First 30 units @ Rs 2.50 per unit
31 - 90 units @ Rs 2.70 per unit
91 - 180 units @ Rs 4.00 per unit
Above 180 units @ Rs.7.20 per unit
Monthly Fixed Charge
OTHER CATEGORIES
Rs 30.00 per month
General
purpose
Industrial
purpose
Supply at 400/230V
Contract demand
less than 42 kVA
Unit Charge
(Rs/unit)
Fixed Charge(Rs./Month)
Upto 10 kVA
Fixed Charge(Rs./Month)
above 10 kVA
Demand Charge
(Rs/kVA)
Fixed Charge(Rs./Month)
10.90
7.50
+
30.00
+
30.00
or
or
or
230.00
230.00
230.00
+
100.00 [CD]
+
800.00
10.80
7.10
off peak
6.50 +
peak (7 pm to 10 pm)
14.70
+
480.00
+
800.00
400.00
+
800.00
380.00
+
800.00
10.70
7.00
+
460.00
+
800.00
Supply at 11/33/132 kV
Unit Charge
(Rs/unit)
Demand Charge
(Rs/kVA)
Fixed Charge(Rs./Month)
7.10
+
380.00
off peak
6.10
peak (7 pm to 10 pm)
14.00
+
360.00
+
90.00 [CD]
+
800.00
+
800.00
+
800.00
Bulk Supplies to LECO
L1 - Supply at 400/230 V
L2 - Supply at 11kV & above
Unit Charge
Rs/unit
7.20
+
5.40
+
Street Lighting
@ Rs 7.80 per unit
CD - Contract Demand.
Industrial
Standby
off peak
6.90
peak (7 pm to 10 pm)
15.00
+
30.00
Supply at 400/230V
Contract demand
42 kVA and above
Unit Charge
(Rs/unit)
Industrial
purpose
(Time of day)
Demand Charge
Rs/kVA
240.00
220.00
7.00
POWER TRANSMISSION SYSTEM IN THE YEAR 2005
u
q
Bowatenna
b
c
Ukuwela
Kotmale
Victoria
e Randenigala
f
Rantembe
Inginiyagala
h Polpitiya
i
j
k
l
Laxapana
New Laxapana
Canyon
Samanalawewa
m Udawalawe
n Nilambe
o Wimalasurendra
p
Kukule
Chunnakam
Kelanitissa [Link].
(Steam/GT)
Sapugaskanda
Wind
a
b
n
e
r
x
s
h
v w
i
o
j
k
l
p
m
u Koolair-KKS
v Asia Power
w Lakdhanavi
x Barge Mt.
Power Station
132kV G/S
220/132kV G/S
132kV Line
220kV Line
Not Operative
y ACE-Matara
z ACE-Horana
A AES-KPS [Link].
(Steam/GT)
B Heladhanavi
C ACE-Embilipitiya