PIANC RIS Guidelines 2011
Edition 3
RIS workshop CCNR
PIANC RIS working group
Cas Willems
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Content
Historical context
PIANC RIS Working group
RIS status 2010; technical report on the implementation
Status
RIS related definitions
PIANC RIS guidelines 2011 - Edition 3
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Historical context
European research projects of the European Commission initiated the RIS
development
1999 PIANC Installed a RIS working Group
RIS Guidelines PIANC Edition 1 in 2002
RIS Guidelines PIANC Edition 2 in 2004
Central Commission on Navigation on the Rhine (CCNR), UN ECE and Danube
Commission formalized the RIS guidelines and RIS standards
In October 2005, the EU RIS Framework Directive of the European Union
(2005/44/EC) entered into force.
Applicable to all waterways of the EU of class IV or higher
Binding rules for authorities on the implementation of RIS
River Information Services are in an implementation stage in North and South
America, Europe and Asia
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
PIANC RIS working Group 125
Tasks/results:
Status report on the implementation and operation of River
Information Services
Update of the PIANC RIS Guidelines 2004
Document on RIS definitions
Proposal for a RIS working group on the effects of maritime
concepts as eNavigation, eMaritime and VTM on RIS
RIS working group members from:
Austria, Belgium, China, Czech Republic, Finland, France,
Germany, Hungary, Poland, Russia, Serbia, the Netherlands, USA,
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
RIVER INFORMATION
SERVICES 2010 TECHNICAL
REPORT ON THE
IMPLEMENTATION STATUS
Monday, 24 October
2011
Implementation status
River Information Services = the concept for harmonised information
services to support traffic and transport management in inland
navigation, including interfaces to other transport modes
Traffic management support services:
Fairway Information Services
Traffic Information Services
Vessel Traffic Services
Lock and Bridge management
Calamity abatement Services
Transport management support services are still lacking behind
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Conclusions and recommendations 1
Authorities are mainly responsible for the implementation of RIS
services, users starting with the application of RIS, Industry developing
new systems and applications require stable standards;
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Conclusions and recommendations 1
Authorities are mainly responsible for the implementation of RIS
services, users starting with the application of RIS, Industry developing
new systems and applications require stable standards;
The development, implementation and operational use of RIS and the
interoperability of RIS services and maritime information services will
benefit from developments in the Maritime environment as there are
in special the e-Navigation concept and in Europe the e-Maritime
concept;
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Conclusions and recommendations 1
Authorities are mainly responsible for the implementation of RIS
services, users starting with the application of RIS, Industry developing
new systems and applications require stable standards;
The development, implementation and operational use of RIS and the
interoperability of RIS services and maritime information services will
benefit from developments in the Maritime environment as there are
in special the e-Navigation concept and in Europe the e-Maritime
concept;
Information exchange in an international network requires legislative
measures to provide the data on basis of a need to know principle, but
also to protect privacy and prevent misuse of commercial sensitive
information
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Conclusions and recommendations 2
Traffic management - including Lock and bridge management - in a
transport corridor requires an integrated network-approach where the
information services to the users are an interactive part of voyage and
traffic planning processes.
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Conclusions and recommendations 2
Traffic management - including Lock and bridge management - in a
transport corridor requires an integrated network-approach where the
information services to the users are an interactive part of voyage and
traffic planning processes.
Traffic planning is becoming more and more an essential and explicit
part of RIS Traffic Management.
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Conclusions and recommendations 2
Traffic management - including Lock and bridge management - in a
transport corridor requires an integrated network-approach where the
information services to the users are an interactive part of voyage and
traffic planning processes.
Traffic planning is becoming more and more an essential and explicit
part of RIS Traffic Management.
Support to transport planning requires that the RIS authorities are
willing and authorised to provide information on vessels, their positions,
their voyages and cargo to third parties. There are legal obstructions,
mainly driven by privacy regulations, on the provision of these services.
This hampers the use of RIS information for logistic services and
consequently it hampers the development of related transport services;
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Conclusions and recommendations 3
In Europe, the RIS Directive should cover for Europe the complete
network of navigable fairways with respect to the publication of NtS
and network reference information RIS Index as this is essential for
the visualisation of the NtS information in Inland ECDIS and
implementation of voyage planning applications;
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Conclusions and recommendations 3
In Europe, the RIS Directive should cover for Europe the complete
network of navigable fairways with respect to the publication of NtS
and network reference information RIS Index as this is essential for
the visualisation of the NtS information in Inland ECDIS and
implementation of voyage planning applications;
Good coverage, free availability to fairway users and software
companies, easy accessibility and regular updates of Inland ENCs are
essential as this contributes to safety and efficiency of navigation on the
inland waterway network and is essential for the acceptance of the
user;
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Conclusions and recommendations 3
In Europe, the RIS Directive should cover for Europe the complete
network of navigable fairways with respect to the publication of NtS
and network reference information RIS Index as this is essential for
the visualisation of the NtS information in Inland ECDIS and
implementation of voyage planning applications;
Good coverage, free availability to fairway users and software
companies, easy accessibility and regular updates of Inland ENCs are
essential as this contributes to safety and efficiency of navigation on the
inland waterway network and is essential for the acceptance of the
user;
As inland navigation is an international transport mode, the users and
providers of services and applications would benefit from one single
information entrance to get the fairway information used during
international voyages. The implementation of a (virtual) central FIS
portal for the complete waterway network is very beneficial for users
and industry;
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Conclusions and recommendations 4
Electronic reporting supports safety and calamity abatement services
and as such electronic reporting should be made mandatory in a
stepwise approach;
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Conclusions and recommendations 4
Electronic reporting supports safety and calamity abatement services
and as such electronic reporting should be made mandatory in a
stepwise approach;
In many RIS related processes the implementation and use of Inland
AIS on board as well as on shore is a pre-condition. The full scale
benefit of Inland AIS for RIS services requires a carriage requirement
for Inland AIS;
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Conclusions and recommendations 4
Electronic reporting supports safety and calamity abatement services
and as such electronic reporting should be made mandatory in a
stepwise approach;
In many RIS related processes the implementation and use of Inland
AIS on board as well as on shore is a pre-condition. The full scale
benefit of Inland AIS for RIS services requires a carriage requirement
for Inland AIS;
The basic reference table on location codes, the so called RIS Index, is
the consistent and unambiguous basis for many RIS services. It is
highly recommended to start a procedure to formalize the RIS index as
the mandatory electronic format for geo-related objects.
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
RIS RELATED
DEFINITIONS
RIS related definitions
PIANC document on RIS definitions and abbreviations
Sources:
RIS standards RIS expert groups
IALA, IMO, ISO, WCO, EU, CCNR
Still redundancy in definitions of terms!
Publication on CCNR internet site,
maintenance joint action of CCNR and PIANC
Living document Use and update the report by all concerned
GUIDELINES AND
RECOMMENDATIONS FOR RIVER
INFORMATION SERVICES
EDITION 3
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Why updating the Guidelines ?
Edition 2 based on research
Edition 3 based on the experiences gained and lessons learned in the RIS
implementation processes since 2004.
Detailed description of RIS stakeholders
Amended RIS services
Extension of Traffic Management towards Traffic Planning
RIS Fairway Information Services more focused
RIS key technologies developed and formalised
Standards included
Technological developments included
Reference data, RIS index, Hull data were missing
Relation between RIS key technologies and the RIS services are highlighted
Support to implementation of RIS in a structured approach.
Omissions and corrections
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Status of Edition 3
Guidelines will be published in last quarter 2011
CCNR
Danube Commission
Sava Sommission
UNECE
European Commission
USACE
RIS Services
Edition 2
Edition 3
Table 4.5 RIVER INFORMATION SERVICES
Table 3.3 RIVER INFORMATION SERVICES
Mainly traffic related
1 Fairway information service (FIS)
a) Visual aids to navigation
b) Radiotelephone service on inland waterways
c) Internet service
d) Electronic navigational chart service
2 Trafic information (TI)
a) Tactical traffic information (TTI)
b) Strategic traffic information (STI)
3 Traffic management (TM)
a) Local traffic management (vessel traffic services - VTS)
b) Navigational support (NS)
c) Lock and bridge management (LBM)
4 Calamity abatement support (CAS)
Mainly traffic related
1 Fairway information Services (FIS)
2 Traffic information (TI)
a) Tactical traffic information (TTI)
b) Strategic traffic information (STI)
3 Traffic management (TM)
a) Local traffic management ( VTS)
b) Lock and bridge management (LBM)
c) Traffic Planning TP
4 Calamity abatement support (CAS)
Mainly transport related
5 Information for transport logistics (ITL)
a) Voyage planning (VP)
b) Transport management (TPM
c) Inter-modal port and terminal management (PTM)
d) Cargo and fleet management (CFM)
6 Information for law enforcement (ILE)
7 Statistics (ST)
8 Waterway charges and harbour dues (CHD)
Mainly transport related
5 Information for transport logistics (ITL)
a) Voyage planning (VP)
b) Transport management (TPM)
c) Inter-modal port and terminal management (PTM)
d) Cargo and fleet management (CFM)
6 Information for law enforcement (ILE)
7 Statistics (ST)
8 Waterway charges and harbour dues (CHD)
RIS Key technologies
The RIS Key Technologies have a central position in the services to be
provided in the RIS arena and are depicted in detail;
Inland ECDIS
Electronic Reporting
Vessel Tracking and Tracing (Inland AIS)
Notice to Skippers
RIS references data, Hull data and RIS index are in addition key elements in
the RIS standards and are an important link between the various RIS-services.
Radar, VHF included as related technologies
Open standards
Internet, GSM, GNSS, Aids to Navigation deleted as RIS technologies
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
RIS key technologies and reference data
ERI
NtS
Electronic Reporting
Notices to Skippers
Referencedata Hull-data
(e.g. ENI,
RIS-Index, ADN)
RIS-Index
unique identifier
static vessel data
of
VTT
waterway objects
Vessel Tracking and
Tracing
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
ENC
Inland
ECDIS
Monday, 24 October
2011
RIS Key technologies and RIS Services
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011
Land related
information
Location
related information
Voyage
related
Vessel/convoy
related information
Cargo
related information
Persons on board
related information
Provide origin of voyage
Provide intermediate discharge locations
Provide passage points
Provide destination of voyage
Provide estimated date/ time of arrivals
Provide requested date/time of arrivals
Provide date/time of actual arrivals
Provide estimated date/ time of departures
Provide date/time of actual departures
Provide date/time of requested departures
Provide overall convoy data
Provide origin of cargo
Provide destination of cargo
Provide cargo details
Provide loading unit related information
Provide number of persons (crew, passengers, ) on board
Provide details on persons on board
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Other
x
x
Hull Data
x
x
Provide actual position information of vessels
Provide actual vessel dynamics (i.e. RoT, velocity, CoG, SoG, )
Dynamic vessel data Provide historic position information of vessels
Provide historic vessel dynamics
Provide event based triggers for vessel position
Provide data for the identification of vessels (min. hull data set)
Hull related information
Provide craft certificates
x
x
x
x
RIS-index
x
x
x
x
x
x
x
x
x
x
Waterway charges and harbour dues
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Ref. Data
Statistics ( )
Information for Law Enforcement
Information for Transport Logistics
Provide navigation-based information on fairway and/or navigable
water area (incl. harbours)
Provide meteorological information
Provide water level related information
Provide information on obstructions and limitations
Provide information on navigation rules and regulations
Provide information on land region
Provide information on harbors
Provide information on terminals
Provide information on locks
Provide information on bridges
Services
Calamity Abatement Support
Traffic Management
Infrastructure
related
Vessel
related
Provide basic routing data
2nd level
Waterway
related information
Basic Services
Traffic Information (STI & TTI)
1st level
Information detail
Fairway Information Services
Information
categories
Information category
x
x
x
x
x
x
x
x
x
Replacing
Table 4.6. Functional decomposition of River Information Services
Fairway information service
X
FIS.2
Navigation aids and traffic signs
FIS
FIS.3
Water depths contours in the navigation channel
FIS
FIS.4
Long time obstructions in the fairway
FIS
FIS.5
Actual meteorological information
FIS
FIS.6
Temporary obstructions in the fairway
FIS
FIS.7
Present and future water levels at gauges
FIS
FIS.8
FIS.9
FIS.10
State of the rivers, canals, locks and bridges in the RIS area
Restrictions caused by flood and ice
Malfunctions of aids to navigation
FIS
FIS
FIS
X
X
X
X
X
X
X
X
X
X
X
X
X
FIS 11
Short term changes of lock and bridge operating times
FIS
FIS 12
Short term changes of aids to navigation
FIS
FIS.13
Regular lock and bridge operating times
FIS
FIS.14
Physical limitations on waterways, bridges and locks
FIS
Cargo
shipper
Fleet
manager
Calamity
Centre
FIS
Terminal
operator
Geography of the navigation area and their updates
Waterways
authority
FIS.1
Ship master
Lock/ bridge
operator
FIS
VTS
operator
No.
Information
level
User
RIS service
RIS sub-service
RIS function
Provision of information on:
X
X
X
X
X
X
X
X
X
Chapter on implementation support
Edition 3: Chapter on structured approach of the implementation of RIS
services
Mission Statement
Steps of a structured approach for the implementation of RIS
Legal considerations
Training
Replacing edition 2: Chapter on planning of a RIS
Responsibility
Liability
Planning proces
Training
Stepwise development of RIS
RIS layered implementationmodel
Questions
?
Or later
[Link]@[Link]
PIANC
Navigation, Ports, Waterways
Inland Waterways Commission
Monday, 24 October
2011