Masonry lintels to be painted PT3.
Caulking at curtain wall needs to be cleaning, repaired, several
gaps at sills and head conditions are needing to be cleaned.
A
A
X
X
LWR
LWR
09/23/13
09/23/13
South entry columns are rough need, to be patched and
repainted.
Flat seam metal cladding has finish damage through out.
Finish damage and dents on curtain wall trim through out.
Large scratch in soffit at west end upper roof.
Repair finish at trim on north entry canopy.
Clean capstone along north elevation.
Repair scratched pergola steel at NE entry grid A/16
Install missing door hardware.
Install channels at lower level roller shades.
LWR
09/23/13
A
A
A
A
A
A
A
A
X
X
X
X
X
X
X
X
LWR
LWR
LWR
LWR
LWR
LWR
LWR
LWR
09/23/13
09/23/13
09/23/13
09/23/13
09/23/13
09/23/13
09/23/13
09/23/13
Cost
Item Still Open
Verification Date
Correction Date
Comment Date
Originator
Gutter has low spot in center between grid 11 and 15 along
grid Q.
Verify all reveals painted black.
Pen showing through paint at column grid 9&Q.
Downspouts to be sheet metal not PVC, upper and lower roof.
Comment
Discipline
FSB
Photographs
Room No.
Comment No.
9/23/2013
1
2
3
4
8
9
10
11
12l
13
14
15
Draft Punch [Link]
Page 1
9/24/2013
Frankfurt-Short-Bruza Architects Engineers Planners
PUNCH LIST
DRAFT / IN PROGRESS
Chickasaw Nation Visitor Center
LWR
LWR
LWR
LWR
LWR
LWR
LWR
LWR
LWR
LWR
LWR
09/23/13
09/23/13
09/23/13
09/23/13
09/23/13
09/23/13
09/23/13
09/23/13
09/23/13
09/23/13
09/23/13
A
A
A
A
X
X
X
X
LWR
LWR
LWR
LWR
09/23/13
09/23/13
09/23/13
09/23/13
A
A
A
A
A
A
A
X
X
X
X
X
X
X
LWR
LWR
LWR
LWR
LWR
LWR
LWR
09/23/13
09/23/13
09/23/13
09/23/13
09/23/13
09/23/13
09/23/13
Cost
X
X
X
X
X
X
X
X
X
X
X
Item Still Open
Verification Date
A
A
A
A
A
A
A
A
A
A
A
Correction Date
Originator
Comment Date
FSB
Comment
Discipline
Photographs
Room No.
Comment No.
9/23/2013
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Replace damaged ACT at open office area.
Men's 110, remove caulk at sprinkler cover.
Investigate water stain on ceiling tile at door 114A.
Clean glue on carpet in conf room.
Repair finish on interior portions of curtain wall through out.
Clean trim ring on lights at coffee bar.
Water connection for coffee maker missing.
Housing at coffee bar water cooler damaged.
Repair drywall in video room.
Elevator not operational, not punched.
Standards in gift shop millwork not flush with face of millwork.
Edge band missing at wood ceiling in gallery.
Install keyboard tray and monitor housing at info desk.
Sealant at gallery floor has gaps, repair.
Trim rings in the bottom of gallery lights not centered in fixture.
Overhead door at gift shop hits housing when moving.
Missing tile at diffuser, south wall gallery.
Edges of roller shades have roughly cut edges.
Roller shades have paint on them.
Display system missing from south wall in gallery.
North vestibule doors don't fully close.
Trim missing at inside corner curtain wall in north vestibule.
Draft Punch [Link]
Page 2
9/24/2013
Frankfurt-Short-Bruza Architects Engineers Planners
PUNCH LIST
DRAFT / IN PROGRESS
Chickasaw Nation Visitor Center
LWR
LWR
LWR
09/23/13
09/23/13
09/23/13
LWR
09/23/13
A
A
X
X
LWR
LWR
09/23/13
09/23/13
A
A
A
X
X
X
LWR
LWR
LWR
09/23/13
09/23/13
09/23/13
09/23/13
X NOG
Cost
X
X
X
Item Still Open
Verification Date
A
A
A
Correction Date
Originator
Comment Date
FSB
Comment
Discipline
Photographs
Room No.
Comment No.
9/23/2013
38
39
40
41
42
43
44
45
46
47
48
49
50
51
Kiosk floor boxes not correctly located.
Conceal sprinkler pipe above north vestibule.
Flat seam metal cladding not correctly installed in south
vestibule.
Flat seam metal cladding not correctly installed at exterior
corner grid B.4/8.5
South entry exterior needs to be re-painted.
Joints at AESS very rough inside and outside of south
vestibule, repair.
Rotate lights at north entry to be vertical.
Stripe parking stalls.
Provide mini blind in receiving room.
Verify that the installation (fittings) of the low voltage
transformer serving the sign lighting is suitable for outdoor. If
not, install the transformer in a NEMA 3R enclosure.
Complete installation of the storm water/irrigation system
pump wiring.
Verify that the roof mounted air terminals are not painted.
All electrical equipment shall have identification label with
name and voltage rating information.
All interior lighting automatic controls (except rooms 106 and
107) wiring shall be corrected, so that the light fixtures could
be turned off manually using the single pole switch.
Draft Punch [Link]
Page 3
09/23/13
E
E
X NOG
X NOG 09/23/13
09/23/13
X NOG
09/23/13
X NOG
9/24/2013
Frankfurt-Short-Bruza Architects Engineers Planners
PUNCH LIST
DRAFT / IN PROGRESS
Chickasaw Nation Visitor Center
Cost
Item Still Open
Verification Date
Correction Date
Comment Date
Originator
FSB
Comment
Discipline
Photographs
Room No.
Comment No.
9/23/2013
52
53
54
55
56
57
58
59
60
61
62
63
Provide a copy of the lightning protection system UL master
label certification report.
Hide sprinkler piping located above vestibule 201.
Provide head guards on sprinklers in gray water storage area
and verify head guards are on every sprinkler in mechanical
space 113B. Missing on at least one sprinkler.
Complete installation of fire department connection (FDC).
Provide notification devices in men 110 and women 111 as
required by NFPA 72.
Provide notification device in break 215.
Patch and paint ceiling around fire protection equipment in
rooms 106 and 107 where hole was not cut correctly.
Provide device in shower 109 as required by NFPA 72.
Fire alarm system is currently in trouble alarm. Correct
deficiencies causing the trouble condition.
Incorporate all changes from PR #014.
Architect must witness all testing for fire suppression and fire
alarm per the spec.
Once completed, submit all test reports for fire alarm and fire
suppression. Include backflow preventer forward flow test, and
Contractor's Underground Material and Test Certificate among
others.
Draft Punch [Link]
Page 4
09/23/13
E
FP
X NOG
X CAN 09/23/13
FP
FP
X
X
CAN 09/23/13
CAN 09/23/13
FA
FA
X
X
CAN 09/23/13
CAN 09/23/13
FA
FA
X
X
CAN 09/23/13
CAN 09/23/13
FA
FA
X
X
CAN 09/23/13
CAN 09/23/13
FA, FP
CAN 09/23/13
FA, FP
CAN 09/23/13
9/24/2013
Frankfurt-Short-Bruza Architects Engineers Planners
PUNCH LIST
DRAFT / IN PROGRESS
Chickasaw Nation Visitor Center
Cost
Item Still Open
Verification Date
Correction Date
Comment Date
Originator
FSB
Comment
Discipline
Photographs
Room No.
Comment No.
9/23/2013
Draft Punch [Link]
Page 5
9/24/2013
Frankfurt-Short-Bruza Architects Engineers Planners
PUNCH LIST
DRAFT / IN PROGRESS
Chickasaw Nation Visitor Center
Cost
Item Still Open
Verification Date
Correction Date
Comment Date
Originator
FSB
Comment
Discipline
Photographs
Room No.
Comment No.
9/23/2013
Draft Punch [Link]
Page 6
9/24/2013