Factory Capacity Planning for Sewing Lines

The factory has 8 sewing lines with 25 machines each, for a total of 200 machines. With each machine working 10 hours per day, the total daily capacity is 2000 hours. If each machine produces one style of shirt in 25 minutes, running at 50% efficiency the daily production would be 2400 pieces. For accurate production planning, it is important to consider the capacities of all related processes like cutting, finishing, washing, and value-added jobs, not just the sewing capacity, to avoid missed deadlines.

Uploaded by

dharmaraj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
166 views1 page

Factory Capacity Planning for Sewing Lines

The factory has 8 sewing lines with 25 machines each, for a total of 200 machines. With each machine working 10 hours per day, the total daily capacity is 2000 hours. If each machine produces one style of shirt in 25 minutes, running at 50% efficiency the daily production would be 2400 pieces. For accurate production planning, it is important to consider the capacities of all related processes like cutting, finishing, washing, and value-added jobs, not just the sewing capacity, to avoid missed deadlines.

Uploaded by

dharmaraj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

For Example: Suppose a factory has 8 sewing lines and each line has 25 machines.

Total 200
machines and working shift is 10 hours per day. Total factory capacity per day is 2000 hours
(200 machines * 10 hours). If factory is producing only one style (Shirt) of SAM 25 minutes and
used all 200 machines daily production capacity at 50%
= (2000*60/25)*50% Pieces
= (2000*60*50) / (25*100) Pieces
= 2400 Pieces
[Note: Production will vary according to the line efficiency and during learning curve or in the
initial days when style is loaded to the line]
Production (capacity) planning is normally done based on sewing capacity. Having knowledge of
the capacity in other processes (internal or external) is also very important. Otherwise planner
may fail and will not be able to meet the dead line. Other departments such as Cutting room
capacity, Finishing room capacity, Washing Capacity and capacity of the value added jobs.