National Highways Authority of India
Project: Six laning of Chilkaluripet - Nellore section of NH-5 from km 1182.802 to km 1366.547 (length-183.620 km) in the State of Andhra Pradesh under NHDP Phase
project on DBFOT Pattern.
Section : 1 A , 1182+802 Km to 1251+000 Km
Concessionaire : Simhapuri Expressways Limited
EPC : -BSCPL Infrastructure LTD.
Independent Engineer : ICT & SNC LAVA
PMC: Feedback Ventures
CONCRETE MIX DESIGN TRIAL SUMMARY
Grade of Concrete : M50PSC
Brand of Cement : Jaypee OPC 53 grade
Coarse Aggregate : BSCPLIL Crusher, Bodduvanepalem
Fine Aggregate :Crushed Stone Sand (Wa
Admixture : FAIRFLO RMC M,FAIRMATE
SL.N
O.
Type of material
Trial No.I
Trial [Link]
Trial [Link]
Trial [Link]
Cement (Kg/m3)
490
490
490
500
W/C
0.40
0.40
0.35
0.35
Water (Kg/m3)
196.0
196.0
171.5
175.0
16 mm (Kg/m3)
638.2
666.7
660.6
683.5
10 mm (Kg/m3)
638.2
666.7
660.6
683.5
Sand (Kg/m3)
662.3
604.7
685.6
620.0
Admixture (%)
0.80
1.00
1.20
1.20
Initial Slump (mm)
140
150
170
180
Final Slump after 60min. (mm)
65
75
140
145
10
Final Slump after 90min. (mm)
50
60
80
90
11
3 days Target compressieve Strength (N/mm2)
30.44
31.26
33.84
35.02
12
7 days Target compressieve Strength (N/mm2)
44.58
45.44
48.29
50.37
13
28 days Target compressieve Strength
(N/mm2)
59.66
60.43
64.59
66.12
14
Observations
Required Slump & Strength Required Slump achieved,
Required Slump & Strength
Required Slump & Strength
not achieved, Mix is not
Strength not achieved, Mix
achieved, mix is more
achieved, mix is cohesive
much cohesive
is not much cohesive
cohesive
Remarks:- Trial-IV is conforming to the specification Requirements.
For The Contractor
For The Concessionaire/PMC
For The Independent Engineer
r NHDP Phase V to be executed as BOT (Toll)
T & SNC LAVALIN (JV)
ck Ventures
Stone Sand (Washed)
C M,FAIRMATE,Chennai
Specification
Requirements
Remarks
_
Max.0.40
_
_
_
_
_
_
_
75-125
31.50
47.25
63.00
For The Contractor
For The Concessionaire/PMC
For The Independent Engineer