Bridge Design for Engineers

This bridge project involves the design of 10 parallel girders to support a 30m bridge span carrying HS20 truck loading. Key details include a 15m clear width, 0.2m thick concrete slab, and A992M steel for the girders with Fy=345MPa. The summary calculates key design values like the maximum factored moment of 4195kN-m/m, chooses a W1000x371 girder section to resist this loading, and verifies the section satisfies strength and serviceability limits.

Uploaded by

shamsukarim2009
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views5 pages

Bridge Design for Engineers

This bridge project involves the design of 10 parallel girders to support a 30m bridge span carrying HS20 truck loading. Key details include a 15m clear width, 0.2m thick concrete slab, and A992M steel for the girders with Fy=345MPa. The summary calculates key design values like the maximum factored moment of 4195kN-m/m, chooses a W1000x371 girder section to resist this loading, and verifies the section satisfies strength and serviceability limits.

Uploaded by

shamsukarim2009
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Bridge Engineering Project

Information given:

Bridge Span L = 30m


Clear Width = 15m
Live Load = HS20/4.27m
Sc/c =1.85m
Wcu = 24KN/m3
Wws = 23KN/m3
Fy = 420Mpa
Fc = 35Mpa
Wearing surface thickness = 0.07m
Steel type used for (W) structural shape A992M: Fy = 345Mpa, Fu =
448Mpa
The bridge will consist of 10 parallel girders as shown.
Design to be based on 2x106 cycles of loading.

Design Procedure
Slab thickness:
S+ 3.048
30

min h =

0.165m

where S= Sc/c= 1.85

= 0.163 < 0.165 use h =0.2m


Assume girder weight and diaphragms = 1155N/m
WDC = 0.2*24 = 4.8KN/m2
WDC = 4.8*1.85 + 1.155 = 10KN/m
WDW =0.07*23 = 1.61KN/m2
WDW = 1.61*1.85 = 3KN/m
Moments calculation :
10302
MDC =
= 1125KN.m/m
8

MDW =

330
8

Load fraction =

= 337.5KN.m/m
1.85
1.6764

= 1.1

P16000= 1.1 *71.17 = 78.3KN


P4000= 1.1 *17.8 = 19.6KN

+ MRR = 0
19.6 * 10.24 + 78.3 *14.51 + 78.3 * 18.78 RL * 30 = 0

RL = 93.6KN
Max. moment at 0

+ Mo = 0
Mmax + 78.3 * 4.27 93.6 * 15.49 = 0
MLL = Mmax = 1116KN.m/m
A reduction of 0.75 because of 4 lanes
MLL = 0.75 * 1116 = 837KN.m/m
I=

15.24
L+38

15.24
30+ 38

= 0.224 0.3 ok

IM = 0.224 * 837 = 187.6


Mut = 1.25 * 1125 + 1.5 * 337.5 + 1.75(1116 + 187.5 ) = 4195KN.m/m
W- section is compact because of shear connectors so Lb < Lp
Mn = Mp = Fy * Zx , b = 0.9
Vu = 0.6 * Fy * Aw

Vu = 0.9(0.6*Fy*Aw)

Zx =

4195 x 10
0.9345

= 13506x103 mm3

Choose W1000x371 with Zx = 18400 mm3 , Ix = 8160x106 mm4

Checking section for shear

+ MRR = 0
19.6 * 21.46 + 78.3 * 25.73 + 71.17 * 30 RL * 30 = 0
RL = 152.35KN = VLL
IVLL = 0.224 * 152.35 = 34.13KN
VDC =
VDW =

W DC . L
2

W DW . L
2

1030
2

330
2

= 150KN
= 45KN

Vut = 1.25 * 150 + 1.5 * 45 + 1.75 (152.35 + 34.13 ) = 581.34


KN
Vut 0.9(0.6*Fy*Aw) = 0.9(0.6*345*19.1*1000) = 3558 KN
Where Aw = tw*d
Vut 3558 KN so section is satisfactory to resist shear force

Check Serviceability
Allowed deflection =

30000
800

= 37.5mm

Overall depth of composite section = 0.04*L = 0.04*30 =1200mm satisfactory