Price List
Ref Code
Trade Heading:
Name : PCK1
Item Description
Unit
Rate
O - Labour Rates
Mark
Supp
Last
Up %
Code
Updated
(Continued)
Item
O079
Allow for mobilisation of labour, plants and
hydraulic hammer piling equipment to site,
moving around and demobilisation from site
Handle, sling and pitch initial and extension
vertical piles not exceeding 12m long
Handle, sling and pitch initial and extension
raked 1:4 piles not exceeding 12m long
Drive vertical pile to the required depth
O080
18,000.00
16/12/2008
no
64.00
16/12/2008
no
80.00
16/12/2008
45.00
16/12/2008
Drive raked 1:4 piles to the required depth
60.00
16/12/2008
O081
Fillet weld vertical extension pile joints
no
97.50
16/12/2008
O082
Cut off piles to the required level and roughen
inner surface of pile
Provide labours, plants, temporary staging,
kentledge, testing equipment and load 500mm
diameter test pile to 1200KN
Subsequent load test
no
120.00
16/12/2008
no
15,000.00
10/12/2008
no
10,000.00
10/12/2008
Item
14,666.67
23/12/2008
no
33.20
23/12/2008
13.93
23/12/2008
no
36.00
23/12/2008
Cut off pile head, strip concrete and exposed
reinforcement to a length of 600mm including
bending and binding exposed reinforced rods to
the reinforcement in the pile cap
Supply and fix 'concrete plug'
no
39.00
23/12/2008
no
70.00
23/12/2008
Provide all equipments, hydraulic jack,
deflection gauge, kentledge and other related
items for initial load testing to a vertical load of
130 ton or 1300KN
Subsequent load test
no
13,333.33
23/12/2008
no
6,933.33
23/12/2008
40,000.00
23/12/2008
40.00
23/12/2008
no
27.67
23/12/2008
no
37.50
23/12/2008
no
14,500.00
23/12/2008
O076
O077
O078
O083
O084
OO05
O085
O086
O087
O088
O089
O090
O091
O092
OO06
O093
O094
O095
O096
O097
CHEW FU KEONG
350mm diameter prestressed spun concrete
pile
Allow for mobilisation of labour, plants and
hydraulic hammer piling equipment to site,
moving around and demobilisation from site
Handle, transport and pitch initial and extension
pile not exceeding 12m long
Drive initial and extension pile to the required
depth
Fillet weld pile joint
300mm diameter prestressed spun concrete
pile
Allow for mobilisation of labour, plants and
jacked -in piling equipment to site, moving
around and demobilisation from site
Handle, transport, pitch and drive initial and
extension pile to the required depth
Fillet weld pile joint
Item
Cut off and remove surplus length and strip off
pile head, bend back reinforcement for
connection
Initial pile test to 1100KN
Page :
of
15
Date of Printing: 21/Jul/11