Guidelines for Student Projects , Lecture notes, slides 1- 8
www.myreaders.info/ , RC Chakraborty, e-mail
[email protected] , Feb 27, 2010
www.myreaders.info/html/projects.html
RC
www.myreaders.info
Guidelines for Student Projects
Project
Title,
study,
Scope/
Objectives, Requirement Analysis , Activity Time Schedule, Detail
Design,
Implementation
Introduction,
Requirements,
Feasibility
and Testing , Project Completion Report.
Here students are in final year of B.Tech course in Computer Science &
Engineering. The projects are of 20 to 30 credits. The duration for the project
is one year. It is preferred that a project is implemented by team of two
students, but if necessary
it
may be implemented by one or three
students,
that depends on its scope, varied technology and the volume of work.
1. Title of the project
[Start time T0 + 1 week]
This should be carefully decided by the student after discussing with the
project supervisor or the guide.
The
student
and
guide
are
assumed
to
be
aware
about
general
requirements for the academic need, the current technological pursuits
and the customers/market need or the requirements.
This title may slightly change during or after the completion of the
project feasibility study (section-6).
2. Introduction
[Start of T0 + 2 week]
Explain the relevance and importance of the project :
Write a brief (1 or 2 pages) introduction of the project explaining its
relevance and importance.
Briefly
mention why this project, what exists now, what is required and
what would be realized as end product.
Mention briefly about : technology, models, processes, testing, expected
performance and limitations.
Write about the usages and the benefits.
Ch
ak
ra
bo
rty
,w
w
w
.m
yr
ea
de
rs
.in
fo
RC
3. Requirements
[Start of T0 + 3 week]
The requirements come or taken or generated from users. Here it is
from academic need.
Based
on
the
academic
needs,
the
current
technological
pursuits
and
finding or knowing what the customers/markets need or require, write in
steps the project requirements.
The requirements are expressed in simple language, understandable
by one and all people and certainly not only by subject specialists.
Avoid
using
any
technical
jargons
that make sense to only few
individuals.
Write about 10 or 15 important requirements and put them in order
according to their importance or preference based on some criteria.
Mention how well the end product would be matured, realized and usable.
Remember that each of these requirements are to be later analyzed so
as to generate general design inputs. From these general design inputs,
the designers would generated detail technical design specifications at
system / subsystem level.
Ch
ak
ra
bo
rty
,w
w
w
.m
yr
ea
de
rs
.in
fo
RC
4. Feasibility study
The
general
[Start of T0 + 5 week]
requirements
were
listed
in
project
must
be
section-3
and
therefore
the
feasibility study may start.
The
feasibility
study
of
completed
within
weeks,
considering all aspects of the project mentioned below.
(a) Preliminary work done : Write if any related laboratory experiment
performed in previous semesters? Write if any related courses/study done
in the previous or current semester?
(b) Resources available (RA) : Indicate the desired resources within or
in
other laboratories within the institute in terms of inputs, hardware systems,
software tools, test data, test facility, integration and demonstration facility.
(c) Confidence Factor (CF): Mention your confidence in exploiting the
above mentioned resources.
(d)
Capability
Index
(CI)
Mention
your
capability
to
synergies
the
resources necessary but not available at your work place.
(e)
Relative
Significance
Factor
(RSF)
Mention
about
the
analysis
performed in finding relative importance of a particular technology for a
specific subsystem. Similarly do for all major subsystems.
(f) Viability Index (VI):
Derive or explain for each technology the Viability
Index from CI and RSF.
(g) Relative Importance Factor (RIF) :
Assign to indicate or explain
that
some subsystem are important compare to others.
(h) System Integration factor (SIF) : Assign or explain your ability
to
integrate subsystem for realizing system.
(i) System Realizeability Index (SRI) : Finally calculate or explain System
Realizeability
Index
which
is
measure
of
successful
completion
of
system development.
(j) Inadequacy parameter (IP) :
The word inadequacy means insufficiency,
lack or shortfall. For a technology IP = (1- CI) RSFav .
The satisfactory completion of a project requires :
Resources Available (RA) :
High
Capability Index (CI) : High
Confidence Factor (CF): High
Inadequacy Parameter (IP) : Low
Ch
ak
ra
bo
rty
,w
w
w
.m
yr
ea
de
rs
.in
fo
RC
5. Scope / Objectives: [Start of T0 + 9 week]
By
doing
reduced.
the
project
feasibility,
the
uncertainties
and
ambiguities
The team is now definite about Resources, Confidence,
are
Viability,
Realizeability, Inadequacy and many such factors.
Set clearly the project objectives considering the following :
the project start and completion date : time two semesters,
the number of personnel/work force : one, two or three students,
the number of credits allocated : say 20 credits,
the quality or
standard : 7th and 8th semesters of B.Tech. course.
Write very clearly in 1, 2, 3 or more steps the scope/objectives set for
the project. The objectives must reflect or address to what exactly is
proposed to implement.
(While writing the scope , use technical terms like :
input and outputs,
simulation, models, techniques, processes, algorithms, hardware systems,
software
tools,
fabrications,
coding,
languages,
implementation,
operating
integration,
test
systems
and
platforms,
methods,
test
standards,
accuracy, reliability, installation etc.)
At this stage the Title of the project and its Scope/Objectives are usually
agreed and frozen and will not change under normal situation.
Ch
ak
ra
bo
rty
,w
w
w
.m
yr
ea
de
rs
.in
fo
RC
6. Requirement Analysis [Start of T0 + 10 week]
The
general
requirements
were
listed
in
section-3.
To
requirements the feasibility study of project was completed
meet
in
these
section-4.
The scope/objective of the project have been frozen in section-5.
Now analyze these requirements one by one so as to generate general
design inputs. Within 4 weeks, the requirement analysis must evolve and
culminate into :
The understanding of over system functioning.
The Identification of all standalone or separable functions that may
be accomplished as subsystem level task.
Identify technologies and group then in to tasks they are to perform.
Identify the critical technologies if any ?
Conceptualize, an
over all system level block schematic indicating
all identified subsystems and their input/output need.
Indicate of over all system functionality considering the subsystems
level tasks.
Prepare
list
of
hardware
systems,
peripheral
devices,
interfaces,
displays, computing and network environment.
Prepare a list of software, operating systems, compilers, assemblers,
interpreters, loaders, drivers, language support
Prepare a list of application software, case tools, simulators, GUI,
databases, visualization and graphics support.
Listing of buyer's specifications of the hardware including peripheral
devices, interfaces even if they are not required to buy but used.
Listing of I/O specification of
the software
packages even if they are
not required to buy but used.
Listing of test data at the inputs, type of tests to be performed
during development and the making of the subsystems, and tests
required during runtime or execution.
Conclude the requirements : Highlight what is already available and
what will be newly created or required for the timely completion of the
project. Formulate general design inputs.
Ch
ak
ra
bo
rty
,w
w
w
.m
yr
ea
de
rs
.in
fo
RC
7. Activity Time Schedule [Start of T0 + 14 weeks]
The way, method or the manner in which the project will be executed.
Draw a suitable representation indicating the manner in which the project
would be executed - from the start to the completion date.
The representation is usually a PERT chart; the X- axis shows time
(from start to completion) and the Y- axis shows all project activities.
The time resolution of the X-axis can be monthly but for a small
duration (about one year) project the time resolution can be weekly.
The
activities
listed
on
Y-axis
includes
all
important
activities
of
the project.
The body of the chart illustrates the start and completion date of
each activity. It should clearly indicate the spread of each activity,
their relative start and completion time, and how many tasks would
run in parallel.
The project activities include
Project start date, deciding the project : Title
Relevance and importance of the project : writing Introduction
Framing of project :
Requirements
Study about Project :
Feasibility study
Freezing of Project :
Scope/Objectives
General design inputs :
Requirements Analysis
System and subsystem level working : design
Convert all designs into programs :
Implementation
Performance evaluation at system/subsystem level : Testing
Documentation of all above activities :
Project report
The activity time schedule must reflect all such things.
By this time, about
The
remaining
one quarter of the project duration (14 weeks)
time
completion of project
is
for
detail
design,
implementation,
is over.
testing
and
report. The documentation is a continuous process
from day one, the start of the project.
Ch
ak
ra
bo
rty
,w
w
w
.m
yr
ea
de
rs
.in
fo
RC
8. Detail Design [Start of T0 + 15 weeks]
Start of system and subsystem level detail design that continues for 6 weeks.
Typically a detail design includes :
Design
a
detail
from
the
conceptual
architectural
layout,
level
block
indicate
schematic
every
(in
subsystem
section-6),
and
within
them identify every small entity their input/output and design.
Draw functional block schematics, data flow diagrams for every small
entity, subsystem, overall system and other considerations if any.
Write the algorithms, the pseudo code for every function calls, the
subroutines, and the recursions.
End of 20 weeks.
Here comes the semester break.
Ch
ak
ra
bo
rty
,w
w
w
.m
yr
ea
de
rs
.in
fo
RC
9. Implementation and Testing [Start of T0 + 21 week]
The programming tools and languages were decided in section-6. The
next 18 weeks are for the implementation of the detail design done in
section-8 so as to realize the end product, the Scope/Objectives of the
project stated in section-5.
Start of software coding.
Convert all above designs (at the entity, subsystems, system levels)
into programs
Execute or Run the programs step by step for each module, subsystem
or any other entity considered necessary for the purpose of debugging
and performance evaluation and design validation.
Finally integrate all subsystems so as to realize the over system.
Perform all system level test, evaluate the results
and compare with
the project scope/objects (section-5) and the requirements (section-6).
10. Project Completion Report
[Start of T0 + 39 week]
The time left for the completion of the project is 2 weeks.
Complete all documentation.
Make the Project Report ready for submission.
Note : The time allocations for completing different activity
may vary by
weeks from one project to another, but the total time remains same.
few