0% found this document useful (0 votes)
878 views5 pages

Time and Work Concepts Explained

1. The document discusses time and work formulas, including how to calculate the time it would take individual workers or groups of workers to complete a job. 2. It also introduces the efficiency method, which treats work as a percentage that can be completed each day, rather than a numerical value. 3. Several examples are provided that demonstrate calculating time to complete work for individuals and groups using both the conventional and efficiency methods.

Uploaded by

Manish Anand
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
878 views5 pages

Time and Work Concepts Explained

1. The document discusses time and work formulas, including how to calculate the time it would take individual workers or groups of workers to complete a job. 2. It also introduces the efficiency method, which treats work as a percentage that can be completed each day, rather than a numerical value. 3. Several examples are provided that demonstrate calculating time to complete work for individuals and groups using both the conventional and efficiency methods.

Uploaded by

Manish Anand
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd

TIME AND WORK

IIMPORTANT FACTS AND FORMULAE

1. If A can do a piece of work in n days, then A's 1 day's work = (1/n).

2. If As 1 day's work = (1/n),then A can finish the work in n days.

3. A is thrice as good a workman as B, then:


Ratio of work done by A and B = 3 : 1.
Ratio of times taken by A and B to finish a work = 1 : 3.
So now lets move on to the Faster method i.e efficiency method.

In efficiency method the Work is not treated in numerical value, Like in


Conventional method the work is 1 but here the work is treated as
percentage.
So by common sense the work is always treated as 100%
So when i say a person completes a work in 15 days it means he will do
100/15 % work in 1 day i.e 6.66% work in 1 day
If another person does the work in 30 days that means he will do 3.33% work
in 1 day.
And together they will do 6.66 + 3.33 = 9.99 or 10% work in one day So in
how many days they will do the complete work, that will be 100/10 = 10
days.

SOLVED EXAMPLES

Ex. 1. Worker A takes 8 hours to do a job. Worker B takes 10 hours to do the same
[Link] long should it take both A and B, working together but independently, to do the
same job? (

Sol. As 1 hour's work = 1/8

B's 1 hour's work = 1/10


(A + B)'s 1 hour's work = (1/8) +(1/10)=9/40

Both A and B will finish the work in 40/9 days.

Faster method i.e efficiency method:


Efficiency of A =100/8 = 12.5%
Efficiency of B = 100/10 = 10%
Efficiency of A & B Together = 12.5+ 10 = 22.5%
So the time taken by A & B together to Complete the work will be 100/22.5=
4.4 Days.

Ex. 2. A and B together can complete a piece of work in 4 days. If A alone can complete the
same work in 12 days, in how many days can B alone complete that work? (Bank P.O.
2003)

Sol. (A + B)'s 1 day's work = (1/4). A's 1 day's work = (1/12).

B's 1 day's work =((1/4)-(1/12))=(1/6)

Hence, B alone can complete the work in 6 days.

Ex. 3. A can do a piece of work in 7 days of 9 hours each and B can do it in 6 days

of 7 bours each. How long will they take to do it, working together 8 hours a day?

Sol. A can complete the work in (7 x 9) = 63 hours.


B can complete the work in (6 x 7) = 42 hours.

As 1 hour's work = (1/63) and B's 1 hour's work =(1/42)

(A + B)'s 1 hour's work =(1/63)+(1/42)=(5/126)

Both will finish the work in (126/5) hrs.


Number of days. of (42/5) hrs each =(126 x 5)/(5 x 42)=3 days

Ex. 4. A and B can do a piece of work in 18 days; Band C can do it in 24 days A and C can
do it in 36 days. In how many days will A, Band C finish it together and separately?

Sol. (A + B)'s 1 day's work = (1/18) (B + C)'s 1 day's work = (1/24)


and (A + C)'s 1 day's work = (1/36)
Adding, we get: 2 (A + B + C)'s 1 day's work =(1/18 + 1/24 + 1/36)
=9/72 =1/8

(A +B + C)'s 1 day's work =1/16

Thus, A, Band C together can finish the work in 16 days.


Now, As 1 day's work = [(A + B + C)'s 1 day's work] - [(B + C)'s 1 day work:
=(1/16 1/24)= 1/48

A alone can finish the work in 48 days.


Similarly, B's 1 day's work =(1/16 1/36)=5/144

B alone can finish the work in 144/5=28 4/5 days

And Cs 1 day work =(1/16-1/18)=1/144

Hence C alone can finish the work in 144 days.

Ex. 6. A is twice as good a workman as B and together they finish a piece


in 18 days. In how many days will A alone finish the work?
Sol. (As 1 days work):)(Bs 1 days work) = 2 : 1.

(A + B)'s 1 day's work = 1/18

Divide 1/18 in the ratio 2 : 1.

:. As 1 day's work =(1/18*2/3)=1/27

Hence, A alone can finish the work in 27 days.

Ex. 6. A can do a certain job in 12 days. B is 60% more efficient than A. How many
days does B alone take to do the same job?
Sol. Ratio of times taken by A and B = 160 : 100 = 8 : 5.
Suppose B alone takes x days to do the job.
Then, 8 : 5 :: 12 : x = 8x = 5 x 12 =x = 7 1/2 days.

Ex. 7. A can do a piece of work in 80 days. He works at it for 10 days B alone finishes the
remaining work in 42 days. In how much time will A and B working together, finish the
work?
Sol. Work done by A in 10 days =(1/80*10)=1/8
Remaining work = (1- 1/8) =7/ 8
Now,7/ 8 work is done by B in 42 days.
Whole work will be done by B in (42 x 8/7) = 48 days.
As 1 day's work = 1/80 and B's 1 day's work = 1/48

(A+B)'s 1 day's work = (1/80+1/48)=8/240=1/30


Hence, both will finish the work in 30 days.

Ex. 8. A and B undertake to do a piece of work for Rs. 600. A alone can do it in 6 days while
B alone can do it in 8 days. With the help of C, they finish it in 3 days. !find the share of
each.

Sol :C's 1 day's work = 1/3-(1/6+1/8)=24

A : B : C = Ratio of their 1 day's work = 1/6:1/8:1/24= 4 : 3 : 1.


As share = Rs. (600 *4/8) = Rs.300, B's share = Rs. (600 *3/8) = Rs. 225.
C's share = Rs. [600 - (300 + 225) = Rs. 75.

Ex. 9. A and B working separately can do a piece of work in 9 and 12 days respectively, If
they work for a day alternately, A beginning, in how many days, the work will be
completed?
(A + B)'s 2 days' work =(1/9+1/12)=7/36
Work done in 5 pairs of days =(5*7/36)=35/36
Remaining work =(1-35/36)=1/36

On 11th day, it is As turn. 1/9 work is done by him in 1 day.

1/36 work is done by him in(9*1/36)=1/4 day


Total time taken = (10 + 1/4) days = 10 1/4days.
Ex 10 .45 men can complete a work in 16 days. Six days after they started working, 30 more
men joined them. How many days will they now take to complete the remaining work?

(45 x 16) men can complete the work in 1 day.

1 man's 1 day's work = 1/720

45 men's 6 days' work =(1/16*6)=3/8

Remaining work =(1-3/8)=5/8


75 men's 1 day's work = 75/720=5/48

Now,5 work is done by them in 1 day.


48

5work is done by them in (48 x 5)=6 days.


8 5 8

Ex:11. 2 men and 3 boys can do a piece of work in 10 days while 3 men and 2 boys can do the
same work in 8 [Link] how many days can 2 men and 1 boy do the work?
Soln: Let 1 mans 1 days work = x and 1 boys 1 days work = y.

Then, 2x+3y = 1 and 3x+2y = 1


10 8
Solving,we get: x = 7 and y = 1
200 100

(2 men + 1 boy)s 1 days work = (2 x 7 + 1 x 1 ) = 16 = 2


200 100 200 25
So, 2 men and 1 boy together can finish the work in 25 =12 1 days
2 2

TIME AND WORK
IIMPORTANT FACTS 
 
 AND FORMULAE
1. If A can do a piece of work in n days, then A's 1 day's work = (1/n).
2. I
(A + B)'s 1 hour's work = (1/8) +(1/10)=9/40
Both A and B will finish the work in 40/9 days.
Faster method i.e ef
Adding, we get:  2 (A + B + C)'s 1 day's work =(1/18 + 1/24 + 1/36)
                                    =9/72 =1/8
Now,7/ 8 work is done by B in 42 days.
 Whole work will be done by B in (42 x 8/7) = 48 days.
A’s 1 day's work = 1/80 and B's
75 men's 1 day's work = 75/720=5/48 
Now,5 work is done by them in 1 day.
       48
5work is done  by them in (48 x 5)=6 days