Rev No : 5
F 202.01 : HAZARD IDENTIFICATION, RISK ASSESSMENT
Effective Date : 1/8/2009 AND DETERMINING CONTROL (TYPICAL)
PROJECT TITLE : ____________________________________________________________________________
AIR CONDITION
CONSEQUENCE
RISK RANKING
PROBABILITY
EFFECTS / CURRENT CONTROL PROPOSED CONTROL
NO ACTIVITY /FACILITY HAZARD
CONSEQUENCES MEASURES MEASURES
- Workers stay away from
moving vehicle/ lorry.
Struck by moving part
Loading and unloading material - To control lorries
of vehicle.
speeding at site (max.
15km/h).
Struck/ hit by moving
- Supervised by designated
part of material during
person during shifting of
shifting activity
material.
(manual handling)
- Manual handling/lifting
Spine injury - Improper should be carry out with
method of handling correct method (refer to
method statement
Struck/ hit by moving
- Supervised by designated
part of material during
person during lifting of
lifting activity
material.
(by tower crane)
- Crane must operate by
competent operator.
Falling object (during - Crane inspection before
Stacking/ Storing material.
lifting of material) work commences.
- Workers stay away from
lifting area.
HIRADC Page 1 of 4
CONSEQUENCE
RISK RANKING
PROBABILITY
EFFECTS / CURRENT CONTROL PROPOSED CONTROL
NO ACTIVITY /FACILITY HAZARD
CONSEQUENCES MEASURES MEASURES
- Supervised by designated
person during stacking of
material.
- Routine checking to
Slip/ fall/ collapse of
ensure stability of
material due to poor
material.
material arrangement.
- To ensure material not
obstructing any access
way.
- To provide wedge.
- Manual handling/lifting
should be carry out with
correct method.
- Scaffolding for working
Improper method of
Erection of working platform platform are erecting by
handling activity
experience workers.
- Proper mobile scaffold
i.e. stopper for tyre, G.I
pipe for mobile support.
- Provide proper working
platform for workers.
Workers slip and fall
- Plank min. 600mm wide/
cat walk.
Fabrication of pipe - To ensure hand-tool in
Hit by hand-tool
(Ducting work) good condition
- Provide proper working
platform for workers.
- No worker shall be
Installation of support bracket and
Workers slip and fall allowed to be on the
pipe
working platform while
shifting/ mobilise the
mobile scaffold.
Electrical shock - To ensure power tool in
(drilling activity) good condition before
used.
- Electrical wire shall
hang-up and not obstruct
HIRADC Page 2 of 4
CONSEQUENCE
RISK RANKING
PROBABILITY
EFFECTS / CURRENT CONTROL PROPOSED CONTROL
NO ACTIVITY /FACILITY HAZARD
CONSEQUENCES MEASURES MEASURES
walkway.
Inhalation of cement - Provide dust collector/
dust during drilling dust mask
activity.
- Workers must wear
Painting work Inhalation suitable PPE i.e air
protector etc.
Skin contact with paint/ - Workers must wear
thinner suitable PPE i.e glove.
- Material handling should
be carried out with
Redundant repeated
correct method.
working behavior.
- Take a 2-3 minutes rest
after every 2(two) hours.
Prepared By Reviewed By
Name : Name :
Position : Position :
Date : Date :
GUIDE :
Rev No : 0 HIRARC Page 3
Effective Date : 1 December 2005
1. Rank is referred to the schedule below:
PROBABILITY (P) PRACTICALLLY NOT LIKELY TO COULD OCCUR KNOWN TO OCCUR KNOWN TO BE A
IMPOSSIBLE OCCUR i.e. HEARD OF i.e. HAS HAPPENED COMMON OR
HAPPENING IN THE PAST REPEATING
OCCURANCE
CONSEQUENCE (C) (1) (2) (3) (4) (5)
NEGLIGIBLE
1 2 3 4 5
(1)
MINOR
2 4 6 8 10
(2)
MAJOR
3 6 9 12 15
(3)
CATASTROPHIC
4 8 12 16 20
(4)
Legend :
Low (L, 1 3) Medium (M, 4 8) High (H, 9 20)
CONSEQUENCE SCALE DESCRIPTION INDEX
Catastrophic Fatal, operation/facility failure 4
Major Any injury as listed in Schedule 1 3
NADOPOD
Any incident as listed in Schedule 2
NADOPOD
Any ill health as listed in Schedule 3
NADOPOD
Minor Absent from work for 4 days or less due to 2
injury, disease or poisoning
Any other injury than those listed in
Schedule 1 NADOPOD
Any other incident than those listed in
Schedule 2 NADOPOD
Any other ill health than those listed in
Schedule 3 NADOPOD
Negligible No Lost Time Injury (LTI) 1
First aid and duty
HIRADC Page 4 of 4