Marine Piping Systems: Glassfiber Reinforced Epoxy
Marine Piping Systems: Glassfiber Reinforced Epoxy
Applications
- Salt Water Supply Lines - Sprinkler Systems
Weight Comparison
Green Thread 250 vs. XH Carbon Steel
Weight in kg per 1000 m
Pipe diameter in mm
Joining Systems
Green Thread 175
Straight Socket Joint
Pipe Nominal Nominal Nominal
Size I.D. O.D. Weight
in (mm) in (mm) in (mm) lbs/ft (kg/m)
2 (50) 2.15 (54.6) 2.51 (63.7) 0.9 (1.34)
2 (65) 2.75 (69.1) 3.11 (79.0) 1.2 (1.79)
The adhesive bonded straight socket
3 (80) 3.28 (83.6) 3.66 (93.0) 1.4 (2.08)
4 (100) 4.28 (108.7) 4.66 (118.4) 1.8 (2.68) joint has positive stop lands for
5 (125) 5.20 (132.1) 5.73 (144.9) 2.5 (3.73) precise makeup of piping systems.
6 (150) 6.35 (161.3) 6.80 (172.7) 3.1 (4.61) Pipe is supplied plain end x plain
8 (200) 8.36 (212.3) 8.84 (224.5) 4.3 (4.60) end.
10 (250) 10.36 (263.1) 10.93 (277.6) 6.0 (8.93)
Available in 25-300 mm (1-12 in) for
12 (300) 12.28 (311.9) 12.92 (328.2) 8.3 (12.35)
the following products:
14 (350) 14.04 (356.6) 14.74 (374.4) 10.5 (15.63)
16 (400) 16.04 (407.4) 16.82 (427.2) 13.3 (19.79) Green Thread 175/175-C
18 (450) 17.83 (452.8) 18.68 (474.5) 16.1 (23.96) 250/250-C
20 (500) 19.83 (503.6) 20.77 (527.6) 19.6 (29.17) 250-F/250-CF
24 (600) 23.84 (605.5) 24.94 (633.5) 27.9 (41.52) 250-JF/250-CJF
26 (650) 25.59 (650.0) 26.71 (678.4) 39.0 (58.16)
28 (700) 27.56 (700.0) 28.76 (730.5) 45.0 (67.11)
30 (750) 29.53 (750.0) 30.81 (782.5) 52.0 (77.55)
Tapered Bell and Spigot Joint
32 (800) 31.50 (800.0) 32.86 (834.5) 58.0 (86.49)
36 (900) 35.43 (900.0) 36.95 (938.6) 74.0 (110.35)
Approvals
- Light Weight
- Reduced Maintenance
Fire Resistant
Green Thread 175 and Green Thread 250 systems are fully
Conductive
Continuous conductive filaments are utilized throughout the
vic
, D Spac
lds
pac
ace Ser
s
Ho
s
nks
uct
oom
lds
yS
Requirements Matrix
y A aces
unn , Void
l Sp ion,
o
Ho
r Ta
s
r
arg
ine
s
ate ry Sp
ntro odat
els
ank
according to IMO 753 regulations
rgo
mp
ks
ate
cks
ry C
s
ach
Pip dam
Tan
il T
Ca
Pu
tW
m
gor
De
of C hine
er M
er D
om
eT
ffer
lO
rgo
rgo
llas
-ro
en
Acc
c
Oth
Oth
Fue
Co
Co
Ro
Op
Ma
Ca
Ca
Ba
Cargo (flammable cargos with flash point < 60C (140F))
Cargo Lines 4 4 9
4
Crude Oil Washing Lines 4 4 9 4
Vent Lines 4 4 9
4
Inert Gas
Water Seal Effluent Line 4 1
1 4 1
4 1 4 1
4 1
4
Scrubber Effluent Line 4 4 1
1 4 1
4 1
4
Main Line 4 4 4 6
Distribution Lines 4 4
Flammable Liquids (Flash Point > 60C (140F))
Cargo Lines 3 4 4 4
Fuel Oil 3 4 4 4
Lubricating Oil 4
Hydraulic Oil 4 4 4 4
Sea Water (See Note 1)
Bilge Main and Branches 4 4 4
Non-Essential Systems 4 4 4 4 4 4 4 4 4 4 4
Fresh Water
Cooling Water, Essential Services 4 4 4 4 4 4 4
Condensate Return 4 4 4 4 4 4 4 4
Non-Essential Systems 4 4 4 4 4 4 4 4 4 4
Sanitary / Drains / Scuppers
Deck Drains (internal) 4 4 4 4 4 4 4 4 4
Sanitary Drains (internal) 4 4 4 4 4 4 4 4 4
Scuppers and Discharges (overboard) 4 1,7
4 1,7 4 1,7
4 1,7
4 1,7
4 4 4 4 4 1,7
4
Vent / Sounding
Water Tanks/Dry Spaces 4 4 4 4 4 4 9
4 4 4 4 4
Oil Tanks (flash-point > 60C (140F)) 3 4 4 9
4
Miscellaneous
Control Air 5 5 5 5 5 4 4 4 5 5
Notes:
1. Where non-metallic piping is used, remotely controlled valves are to be provided a the ships side (valve is to be controlled from outside
space). 4 GREEN THREAD
2. Remote closing valves are to be provided at the cargo tanks. Approved Systems
3. When cargo tanks contain flammable liquids with a flash point > 60C (140F). 4 may replace or .
4. For drains serving only the space concerned 4 may replace .
5. When controlling functions are not required by statutory requirements or guidelines 4 may replace . Not Allowed
6. For pipe between machinery space and deck water seal, 4 may replace .
7. Scuppers serving open decks in positions 1 and 2, as defined in Regulation 13 of the International Convention on Load Lines, 1966, should be
throughout unless fitted at the upper end with the means of closing capable or being operated from a position above the freeboard deck
in order to prevent downflooding. Not Applicable
8. For essential services, such as fuel oil tank heating and ships whistle, is to replace 4.
9. For tanders where compliance with paragraph 3(f) of regulation 13F of Annex I of MARPOL 73/78 is required, " " is to replace "4".
SALES OFFICES China
Downhole Solutions
United States Litanghe Road
2700 West 65th Street Xiangcheng Economic Development
Little Rock, Arkansas 72209 Zone
Phone: 501-568-4010 Suzhou, China 215131
Fax: 501-568-4465 Phone: 86 512 8518 0099
Fax: 86 512 8512 0101
Canada
30 Strathlea Crescent SW
Europe Drilling Solutions
Calgary, Alberta Canada T3H 5A8
Phone: 403 660 4131
Obchodna 7
Fax: 403 246 7850 Nesvady 94651
Slovakia
Mexico, Caribbean, Phone: 42 191 836 0122
Central America
Fernando Simoes Barbosa #266 West Africa
Office 1304, P.O. Box 14148
Boa Viagem Chioma Loveday Flats,
Recife, Pernambuco 51020-390 Chief Ogbondas Compound, #105 Engineering and Project Management Solutions
Brazil Woji Road
Phone: 55 81 81312488 Woji, Port Harcourt, RV 500001
Nigeria
Central Asia / Russia Phone: 234 803 338 2623
Microdistrict-13, Bldg-23, Apt. 4 Fax: 215 252 5140
Mangistau Region
Headquarters Aktau, Kazakhstan
Phone: 7 701 5141087
Fax: 7 7292 436176
MANUFACTURING
2425 SW 36th Street FACILITIES Lifting and Handling Solutions
San Antonio, Texas 78237 USA
Phone: 210 434 5043 Middle East, N. Africa, San Antonio, Texas USA
India
Fax: 210 434 7543 Wichita, Kansas USA
PO Box 61335
Jafza View 18, Office 0506 Little Rock, Arkansas USA
Jebel Ali Free Zone
Dubai, United Arab Emirates Sand Springs, Oklahoma USA
Phone: 9714 886 5660 Harbin, China
Fax: 9714 886 5670
Suzhou, China
Production Solutions
Pacific Rim Recife, Brazil
10 Ubi Crescent
#02-93 Ubi Techpark (Lobby E) Sohar, Oman
Singapore 408564
Phone: 65 6842 2293
Fax: 65 6741 2293
National Oilwell Varco has produced this brochure for general information only, and it is not
intended for design purposes. Although every effort has been made to maintain the accuracy and
reliability of its contents, National Oilwell Varco in no way assumes responsibility for liability for any Well Service and Completion Solutions
loss, damage or injury resulting from the use of information and data herein. All applications for the
material described are at the users risk and are the users responsibility.
All brands listed are trademarks of National Oilwell Varco.
fgspipe@[Link] w w w. f g s p i p e . c o m