REDESIGN OF PILE CAP PIER 098 Page 1/2
Project: Motorway M6 (BANG PA IN TO NAKHON RATCHASIMA)
Date: Revision: 1
Designer: Check: Approve:
Proposed Depth and Reinforcement for Footing Pier 098
New Pile Location of Pile Cap for Pier 098
Calculation of Reinforcement Using Strut-and-Tie Model (STM) as per AASHTO LRFD
H= 2.8 m (Footing Depth)
Zeta = 26.96
Ru= 1440 T
Tu= 2831.492 T
Provide [email protected] (Thus Provide 2-Bundle [email protected] Each Direction)
0.75Tn= 2889.375 T