Sample Hse Targets 2011

This document outlines health, safety, and environmental targets and monitoring procedures for a construction site in 2011. It includes 3 main targets: 1) increasing employee awareness of occupational health and safety issues through training, 2) reducing occupational accidents and diseases, and 3) responsible use of environmentally sensitive products. Each target has sub-targets with assigned responsibilities, monitoring periods, time durations, and target achievement ratios to track progress.

Uploaded by

Ridho Sugiharto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
176 views1 page

Sample Hse Targets 2011

This document outlines health, safety, and environmental targets and monitoring procedures for a construction site in 2011. It includes 3 main targets: 1) increasing employee awareness of occupational health and safety issues through training, 2) reducing occupational accidents and diseases, and 3) responsible use of environmentally sensitive products. Each target has sub-targets with assigned responsibilities, monitoring periods, time durations, and target achievement ratios to track progress.

Uploaded by

Ridho Sugiharto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Document No

Issue No
HSE TARGET'S 2011
Issue Date

Page No 1/1

ACTION (actual achieved result-Result will be monitored per RESULT(end of year


NO MAIN TARGET SUB-TARGET MONITORING PERIOD RESPONSIBILITY TIME DURATION TARGET RATIO TARGET RESULT ACHIEVED RATIO
monthly due to monitoring period.) achieved result)

1 2 3 4 5 6 7 8 9 10 11 12

HSE Site Team / Sub-contractor Must be calculated from


At least 1000 hour-man per year, will provide (RESULT/TARGET
Per Month HSE Team / Contractor Site 2011 15% the sub-target, then write
safety training to employees. RESULT)*100
Management here target value

Employees' awareness of Occupational Take heed of the HSE Site Team / Sub-contractor
1 Health, Safety and Environmental Issues basic environmental awareness training of all Per Month HSE Team / Contractor Site 2011 5%
employees Management

HSE Site Team / Sub-contractor


Complete all employees occupatonal trainings
Per Month HSE Team / Contractor Site 2011 5%
under Training Plan
Management

HSE Site Team / Sub-contractor


Ensure the man-loss time under 20 man-day Per Month HSE Team / Contractor Site 2011 10%
Management

HSE Site Team / Sub-contractor


Ensure the money-loss cost under 5.000-TL Per Month HSE Team / Contractor Site 2011 10%
Management

Probably Occupational HSE diseases and


2 accidents

HSE Site Team / Sub-contractor


Provide at least 2 Emergency Drill at site during
Per Month HSE Team / Contractor Site 2011 10%
a year
Management

Provide Chemical leak spill drill at site (stated by HSE Site Team / Sub-contractor
site management and advised for min 2 times Per Month HSE Team / Contractor Site 2011 10%
during a year) Management

Ensure the limits of using dangerous chemical at


least .. Litres (stated by MSDS form due to HSE Site Team / Sub-contractor
flamable, reagent, corrosive material and liters Per Month HSE Team / Contractor Site 2011 5%
value stated by site management using per Management
monthly)

3 Sensitive product for environment

Monitoring the electriycity and water consuption


HSE Site Team / Sub-contractor
(value of consumption will be compare with next
Per Month HSE Team / Contractor Site 2011 10%
year values, for this year target is to record all of
Management
these situation.)

Quantities of HSE Site Team / Sub-contractor


4 hazardous and non-hazardous waste to watch Per Month HSE Team / Contractor Site 2011 10%
Ensure the proper separation of wastes at and episode-based data to create Management
source and disposal to the licence facility

The site monitoring of Occupational Health Monitoring spendings of fit the HSE budget HSE Site Team / Sub-contractor
5 and Safety Performance (HSE Budget also stated by site management Per Month HSE Team / Contractor Site 2011 10%
and value will be compare with next year values) Management