Document No
Issue No
HSE TARGET'S 2011
Issue Date
Page No 1/1
ACTION (actual achieved result-Result will be monitored per RESULT(end of year
NO MAIN TARGET SUB-TARGET MONITORING PERIOD RESPONSIBILITY TIME DURATION TARGET RATIO TARGET RESULT ACHIEVED RATIO
monthly due to monitoring period.) achieved result)
1 2 3 4 5 6 7 8 9 10 11 12
HSE Site Team / Sub-contractor Must be calculated from
At least 1000 hour-man per year, will provide (RESULT/TARGET
Per Month HSE Team / Contractor Site 2011 15% the sub-target, then write
safety training to employees. RESULT)*100
Management here target value
Employees' awareness of Occupational Take heed of the HSE Site Team / Sub-contractor
1 Health, Safety and Environmental Issues basic environmental awareness training of all Per Month HSE Team / Contractor Site 2011 5%
employees Management
HSE Site Team / Sub-contractor
Complete all employees occupatonal trainings
Per Month HSE Team / Contractor Site 2011 5%
under Training Plan
Management
HSE Site Team / Sub-contractor
Ensure the man-loss time under 20 man-day Per Month HSE Team / Contractor Site 2011 10%
Management
HSE Site Team / Sub-contractor
Ensure the money-loss cost under 5.000-TL Per Month HSE Team / Contractor Site 2011 10%
Management
Probably Occupational HSE diseases and
2 accidents
HSE Site Team / Sub-contractor
Provide at least 2 Emergency Drill at site during
Per Month HSE Team / Contractor Site 2011 10%
a year
Management
Provide Chemical leak spill drill at site (stated by HSE Site Team / Sub-contractor
site management and advised for min 2 times Per Month HSE Team / Contractor Site 2011 10%
during a year) Management
Ensure the limits of using dangerous chemical at
least .. Litres (stated by MSDS form due to HSE Site Team / Sub-contractor
flamable, reagent, corrosive material and liters Per Month HSE Team / Contractor Site 2011 5%
value stated by site management using per Management
monthly)
3 Sensitive product for environment
Monitoring the electriycity and water consuption
HSE Site Team / Sub-contractor
(value of consumption will be compare with next
Per Month HSE Team / Contractor Site 2011 10%
year values, for this year target is to record all of
Management
these situation.)
Quantities of HSE Site Team / Sub-contractor
4 hazardous and non-hazardous waste to watch Per Month HSE Team / Contractor Site 2011 10%
Ensure the proper separation of wastes at and episode-based data to create Management
source and disposal to the licence facility
The site monitoring of Occupational Health Monitoring spendings of fit the HSE budget HSE Site Team / Sub-contractor
5 and Safety Performance (HSE Budget also stated by site management Per Month HSE Team / Contractor Site 2011 10%
and value will be compare with next year values) Management