PROPOSED RESIDENTIAL DEVELOPMENT AT
MOOSAPET, HYDERABAD
DESIGN CALCULATIONS
FOR PUMPS & WTP
Clients : M/S Cybercity Builders & Developers Pvt ltd.
Hyderabad
Architects : M/S Genesis Planners Pvt Ltd.
Hyderabad
PHE Services : M/S SampathKumar Associates Pvt Ltd
Consultants Bengaluru.
1.0 PREAMBLE
M/s. Cyber city Developers is coming up with Rainbow vistas proposed Residential Building at
Hyderabad. The proposed project comprises of 13 Blocks namely Block E, F, G, H, I, J, K, L, M, N, O, P &
Q.
Blocks E, F, G, H, I, J, L, M, N, O, P & Q comprises of 2 Basements, ground and 19 upper floors.
Block K comprises of 2 Basements, ground and 25 upper floors.
Block K water supply pumps to be provide separate set of pumps due to increasing of floors
Water demand is calculated based on the guidelines of NBC.
Water demand calculation for E, F, G, H, I, J, L, M, N, O, P & Q block
No of Apartments 2410 Units
Occupancy 5 Persons per apartments
No of Persons 2410 x 5 = 12050 persons
Domestic water demand in lpcd 80
Flushing water demand in lpcd 55
Domestic water reqt in liters/day 4340 x 80 = 9,64,000
Flushing water reqt in liters/day 4340 x 55 = 6,62,750
Total water reqt in liters/day 16,26,750
2.0 DESIGN CALCULATION FOR DOMESTIC WATER DISTRIBUTION HYDROPNUEMATIC PUMPS
SYSTEM
2.1 PUMPS DISCHARGE CALCULATION
Domestic water Demand per day = 964.0 m3
Assuming above demand (cumulative) being consumed during 4.0 hrs in a day, Peak flow in the System
would be
964/4.0 = 241 m3/hr
Assuming 4 Nos. Working + 1 No. stand by pump
= 241/4 pumps
= 60.25 m3/hr of each pump
2.2 HEAD CALCULATION
Head = Suction Head + Static Head + Friction Head + Residual Head
= 0.0 m + 68.0 m + 15.0 + 12.0m
TOTAL Head = 95.0 M
: Recommended duty of pumps for domestic water distribution pumps 67.5 m3/hr at 95.0 mt head
cut - in pressure : 8.5 Bars
cut - off pressure : 9.5Bars
( 4 Nos. Working + 1 No. Stand By )
3.0 DESIGN CALCULATION FOR FLUSHING WATER DISTRIBUTION HYDROPNUEMATIC PUMPS
SYSTEM
3.1 PUMPS DISCHARGE CALCULATION
Flushing water Demand per day = 662.0 m3
Assuming above demand (cumulative) being consumed during 4.0 hrs in a day, Peak flow in the System
would be
662/4 = 165.5 m3/hr
Assuming 4 Nos. Working + 1 No stand by pumps
= 165.5/4 pumps
= 41.375 m3/hr of each pump
3.3 HEAD CALCULATION
Head = Suction Head + Static Head + Friction Head + Residual Head
= 0.0 m + 68.0 m + 15.0 + 12.0m
TOTAL Head = 95.0 M
: Recommended duty of pumps for domestic water distribution pumps 45.0 m3/hr at 95.0 mt head
cut - in pressure : 8.5 Bars
cut - off pressure : 9.5Bars
(4 Nos. Working + 1 No. Stand By )
3.0 DESIGN CALCULATION FOR RAW WATER FILTER FEED PUMP
3.1 PUMPS DISCHARGE CALCULATION
Total Domestic water Demand per day = 1024.0 m3
Assuming above demand being treated during 18 hrs cycle, Peak flow in the System would be
1024/18 = 56.8 m3/hr
Assuming 2 Nos. Working + 1 No. stand by pumps
= 56.80/2 pumps
= 28.4 m3/hr of each pump
Pumps & treatment plant split into modular design having two Working units for ease of operation &
optimum sizes
3.3 HEAD CALCULATION
Head = Minimum 2.5 kg/cm2 pressure required for water treatment process so considered 30m head.
Head losses across the system 0.7 to 1 bar
: Recommended duty of pumps for domestic water distribution pumps 29.0 m3/hr at 30.0 mt head
(2 Nos. Working + 1 No. Stand By )
4.0 DESIGN CALCULATION FOR BASEMENT STORM WATER LIFT PUMPS
4.1 PUMPS DISCHARGE CALCULATION
Storm water tank capacity = 10.0m3
Assuming above demand being pumped during 20 mins, Peak flow in the System would be
10000/1200 sec = 8.0 lps
Assuming 2 Nos. Working
= 8 LPS pump
4.2 HEAD CALCULATION
Head = Suction Head + Static Head + Friction Head + Residual Head
= 0.0 m + 9.0 m + 1.0 + 2.0m
TOTAL Head = 12.0 M
: Recommended duty of pumps for domestic water distribution pumps 0.5 m3 at 12.0 mt head
(2 Nos. Working)
5.0 DESIGN CALCULATION FOR PUMP ROOM WATER LIFT PUMPS
5.1 PUMPS DISCHARGE CALCULATION
Final Capacity of WTP = 55.0 cum/hr
Assuming backwash @ 55m3/30min
Volume collected half flow of WTP Capacity
= 27.0 cum
Assuming 2 Nos. Working pumps
= Each pump capacity 4.0 lps
5.2 HEAD CALCULATION
Head = Suction Head + Static Head + Friction Head + Residual Head
= 0.0 m + 7 m + 1.0 + 2.0m
TOTAL Head = 10.0 M
: Recommended duty of pumps for above mentioned water distribution pumps 0.25 m3 (4 LPS) at 10.0 mt
head (2 Nos. Working)
6.0 DESIGN CALCULATION FOR IRRIGATION WATER LIFT TO IRRIGATION OHT PUMPS
6.1 PUMPS DISCHARGE CALCULATION
Fire water tank capacity = 10.0 m3
Assuming above demand being pumped during 60 min. Peak flow in the System would be
10000/3600 sec = 3.0 lps
Assuming 1 No. Working + 1 No. stand by pumps
= 3.0 lps
6.2 HEAD CALCULATION
Head = Suction Head + Static Head + Friction Head + Residual Head
= 0.0 m + 71.0 m + 4.0 + 5.0m
TOTAL Head = 80.0 M
: Recommended duty of pumps for above mentioned water distribution pumps 3.0 lps at 80.0 mt head
( 1 No Working + 1 No Stand By)
7.0 DESIGN CALCULATION WATER TREATMENT PLANT
7.1 WTP CAPACITY CALCULATION
Domestic water Demand per day = 964.0m3
Assuming above demand being treated during 18 hrs cycle, Peak flow in the System would be
964/18 = 53.5 m3/hr
Assuming 2 Nos. working plant
= 53.5/2 Nos.
= 26.75 m3/hr of each Plant
: Recommended Capacity of WTP for 27.5 m3/hr 2 sets.