Structural Steel Final Inspection Checklist

This document is a final inspection checklist for structural steel work on the XXXX PROJECT. It finds that the installed steelwork is dimensionally correct and properly located, positioned, and elevated according to the drawings. All bolts are the right size and length and have been torqued and marked as required. Paint touch ups were noted to be handed over to another company. The worksite was found to be clean.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views2 pages

Structural Steel Final Inspection Checklist

This document is a final inspection checklist for structural steel work on the XXXX PROJECT. It finds that the installed steelwork is dimensionally correct and properly located, positioned, and elevated according to the drawings. All bolts are the right size and length and have been torqued and marked as required. Paint touch ups were noted to be handed over to another company. The worksite was found to be clean.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

JOB Number: 10789

Scope of Work: gg3347

Structural Steel - Final Inspection

XXXX PROJECT
Description:
Steelwork Erection
Check List No.: OK-SSCL-10789-017 Date: 5/1/2017
CTS-19, CTS-19A, CTS-3A-1, CTS-3A-2, CTS-4A-1, CTS-4A-2, CTS-12A-1, CTS-12-2, CTS-12A-
Items : 3, CTS-13, CTS-23, CTS16

UK-ddd-01-31-102070
Drawings: AREA - 223

Ref: Check Description Complete

1 Correct steelwork has been installed & dimensionally checked. YES


2 Steelwork is at the correct location onsite. YES
3 Steelwork position and alignment is correct. YES
4 Steelwork elevation is correct. YES
5 The steelwork does not clash with adjacent items. YES
6 All bolts installed & of correct size & length YES
7 The correct lindapter type has been used. YES
Lindapters are square and clamping cleanly to steelwork, with no
8 YES
clashes.
9 All bolts have been torqued & marked. YES
10 50% of torque settings have been verified. YES
11 Painting touched up or added to punchlist YES
12 Drawings red lined. YES
13 Worksite is clean and free of tools & waste. YES
Comments:
Structural steel installation complete.
Paint touch up handed over to company.

Checked By Signature

Form OK-PD-10789-001 Page 1 of 2


10789

gg3347

5/1/2017
A-1, CTS-12-2, CTS-12A-

Complete

YES
YES
YES
YES
YES
YES
YES

YES

YES
YES
YES
YES
YES

Form OK-PD-10789-001 Page 2 of 2