PT.
Leighton Contractors Indonesia
RISK ASSESSMENT REPORT
Risk Assessment Team
Business Unit / Project : BU3/ID205/Wahana Coal Mine Project
Names Dept - Position Sign Off
Date : 28-Jul-12
Team Leader : Soni Wowiling HSE Dept Team Members :
Reference Number :
Facilitator : Richard Douglas HSE General Supt :
Process/Activity : Changing Tips Team Members :
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
Changing Tips Helper Crew, Flying object when Permanent disability, Long 2 2 4 1. TAKE 5 & daily pre start briefing 1 2 2
Mechanic Crew, grinding and hitty with term absence due to for clear instruction
Foreman, hammer. treatment EL/SUB EL/SUB
Supervisor Object fall onto
feet/hands
ENG/SEG 2. Energy Isolation (LOTO) ENG/SEG
ADM 3. Follow the maintenance manual ADM
book
BHV 4. Mechanical training/refresh BHV
training for mechanic (stored
energy)
PPE 5. Select correct tools for use PPE
6. Select correct stand for use
(SWL)
7. Good communication between
workers / work as a team
8. Ensure body of workers in safe
position to avoid pinched between
component
9. Follow manual handling
instruction
10 Follow the OEM
11. Use safety gloves & PPE
requires
12. Clean up / tidy up work area if
the task is completed
13. Support raised components with
stand (SWL)
14. Use PPE when welding
Uncontrolled Document When Printed 1 of 4 LCI-HSE-FM-001A(02)
Feb 2010
PT. Leighton Contractors Indonesia
RISK ASSESSMENT REPORT
Risk Assessment Team
Business Unit / Project : BU3/ID205/Wahana Coal Mine Project
Names Dept - Position Sign Off
Date : 28-Jul-12
Team Leader : Soni Wowiling HSE Dept Team Members :
Reference Number :
Facilitator : Richard Douglas HSE General Supt :
Process/Activity : Changing Tips Team Members :
Approved By :
(PM/Delegated)
Note: Attach meeting attandance if more.
Hirarchy Control
Hirarchy Control
Risk Identified
People /
Process / Activity / Task Environment at Hazard / Cause of Incident / Adverse L1 C1 RFN ** Current Mitigating Controls L2 C2 RRN * Additional Controls Requ
Risk Adverse Effect / Effect / Environmental
Environmental Aspect Impact
15. Install welding shild
16. Allow area to cool off
17. All welder must wear correct
PPE
18. Use correct PPE disc
19. Use correct cylinder disc
20. Use shield
21. Barricade area off
22. Use correct type of hammer
Uncontrolled Document When Printed 2 of 4 LCI-HSE-FM-001A(02)
Feb 2010
am
Names Dept. - Position Sign Off
ols Required By whom By When Status Legal and Other Requirements Reference
Uncontrolled Document When Printed 3 of 4 LCI-HSE-FM-001A(02)
Feb 2010
am
Names Dept. - Position Sign Off
ols Required By whom By When Status Legal and Other Requirements Reference
Uncontrolled Document When Printed 4 of 4 LCI-HSE-FM-001A(02)
Feb 2010