0% found this document useful (0 votes)
181 views1 page

Consultants/Contractors Confirmation Check List: Consultant/Contractor Undertaking

This document is a checklist for consultants/contractors to confirm that various electrical installation requirements have been met for a construction project. It includes 17 items to check such as proper placement and access of electrical rooms, segregated wiring for tenants, compliance with voltage drops and harmonic studies, correct load calculations, and protection devices. The consultant must sign an undertaking that the low voltage installation will be completed per DEWA rules and any issues found during inspection will be rectified without delay.

Uploaded by

Arul Sankaran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
181 views1 page

Consultants/Contractors Confirmation Check List: Consultant/Contractor Undertaking

This document is a checklist for consultants/contractors to confirm that various electrical installation requirements have been met for a construction project. It includes 17 items to check such as proper placement and access of electrical rooms, segregated wiring for tenants, compliance with voltage drops and harmonic studies, correct load calculations, and protection devices. The consultant must sign an undertaking that the low voltage installation will be completed per DEWA rules and any issues found during inspection will be rectified without delay.

Uploaded by

Arul Sankaran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

 

Consultants/Contractors Confirmation Check List


Project        : ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐           
Plot No        : ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Area: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
Owner         :‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  
  No  wet  area  like  toilet/bath  room/kitchen/Pantry/Laundry/Swimming  pool  etc…. Above electrical     
1  room.  Yes  …  NA  …
2  No MDBs/SMDBs/DBs are  installed under wet area or in wet wall Yes  …  NA … 
  All  electrical  rooms  are  designed  with  adequate  maintenance/operational  access for  the  switch     
3  gears/equipment/KWh meters/cap banks etc…as per DEWA rules.  Yes  …  NA  …
4  All electrical rooms are provided with unhindered access from the common corridor/ service area.  Yes  … NA …
5   Doors of all electrical rooms are not opening to the driveway /staircase/ramp/ outside plot Yes  … NA …
  All DBs/SMDBs/for the tenants are located /installed in the respective tenant area near to the front       
6  entrance.  Yes  … NA  …
  Segregated  wiring  for  each  tenant  area/metered  area  with  physical  separation  provided  with       
7  separate access to each tenant premise.  Yes  … NA  …
8  All cables are routed through common service corridor/area Yes  … NA …
9  Air‐conditioning ducts, chilled water lines are not passing through the electrical room. Yes  … NA …
  Voltage drop within the consumer installation is verified and found within the permissible limit (4%)       
10  from DEWA supply point to the final distribution point.  Yes  … NA  …
  Harmonic  study  has  been  carried  out  and  necessary  active/passive  filter  are  incorporated  to       
11  compensate the effect of non‐linear load.  Yes  … NA  …
  Number  of  light  points,  switched  socket  out‐  lets  and  commercial  load  of    equipments  fittings       
12  etc...Specified in the load distribution schedules  are correct as per the project summary schedule.  Yes  … NA  …
  Circuit  breakers/contactors  are  associated  with  Under  Voltage  (UV)  Relays,  having  'Auto  Closing'       
13  facility  to  restore  supply  for  Chillers/Air  Conditioning  Units,  after  normalization  of  supply  voltage,  Yes  …  NA  … 
when the relay reset automatically. 
  All  electrical  installation  shall  comply  with  adequate  earth  leakage/over  current/under  voltage       
14  protection as per DEWA technical specification/regulation.  Yes  … NA  …
  All Air‐conditioning units proposed for the project are designed as per DM approved thermal load       
15  calculation and is within the approved limit.  Yes  … NA  …
16  All equipments and installations are complying with Green Building Regulation Yes  … NA …
  All  provisional/proposed  future  loads  where  spares/space/standby  are  included  in  the  total       
17  connected load/Installed load.  Yes  … NA  …
 
Remarks:‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
 

 
Consultant/Contractor undertaking 
 
I/We  the  under  signed  hereby  agree  to  complete  the  LV  installation  as  per  DEWA  rules  &  regulations.  Any  discrepancies/deviations 
noticed during site technical inspection by DEWA will be rectified by us and we will be responsible for any delay for getting electricity 
connection to the project due to non‐compliance of this undertaking. 
 
                                                                                                                                                           Signature& Company Stamp:________________ 
                                                                                                                                                           
                                                                                                                                                           Name:__________________________________ 
                                                                                                                                                            
                                                                                                                                                           Designation:_____________________________ 
 
 

You might also like