0% found this document useful (0 votes)
62 views2 pages

Flight Booking Details for Projects

This document contains two flight booking requests. The first is for Louie Q. Tatlonghari and Arnulfo D. Angeles flying from Manila to Dumaguete on April 26th and returning on April 28th. The second is for Elmer V. Giray and Ernesto T. Giray flying from Caticlan to Manila on June 29th. Both requests include the travelers' names, dates of birth, contact numbers and note if they will have baggage. They were prepared by project coordinators and noted by heads before being approved by the VP of Operations.

Uploaded by

Camille Co
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as ODS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views2 pages

Flight Booking Details for Projects

This document contains two flight booking requests. The first is for Louie Q. Tatlonghari and Arnulfo D. Angeles flying from Manila to Dumaguete on April 26th and returning on April 28th. The second is for Elmer V. Giray and Ernesto T. Giray flying from Caticlan to Manila on June 29th. Both requests include the travelers' names, dates of birth, contact numbers and note if they will have baggage. They were prepared by project coordinators and noted by heads before being approved by the VP of Operations.

Uploaded by

Camille Co
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as ODS, PDF, TXT or read online on Scribd

Date : April 20, 2017

Attention : MR. JIMMY LAM


VP-Operations
Thru : MR. ROMAR SANTIAGO
Engineering Head
Project : Lhuillier Res. Project
Subject : BOOKING OF FLIGHT

NAME DATE OF BIRTH CONTACT NUMBER REMARKS

1. Louie Q. Tatlonghari December 27, 1978 w/ baggage

2. Arnulfo D. Angeles June 16, 1971 w/ baggage

DATE OF FLIGHT : April 26, 2017 MANILA to DUMAGUETE [Link] AM


April 28, 2017 DUMAGUETE to MANILA [Link] AM

PREPARED BY: NOTED BY: APPROVED BY:

CAMILLE RUTH DORADO ROMAR SANTIAGO JIMMY LAM


Office Engineer Engineering Head VP - Operations
Date : June 27, 2017
Attention : MR. JIMMY LAM
VP-Operations
Thru : MR. ROMAR SANTIAGO
Engineering Head
Project : DISCOVERY SHORES – BORACAY
Subject : BOOKING OF FLIGHT

NAME DATE OF BIRTH CONTACT NUMBER REMARKS

1. Elmer V. Giray September 12, 1995 w/ baggage

2. Ernesto T. Giray May 16, 1974 w/ baggage

DATE OF FLIGHT : June 29, 2017 CATICLAN to MANILA Anytime (Mas Mura)

PREPARED BY: NOTED BY: APPROVED BY:

RACHELLE DELACRUZ ROLAND GO JIMMY LAM


Asst. Proj. Coord. Project Head VP - Operations

You might also like