100% found this document useful (2 votes)
2K views4 pages

Anchor Bolt Inspection Report

The inspection report summarizes the anchor bolt inspection for the switchyard area of the Rajamandala Hydroelectric Power Plant 1x47MW project. It checks the location, material, quantity, leveling, and distances between anchor bolts before and after concrete pouring. No issues were found during the visual check and measurements based on the provided drawing references. The inspection was prepared and inspected by the signed parties.

Uploaded by

yudo heru
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views4 pages

Anchor Bolt Inspection Report

The inspection report summarizes the anchor bolt inspection for the switchyard area of the Rajamandala Hydroelectric Power Plant 1x47MW project. It checks the location, material, quantity, leveling, and distances between anchor bolts before and after concrete pouring. No issues were found during the visual check and measurements based on the provided drawing references. The inspection was prepared and inspected by the signed parties.

Uploaded by

yudo heru
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • Anchor Bolt Inspection Report: This section provides the inspection report template for verifying anchor bolts in construction with checks for visual and material verification, dimension checking against specifications, and additional notes.
  • Inspection Signature: Contains signature fields to authenticate and complete the inspection process, ensuring accountability.
  • Data Entry Form: Form for recording data entries related to the inspection findings, allowing detailed documentation and remarks.
  • Form Completion: Ends the document with a completion verification section for internal recording and future reference.

RAJAMANDALA HYDROELECTRIC POWER PLANT 1X47MW

ANCHOR BOLT INSPECTION REPORT


Description : Date :

Location : Switchyard Area Drawing Ref. : HH-E-EC-SY-D2-2248

Check Item and Result

A. Visual check (Location and Material Verification)

B. Quantity check

C. Vertical and horizontal leveling check

D Check the distance between anchor bolt (before concrete pouring)

E Check the distance between anchor bolt (after concrete pouring)

No. Description A B C D E Remar

Prepared Inspected
by Sign/date by Sign/dat
X47MW

E-EC-SY-D2-22480

Remarks
Sign/date

You might also like